14 hours ago, Onoff said:

Well the Chinesium bits did their thing. Make that Chinesium BIT as in I only used one. Forty two 25mm holes in 5mm 304 stainless plate aided by the odd squirt of finest Machine Mart cutting fluid from a Lucozade bottle. It's still SHARP FFS!

Come on give us a link then !

Posted
37 minutes ago, Mr Punter said:

 

Wow.  Never seen this before.  Is it just mortar?

 

Looking forward to seeing the flint infill (although obviously not trying to rush you).  The panels look more substantial than I imagined.

 

4:1 building sand/opc with added Integral waterproofer.

Posted
36 minutes ago, pocster said:

But then what ?

 

I miss the bathroom biblical epic ?

 

Jesus! Dig up stairs room adjacent to the bathroom to allow UFH routing to all other rooms, garden room, hip to gable conversion on the house, rebuild the stable, re roof and ewi the house, lounge diner knock through. Lower floors in kitchen, conservatory (and lounge). Excavate around whole house and slope land away from it, treatment plant, drive, storage over garage...

 

For now I might just do some infill fence panels either side of the pillars...

 

Not enough money or years left tbh! 

Posted
Just now, Onoff said:

 

Jesus! Dig up stairs room adjacent to the bathroom to allow UFH routing to all other rooms, garden room, hip to gable conversion on the house, rebuild the stable, re roof and ewi the house, lounge diner knock through. Lower floors in kitchen, conservatory (and lounge). Excavate around whole house and slope land away from it, treatment plant, drive, storage over garage...

 

For now I might just do some infill fence panels either side of the pillars...

 

Not enough money or years left tbh! 

Christ sake man ! Get a move on ! 
Even I’ll be finished before you I.e either completed or dead ? 

Posted
2 minutes ago, pocster said:

Christ sake man ! Get a move on ! 
Even I’ll be finished before you I.e either completed or dead ? 

 

I pray for 6 numbers or death. Don't think I'm joking.

Posted
Just now, pocster said:

123456 - there you go - now back to work ! ??

 

I promise if I win big I'll buy that glazing! 

  • Haha 1
Posted

Hey!  I’m praying for planning permission so I can use that walk on glazing on a house that I have no idea how we are going to pay for yet.  ??

  • Haha 2
Posted
15 minutes ago, Sue B said:

Hey!  I’m praying for planning permission so I can use that walk on glazing on a house that I have no idea how we are going to pay for yet.  ??

I have no idea how I’m going to pay for mine either - that’s all part of the challenge. !

  • Like 1
Posted
48 minutes ago, pocster said:

Very generous of you ???

 

Fingers crossed I win at least a tenner then! 

  • Haha 1
Posted

Bugger! Second pillar was going so well and we were paying closer attention to the joint thicknesses. I'd done a couple of arbitrary laser checks between pillars on the lower courses which said it was nom 20mm out one side to the other but then just carried on with this second one. Bear with me, just venting here, but I think I know how I'm going to mitigate unless any better suggestions.

 

Both columns will be 32 bricks high. Nom 75mm per course as in 65mm brick + 10mm mortar.

 

Looking from the front the first pillar is too high. At 26 bricks high its 1960mm where it should have been 1950mm by design (26x75=1950). The second pillar at 26 bricks high is 1930mm so 20mm too low.

 

Its round the back things have gone a bit wrong for some reason. 

 

I've not yet finished the second pillar:

 

2019-10-23_09-41-35

 

On the first pillar course 30 pretty much sits under the 100x100 gate member:

 

20191023_093333

 

20191023_094444

 

To the extent that to maintain a gap around the steel I cut a section out of the brick.

 

20191023_094512

 

Also did the top brick so it looks symmetrical:

 

20191023_093355

 

HOWEVER...the second post is coming out 45mm too low. Brick 30 will pass under it by a mile.

 

From the top of brick 30 to the the top of the grey post is 145mm. The top of brick No32 would therefore be just about level with the top of the post rather than showing a good, notched out chunk like on the first pillar above. 

 

20191023_093717

 

I think sitting here back in the warm that the grey posts are sitting at different heights. Off to measure/laser in a minute. 

 

If I do nothing and carry on then the front, road view will look right but the rear won't. Saying that pillar 2 will be forever covered by the gate.

 

Tempted to up these last 6 courses mortar joints from 10 to maybe 12mm to help mitigate the rear. That'd put the top of the brick about 20mm above the steel. I want to maintain some clearance around the post where it comes out of the pillar as there's some deflection if the gate is banged hard. Shouldn't tbh be a huge issue once the motor is driving it.

 

Off into the damp/cold for some more mulling! ?

  • Haha 1
Posted

 The first gate post is pretty much 20mm lower than the second. All pretty plumb and level, just lower:

 

First post / pillar:

 

20191023_111200

 

Second post / pillar:

 

20191023_111236

 

Thinking for a start to cut off and reweld the high post 20mm lower, might even get 25mm lower. It'll mean too trimming where it's slotted to engage with the gate. 

 

2019-10-23_12-05-56

 

2019-10-23_12-12-40

 

My roller assembly (though it works a treat) was a "temporary" lash up of Buffalo board cut to fit inside the box, nuts, bolts and reinforced hose. Very resilient and quiet:

 

SAM_8315

 

Out with the set square & grinder then I suppose!

 

 

 

 

Posted

Why is a 20mm difference a worry...?? Can make that off in the last couple of courses and the mortar under the pillar cap..??

  • Like 1
Posted
35 minutes ago, PeterW said:

Why is a 20mm difference a worry...?? Can make that off in the last couple of courses and the mortar under the pillar cap..??

 

Erm...I like making work for myself?

  • Sad 1
Posted

Off down the modification rabbit hole I went...

 

Drilled 4 more holes to be able to move the roller assembly up, shortened the downward leg by 25mm and extended the slots. Also drilled 20mm holes through the top like on the other post for an M16 "safety" bolt (should the welds ever fail).

 

20191023_152303

 

20191023_152404

 

A quick flap disc:

 

2019-10-23_03-55-52

 

And a lick of galv spray as a holding coat:

 

2019-10-23_04-35-04

 

Next I'll lop off the L shape bit to weld it back on 25mm lower.....when I can find the backing nut for my 9" grinder..... ?.....last used when I cut the first stainless lintels up....probably stuck to the slitting disc.....now where's that.....

 

 

 

 

 

 

 

  • Sad 1
Posted
On 22/10/2019 at 17:44, pocster said:

I miss the bathroom biblical epic ?

 

Like that's over!

 

Update coming soon...my kinda soon...

  • Haha 1
Posted
4 hours ago, Onoff said:

 

Like that's over!

 

Update coming soon...my kinda soon...

Goodie !

It‘s like Eastenders . You don’t really follow it but it feels wrong when it’s not on .

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...