Hello, just a quick introduction from me. Female with an offer accepted on 2 acres of land with a derelict barn on site with planning permission granted. I have lots to learn to guide me through this process of checking this barn is viable before I exchange contracts. Finding a decent builder to guide me through the process of the rebuild and hoping to gain support for all those decisions along the way within this forum. I'm hoping then to be able to help others with my gained knowledge. Julie 

  • Like 1
Link to comment
Share on other sites

Morning @MrsB. Welcome.

Is this too early to nudge you into thinking about one or two things?

 

I am guessing- please forgive me if I'm wrong. You might be some way away from a main sewer. I read the words '...viable...' above.

No foul drainage, no house. Get that issue sorted early on in the development. Have a read of this

 

Please don't confuse my status as Admin with expertise. I am not an expert. But my heart was in my mouth the moment I realised that lack of a foul drain would mean no house for us. Don't worry too  much; at this stage finding out the exact details in relation to drainage will useful information in preparation for an eventual exchange of contracts.

 

When there's a hiccup, come back to us and we'll all pile in to help.

Ian 

  • Like 1
Link to comment
Share on other sites

Welcome MrsB

 

Potentially an interesting build. Are the pre-commencement conditions discharged, and if not do you know the costs for achieving this? As it's a Change of Use from Agricultural there's likely a contamination condition, which may be simple to discharge, unless the site walk-over high lights any contamination risks and then it could start to get costly.

 

How about CIL? Has the local council signed up for the Community Infrastructure Levy, and if so who's responsible for paying it, you or the seller. The Barn may be exempt if it has been used for its lawful purpose for at least 6 months in the last 3 years, but this needs to be understood. If not you may be able to get self-builders exemption, there's a recent post on the forum that links to all the rules.

 

With regards being structurally viable, part of the planning application will likely have included a structural engineers report to confirm this. Most Councils wouldn't allow a Change of Use on a Barn that wasn't structurally capable of the conversion. But, this will have been commissioned by the person that submitted the planning application so may be a little biased.

Edited by IanR
  • Like 1
Link to comment
Share on other sites

Hi and welcome to the forum.

 

Another one here advising to get a drainage solution agreed first. This caused us several weeks of worry when building control rejected what I thought wa a workable drainage system, and for several weeks we had no solution = no building warrant, until a compromise was agreed.

 

Is it a listed barn? If not, a complete new build (probably keeping the look and feel of the original barn) would probably be the better option?
 

  • Like 1
Link to comment
Share on other sites

Thank you all for a terrific and speedy welcome. Advice coming in thick and fast so I'm going to sit and read through your comments and act or respond accordingly.  

We do have planning permission with the drainage being taken care of by a bio mass system. Julie 

Link to comment
Share on other sites

Another vote for getting the drainage sorted before anything else! 

 

Before we made an offer on our plot I checked the situation with foul drainage and a water supply.  The cheapest mains drainage solution was £14.5k to get the pipe up the lane and connected to the main drain, plus another £1.5k for a pump station and all the associated work on site.  When I enquired about a treatment plant the initial answer was a very firm "no" from the Environment Agency, because of the soil being clay.   The planners couldn't care less, and had granted a previous planning application when there was no affordable means of getting a drainage scheme on site!

 

We bought the plot for a much reduced price, knowing we'd have to spend a lot to get water and drainage sorted, and I managed to persuade the Environment Agency to allow us to have a treatment plant and grant a licence to discharge it into the stream that runs alongside the plot.  That saved a fair bit, as fully installed, with all the on-site drainage pipe, I think the cost came to around £4k,

Edited by JSHarris
  • Like 1
Link to comment
Share on other sites

2 hours ago, ProDave said:

Hi and welcome to the forum.

 

Another one here advising to get a drainage solution agreed first. This caused us several weeks of worry when building control rejected what I thought wa a workable drainage system, and for several weeks we had no solution = no building warrant, until a compromise was agreed.

 

Is it a listed barn? If not, a complete new build (probably keeping the look and feel of the original barn) would probably be the better option?
 

I'll look into the drainage issues next but couldn't help but pick up on your comment about your suggestion of a complete new build @ProDave. The barn is not listed but I was unaware that its possible to do that, I'm really new to all of this, I'm really keen on the location and size of this plot and as a newbie to all of this would feel less anxious with a new build with a similar look. Do you know where I would be able to start finding out if I could please? Much conflicting advise from builders/architects

Link to comment
Share on other sites

I presume the existing planning is for conversion of the existing barn?  To replace it with a new build would require a new planning application. If the barn is not listed and the new build is a similar footprint and design to the barn, then the chances of getting planning are probably good. I know someone up here who bought a stone barn for conversion, but found the existing structure was in poor condition so he got planning to replace it with new following the same outline. He built with timber frame and clad the outside in the original stone.
 

Link to comment
Share on other sites

If your Planning is for a "Change of Use", or "Conversion" then that won't allow a knock-down and rebuild. Councils will often monitor how much of the original building will still be present in the converted building.

 

The reason for this is that in general agricultural buildings are in a rural setting and outside defined settlements, so the planning policy will be against development. However, there is a contradicting policy that allows the re-use of redundant agricultural buildings, when they are suitable for conversion, deemed to be in a "sustainable" location, and there development will not be over-bearing on the rural setting.

 

If the planning has been granted for the re-use of a redundant building, you can't then knock it down and rebuild. So, it depends on what you have planning for.

Edited by IanR
Link to comment
Share on other sites

34 minutes ago, IanR said:

If your Planning is for a "Change of Use", or "Conversion" then that won't allow a knock-down and rebuild. Councils will often monitor how much of the original building will still be present in the converted building.

 

The reason for this is that in general agricultural buildings are in a rural setting and outside defined settlements, so the planning policy will be against development. However, there is a contradicting policy that allows the re-use of redundant agricultural buildings, when they are suitable for conversion, deemed to be in a "sustainable" location, and their development will not be over-bearing on rural setting.

 

If the planning has been granted for the re-use of a redundant building, you can't then knock it down and rebuild. So, it depends on what you have planning for.

Thank you for the insight into that issue Ian.

The site has permission for Demolition of existing dwelling and construction of a replacement dwelling and erection of a detached double garage and the conversion of existing barn and part adjoining out-buildings into one dwelling @IanR. So the 2 acre plot will have 1 new build and one conversion, I hope that makes sense. J

Link to comment
Share on other sites

5 hours ago, recoveringacademic said:

I am guessing- please forgive me if I'm wrong. You might be some way away from a main sewer. I read the words '...viable...' above.

No foul drainage, no house. Get that issue sorted early on in the development. Have a read of this

Or watch last evenings 'building the dream' where a £5K budget for services ended up costing north of £40K!

 

PS Welcome to the ultimate social network where plumbing gets the most attention and off topic non building is the second most important thing we chew the fat over. Although having said that there isn't much about building that is not covered here one way or another. Two three simple rules: 

 

  1. To get an answer you have to ask a question - so keep it tight if you really want an answer as floating idea can cause responses to spiral all over the place
  2. The mind is like a parachute it is only useful when its open - so be prepared for the answers to be somewhat out of the box!
  3. You don't have to be mad to self build but it helps - the journey is hard, sometimes frustrating, always feels expensive and mostly very rewarding.

Good luck

  • Like 1
Link to comment
Share on other sites

10 minutes ago, MrsB said:

So the 2 acre plot will have 1 new build and one conversion, I hope that makes sense. J

 

It does, and if you plan to do both builds yourself you have more to think about regards getting them both CIL exempt, recovering VAT and mitigating Capital Gain

Link to comment
Share on other sites

7 minutes ago, MikeSharp01 said:

Or watch last evenings 'building the dream' where a £5K budget for services ended up costing north of £40K!

 

PS Welcome to the ultimate social network where plumbing gets the most attention and off topic non building is the second most important thing we chew the fat over. Although having said that there isn't much about building that is not covered here one way or another. Two three simple rules: 

 

  1. To get an answer you have to ask a question - so keep it tight if you really want an answer as floating idea can cause responses to spiral all over the place
  2. The mind is like a parachute it is only useful when its open - so be prepared for the answers to be somewhat out of the box!
  3. You don't have to be mad to self build but it helps - the journey is hard, sometimes frustrating, always feels expensive and mostly very rewarding.

Good luck

 

Off-topic?

 

Us?

 

An outrageous slander !

 

@MrsB

The further thing I would say is be prepared to take a lot of time (as in elapsed time) - if you are going the "build two and sell one" route, there are a lot pf wrinkles around developer or not, tax efficiency and so on.


Ferdinand 

Link to comment
Share on other sites

1 hour ago, MrsB said:

I'm only buying one property, my son is buying the other. We have just put in an offer for the plot together.


 

It would probably be wise when purchasing the plot(s) to get the title split into two at that time so you each buy half the total area (or however you wish to split the plot) since you will be employing solicitors, so there is no confusion that you are both self builders each building one house for yourself on your own plot. The fact you are related and the plots are next door is then irrelevant.
 

  • Like 1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...