Jump to content

JohnMo

Members
  • Posts

    13125
  • Joined

  • Last visited

  • Days Won

    196

Everything posted by JohnMo

  1. That's the smart solution. If you put it in a bag you will soon learn all about it. True, about the same as 20mph wind, hitting all sides of the building at the same time.
  2. Wouldn't want to have my heating system reliant on so called smart stuff, use something that has internal control for time and temp, that can be accessed remotely. Keep it simple. Then should you loose internet, or home assistant switches off or doesn't want to play, it all runs regardless. I dabbled and nearly had my head on a spike.
  3. Although 3kW is a 13A draw, you would really need 16A switching for long term reliable operation. Why do you need 3 immersion heaters?
  4. When I was screwing into stuff I put a blob of hybrid silicone stuff on the screw. Whether it made any difference who knows? Once a screw is in the wood the wood contracts around the thread, so I doubt there will be any leaks anyway. Ours aluminium faced so used aluminium tape to cover all the staples.
  5. I asked AI got this answer when asking about graphite embedded in EPS insulation Value is added because the "air space" required for graphite to reflect radiant heat is actually located inside the material itself, not as a separate external gap between the insulation and the concrete. 1. Internal Reflection Within Micro-Cells Graphite insulation, specifically Graphite EPS (GPS), is composed of individual closed-cell beads. Even when tightly embedded in or under concrete: The "Air Space" is Internal: Each bead contains millions of microscopic trapped air pockets. Infrared Mirroring: The graphite particles are infused into the walls of these tiny internal cells. As radiant heat attempts to travel through the board, it hits these graphite "mirrors" and is reflected back and forth hundreds of times within the cellular structure. No External Gap Needed: Because this reflection happens at a microscopic level inside the insulation board, the board can be in direct, "intimate" contact with concrete without losing its reflective benefits. 2. Physical and Efficiency Gains Even without an external air gap, graphite adds measurable value over standard white insulation in concrete applications:
  6. Doubt in an UFH system. There is no space for radiation to occur.
  7. Give them a wash over with diluted bleach, to kill the mould spours.
  8. Really wouldn't to hung up on the UFH that has been installed, you will have ample output. Just follow some basic steps to commission it Set all flow meters at full flow. Start with a WC curve something like 20 flow at 15 outside and 30 at -3. Once you have the heating on leave to heat soak for 24 to 48 hrs. Any areas that are too warm, trim the flow rate down for the loops in those areas. If everywhere is too warm, trim back the WC curve at the cold outside end. If everywhere is too cool, add flow temp to cold outside end. Just a bit of a balancing act.
  9. Gentle slopes instead of steps. Would expect you are inviting trouble with water ingress and damp issues not following normal practice. Or you do path at what ever level you want, say at dpc level, but on the house side you have a 150mm drop and an area filled with gravel to act as a soak away, to keep water away from dpc. There are plenty of ways not have ground level at dpc level.
  10. your temperature swings look uncomfortable to me. I doubt the large swings in temperature save you much either. You may find it more comfortable setting the high temperature lower - say 19 to 20 and small set back to say 18, this will allow the fabric of the building to get warmer, heat pump have to work less hard. The work cycle will be a small increase in room temp and then tick away, rather than balls out switch it off, balls out repeat. I would try different things while monitoring outside and room temp, but also electric consumption.
  11. You are only allowed zero vat when working under planning permission. At sign off of a completion certificate (you are stating you are complete) thereafter you are no longer working under planning permission, as that has been closed. Fudging and using a no longer valid planning number is down to you, but not for me say it's right/wrong on an open forum.
  12. Your more correct the guy is a kn0b and shouldn't be let through the door.
  13. Once you have a completion certificate, until then you are still building. If you have a completion certificate by default you have said you are finished
  14. If your checking the pressure of the expansion vessel, you need to depressurise it, otherwise you are just reading system pressure. Ideally it will have an isolation valve and bleed point at the expansion vessel to allow this test. Otherwise it's a pain. Overlapped post with @Nickfromwales
  15. You don't really need to zone a fan coil, as you can program the fan coil, it will just modulate or switch off the fan as needed. If you add a zone valve, you start to drive your way towards a buffer. Better to leave the fan coil in circulation system all the time.
  16. But it still takes no credit for MVHR so as pretty rubbish, for anything better than an air test score of 3, which then has MVHR.
  17. Really wouldn't do it myself,dip hands into your pocket and pay for a professional service.
  18. No experience but would make this comment, one part fails no heating, maybe no hot water or ventilation. Keep them separate. I'm moving towards, direct cylinder heat with off peak electricity, on separate controls from ASHP, so stand alone control (simple immersion timer) Simple ASHP install, just doing UFH and or fan coils on weather compensation. Separate MVHR, no heat or cool. All simple cheap to install, one bit fails, easy to replace.
  19. You still have to careful your not just wasting £300, with sh!te in sh!te out. I would get UFH in, which I think is done, make provision for ducts for pipes and cables through wall. Seal them up until after air test. Get house air test done, get MVHR in and commissioned, then if going down MCS route go get the survey done. Without all that in place there is a good chance it will be treated as default values for ventilation heat loss. Or just don't bother MCS at all, spend £2500 on a suitable sized heat pump, buy a 200L direct cylinder - install. Power cable and communication cable to outside unit and two pipes to UFH manifold. Then claim VAT back as it's a new house. Little over £3k in materials claim around £600 vat back, so £2400 plus a little labour.
  20. I found the driver for the led lights was the biggest thing. We did a 50mm service void in all ceilings. It's not just the light fittings it's also cables and driver. Also led lights need a good place to dump the little heat they make, so would suspect installing in insulation will result in a short life of the light.
  21. I would be figuring out how to fix that. Get flow rate up, dT down and therefore required flow temp down and CoP up.
  22. I would say have the wood away from the ground, I use hot dip galvanised metal plates concreted into the ground and built the structure from there. Build heavy duty, not lightweight, I have perimeter structure in doubled up 10x2, infill is all 6x2 on 400mm centres. It's super solid under foot I used composite boards.
  23. Not really the tax payer is, they shouldn't be charging you that. They get approval for the grant before they start. Maybe because they are super expensive, before you add other stuff. Plus from the sounds of it, was doing the install via an umbrella scheme. Not a bad thing, but he's taking the piss charging up front, as the MCS umbrella company wouldn't be charging him.
  24. Are you actually having to pay any thing for this ASHP install?
×
×
  • Create New...