Everything posted by ETC

  1. The door and the patio can be level. The DPC in the external leaf to each side of the door needs to be 150mm above the FGL. If this cannot be achieved - where the DPC in the external leaf is not 150mm above FGL install an ACO drain.
  2. Seems a bit contradictory having a keyhole in a fire door.
  3. The rational is quite simple: All walls need a DPC. The finished ground level needs to be 150mm below the DPC in the external wall. If your builder hasn’t stepped up the DPC in the outer leaf at the door so that it is 150mm above FGL put an ACO drain in across the width of the patio.
  4. Why did you reduce the material inside the footprint of the foundations?
  5. @Lord Greyabbey If you’d like me to elevate the rest of the elevations let me know.
  6. Get your SE to design a reinforced slab. Gets rid of the sub-floor void and all ventilation terminals.
  7. It is. BC won’t care about overlooking. They will care about distances of windows (unprotected areas) from a boundary.
  8. BC will not get involved other than to say it’s not acceptable. They won’t give a written opinion for use in court - only a letter to the applicant following an inspection to say that the works do not comply with the Building Regulations.
  9. I know - that’s the point. There is no point in getting BC to get their knickers in a twist because they won’t be able to get the supplier or installer to do anything - it will always be up to the applicant to sort this out - however he dose this.
  10. To be sorted by the applicant - not the supplier of the glazing system.
  11. The channel doesn’t look as it it is fixed properly to the floor. BC will ask for the balustrade to resist a horizontal force of 0.36kN/m. I’m surprised the SE you contacted wouldn’t help. A blind man on a galloping horse can see that the balustrade isn’t fixed properly.
  12. Highly unlikely - BC’s relationship will be with the applicant and BC will put the onus on the applicant to sort the problem out.
  13. Speak to Building Control. They will give you all the information you need.
  14. Hate to be pedantic but balusters need to be spaced so that a 100mm sphere CANNOT pass between them. Slight difference but less than 100mm. I’d normally suggest 100mm maximum centres. Works for most infill balusters.
  15. Looks like a steel fabricator’s dream job - far too much steel! Why are you stepping the ground floor out or stepping the first floor in from the ground floor. Seems strange and expensive. Don’t forget that you will need 400mm minimum at the bottom of the stairs.
  16. https://glidevaleprotect.com/products/roofing-ventilation/
  17. Keep both roof “cold” and put in ventilation.
  18. Confusing DPC with DPM. DPM goes in the floor not a jamb-which would normally incorporate a DPC where there is a cavity wall and if there is a potential route for moisture from the outside leaf to the inside leaf.
  19. That’s very kind of you to say. Thank you.
  20. I think you are being a bit disingenuous towards architects. Lol at “complicated design work”.
  21. I’d like to offer help to anyone who needs help doing drawings or designing their home or extension. I'm a Registered Architect with some time on my hands. I use my iPad and an app called Concepts to draw and have already helped out a few Forum members.
  22. Don’t forget that you will need through ventilation for BOTH cold roofs. You will need continuous low-level ventilation to the main roof at the junction of the main and flat roof. You will need low and high-level through ventilation to the flat roof. Personally I’d get a condensation risk analysis done - quick phone call to Kingspan - than muck about with trying to get ventilation. Whichever option you go for the main roof will need ventilated along the junction of the flat and pitched roofs.
  23. http://www.buildingcontrol-ni.com/assets/pdf/BCNI_CONSTRUCTION_DETAILS_-_March_2021.pdf
×
×