Jump to content

Recommended Posts

Posted

"Feet", if I'd have looked harder I could have found fully threaded I'm sure. Reckon I might need to die these down:

 

 

20180815_184406

 

Waiting for everything to dry... ;)

 

20180815_184438

 

Posted
  On 15/08/2018 at 18:03, Onoff said:

 

If only all Kent girls thought like that... :ph34r:

Expand  

 

I’m sure most of us do in truth. Maybe you don’t approach things the right way ? ⛓⛓⛓

  • Haha 1
Posted

This has legs!

 

Longer, fully threaded bolts needed here and there! I've some coach bolts...maybe CT1 rubber on the domed ends again...or I'll tack some nuts to M10 studding.

 

20180815_205515

 

Stupid boy Pike! 

 

If I'd have mitred the other way I could have clamped the sections together for stability:

 

20180815_205611

 

 

Posted

Love the way you determine the exact position of the bottom edges of the full tiles: size of a box of staples + the height of the laser.

Posted (edited)
  On 15/08/2018 at 21:05, Ed Davies said:

Love the way you determine the exact position of the bottom edges of the full tiles: size of a box of staples + the height of the laser.

Expand  

 

:)Just proof of concept at the mo! 

 

It usually sits on a dedicated little shelf.

 

20180815_220740.thumb.jpg.53fc54b519ffe1adbf9c92730575221d.jpg

Edited by Onoff
Posted

On the assumption the tile butts up tight to the u/side of the trim on the shelf and I'm 4 and a bit tiles to the floor then I need to set the top of my support angle:

 

250+3+250+3+250+3+250 = 1009mm

 

... from the underside of the trim / bottom shelf of the pocket. 

 

I think...

Posted
  On 15/08/2018 at 21:05, Ed Davies said:

Love the way you determine the exact position of the bottom edges of the full tiles: size of a box of staples + the height of the laser.

Expand  

Very sorry Ed, but its BH policy that members who dont yet fully feel our pain are politely reminded not to encourage this madman. ;) 

Were trying to get it tiled and grouted before xmas. Dont ask which xmas PLEASE !

:D 

  • Haha 5
Posted

I’m still going to finish my entire build before @Onoff gets this bathroom complete .

I told swmbo ( spell check put demon in there !!!! ) about his biblical saga . She now thinks I’m working quickly !! ??

  • Haha 1
Posted
  On 16/08/2018 at 08:36, pocster said:

I’m still going to finish my entire build before @Onoff gets this bathroom complete .

I told swmbo ( spell check put demon in there !!!! ) about his biblical saga . She now thinks I’m working quickly !! ??

Expand  

 

I reckon your missus is secretly wishing you took as long and paid as much attention to small details as I do! ;)

  • Haha 3
Posted
  On 16/08/2018 at 09:24, Onoff said:

 

I reckon your missus is secretly wishing you took as long and paid as much attention to small details as I do! ;)

Expand  

 

.... is this so she doesn't have to talk to him as much...??? 

 

I was at one point going to merge the two bathroom threads but you have to do it so it interleaves the responses and at nearly 100 pages in both......

 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...