Just had a good look at the foundation masonry done by the brickie last week and it’s rough.

 

he say it doesn’t matter as it’s not seen.

 

 

image.jpg

image.jpg

image.jpg

Posted

Hmm. What does that out-of-plumb bubble represent? How far is it leaning in how tall?

 

From LABC Warranty:

"How far out of plumb can a wall be in the UK?

Wall panels should be erected to the following tolerances: • +/-10mm from plumb per storey height. +/-10mm from plumb over the full height of the building. +/-3mm from line of sole plate, with maximum +/-5mm deviation from drawing". In pic 3 (with a slack line on top of the blocks) where was the line when the blocks were laid?
 
Is this the brickie you were planning to use above ground?
 
 
 
Posted

IMO, do NOT use this person for anymore work, particularly above ground. 

 

I had someone do some work for me recently who I can heartily recommend, based RG6 4 postcode area (S Reading)

 

PM me for details

  • Like 2
  • Thanks 1
Posted
44 minutes ago, Redbeard said:

Hmm. What does that out-of-plumb bubble represent? How far is it leaning in how tall?

 

From LABC Warranty:

"How far out of plumb can a wall be in the UK?

Wall panels should be erected to the following tolerances: • +/-10mm from plumb per storey height. +/-10mm from plumb over the full height of the building. +/-3mm from line of sole plate, with maximum +/-5mm deviation from drawing". In pic 3 (with a slack line on top of the blocks) where was the line when the blocks were laid?
 
Is this the brickie you were planning to use above ground?

That vertical bubble is only over two courses.  

 

Yes, this was the brickie that we were planning on using, but he'll be given his tools tomorrow morning from the lock up.  It's very disheartening that a tradie think that work is acceptable.  I've just got my laser level out and the corners of the garage are 20mm out on the horizontal.  There is also a block that's got no vertical mortar, it's literally directly butted to the adjoining two blocks.

 

 

Posted (edited)
7 minutes ago, flanagaj said:

I've just got my laser level out and the corners of the garage are 20mm out on the horizontal.  There is also a block that's got no vertical mortar, it's literally directly butted to the adjoining two blocks.

That is SH1T - a technical term 🙂  What I'd expect from a week 4 apprentice.

 

I'll PM you the details now!

Edited by BotusBuild
  • Like 2
Posted (edited)

I used to hate doing footings and blockwork in trenches, because I did not do it that often. However these were generally small - medium extensions where the footing job was too small to be of interest to a busy brickie. So I was really picky of my own work... So my out-of-plumbs' or 'out-of-squares' were tiny, as I was always pulling myself up - and checking again... and again... 

 

To lift a term (thanks @BotusBuild) you need someone who gives a sh1t - sounds like @BotusBuild knows the person. Good luck in the 2nd go.

Edited by Redbeard
  • Like 1
Posted

That block-work is shockingly poor. 
 

Zero GAF, and there’s no way whatsoever that person should be doing anything for face work.

 

If you don’t care about stuff that’s not on show, to that extent, as the horizontal line looks like a waveform, then there won’t be much more care for the remainder. 

 

Shite. 

  • Like 1
Posted (edited)

I'd paid them for the days they did and now I still owe him £250 for some engineering bricks, but I'm in two minds whether to tell him that he can take the £250 out of the £550 I paid him.  Just undecided whether it's worth the aggravation.

 

Edited by flanagaj
Posted

Why are you building sub-floor blockwork in cavity construction? Would be better solid - plus easier and quicker to build.

Posted
2 minutes ago, ETC said:

Why are you building sub-floor blockwork in cavity construction? Would be better solid - plus easier and quicker to build.

He said he was happy to do cavity blockwork.  I'll ask the next bricklayer whether he'd prefer trench blocks.  

Posted

@flanagaj

 

Could you please answer some fundamental concerns? Otherwise I'm close to losing interest in helping.

 

Have you planning permission?

Have you a construction design by Achitect/Engineer/skilled builder?

Have you appointed a building inspector? If so are they happy with you?

Do you have a thought out plan re construction management and details at interfaces?

Do you have builders lined up or is it a sequence of one after another?

 

Im concerned for you.. this could go very wrong indeed. But this forum is for advice not managing your whole project.

 

This is where the Scottish system has its main benefit.. you can't start and make it up as you go. Maybe you should go the "full plans" route too.

 

Posted
5 hours ago, saveasteading said:

Maybe you should go the "full plans" route too.

For a newbe self builder I would have thought that full plans is a very good idea/essential.

  • Like 1
Posted
49 minutes ago, Gone West said:

For a newbe self builder I would have thought that full plans is a very good idea/essential.

 

+1.  For a new dwelling a full plans submission is needed.  Building notice is OK for small works only.

Posted (edited)

It was a full plans application and yes we have planning.  Nothing has changed in relation to the drawings and the builder who was partially retired bit off more than he could chew.  I felt sorry for him, but the drawings clearly showed 7N blocks below DPC.  The fact that he struggled to lay them accurately is not down to me.  The joys of hiring trades in an area where you know nobody.

Edited by flanagaj

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...