Pantry / utility aka dungeon š
-
Ffs ! It has been suggested many times on this forum ! ; as it allows time to fix joints ! . Usually I do normal solvent weld but on a tricky joint where I might need a bit of play I go pu route as it buys time . Ultimately does it matter ? . Honestly ! Follow advice on here . Quote it back at a later date . Then told itās wrong !!
-
Push all the pipework together dry fit . Mark a line on each bit matching a line on the next . Glue with tiger seal or similar so no pressure to get right in 3 seconds . Easy peasey !
-
Now you know why my ceiling looks a mess š¤£š
-
Nobody lives in Milton Keynes ; they simply exist .
-
Iām no fan of any party as they are all liars and self serving pricks . But ! Iāve got a feeling Labour might get in as obviously tories will be blamed for brexit , Covid , inflation , house prices etc. the list is endless . Labours current ā policies ā ( aka more bs for the electorate ) on housing rental and build are ridiculous. But then , if they win they then dilute what was promised and we end up with simply different shite .
-
Itās not the final inspection. I asked when to come out next , 6 yrs ago ; they said when finished . The only reason theyāre out now I because I submitted a stair design for approval as recommended by the stair supplier . I woke the zombie !!! .Contractor on my site ? - thatās been me for the last decade š¤£š
-
I was only being usual !
-
I agree 100% . I need to wait ( always difficult when you want to bury the (expletive deleted) ) . As I said my gut feeling is ; once I supply bs documents it will all fade away . But what a bs farce it truly is !
-
I agree ; itās not a ānice ā arrangement. I probably years ago forgot and designed the door to be more suitable/ normal . As I mention Iāll get over this issue !!
-
Bco also lying or āsuddenly ā catching up . All these things were noted 6 yrs ago - but no one told me ! . Gut instinct is they probably were noted . Now bco wants to cover his arse ā¦.
-
Photo attached of typical steel . The ceiling tile company can only supply a fire rating based on a ātestā from the manufacturer of a test setup theyāve constructed to get a fire rating ! . Iāve sent bco the 75 page report š«¤
-
Thanks . Thatās a good plan . Itās all about someone taking liability !
-
Wouldnāt surprise me . My only real concern is the rsjās not fire proofed - nothing in my plans for that though admittedly it does show them plasterboarded over and mine arenāt . So we will now continue the argument of does the suspended ceiling provide 30 mins fire protectionā¦
-
Oops my bad!. Missed this one!! Bathroom door does open inwards when it shouldn't. The argument he gave was if someone fell on the floor in the bathroom you can't open it because their body is in the way. I've emailed back to BCO and said but if the bathroom door opened outwards and I was in the bathroom and someone collapsed outside the bathroom I can't get out. I then suggested if 2 people either side of the door collapsed neither could get out due to being unconscious and the other in the way. Perhaps bathrooms should have no doors. He's yet to reply to that.
-
No warranty provider . I always keep emails and have photoād everything . Itās like he wants the cemex spec for (expletive deleted)ing blocks for example . To ask for things they noted 6 yrs later is a piss take . But Iāll wait and see how it plays out initially ā¦
-
As I have a SolarEdge battery I was thinking of adding another . My inverter outputs upto 3.68kwh . So charges 1 battery from grid in around 3 hours . My off peak charge window is 4 hours . So with twice the storage Iām not going to fill them both . Presumably I either replace the current inverter or add a 2nd one ; which is best ? Also do I need to inform DNO ? . Not looking to increase export just ādraw ā ā¦.
-
Checking back 10 years into my emails , there it is . Soil sample report sent to building control . Ive been here before with planning where they are adamant I havenāt done something , when I have . Iāve sent bco some stuff already . Iāll see their response . If they want to get shitty Iāll start bringing up all the things Iāve done and can prove . Usually I mention I might make a formal complaint - this tends to accelerate the ā tick box ā process ⦠Itās all incompetence and BS
-
Now bco are saying thereās no evidence of the soil samples from 10 years ago !! Wtf !
-
I see you can get fire resistant paint for rsj ās at 250 quid for 20 litres !!! Just thinking of a plan B ā¦..
-
Be cool my friend. He's now asking for beam and block 'spec' - little bit late. I'll just forward him the Cemex quote and 'spec'; I'm hoping all this is BS!. When did he last come out?
-
So bco came out today after 6 yrs ( as I was advised then to call them once finished ) I recorded the conversation. oh dear here we go ⦠Bathroom door should open outwards not into the bathroom . Itās in the plans I was told . It isnāt Structural steels need fire proofing . Itās in the plans . It isnāt Failing that suspended tile ceilings need 30 minute fire resistance. Spoke to supplier on this and they canāt give that . Apparently 30 mins is achieved via the frame AND tiles - and in their test conditions . I assume a copy of their fire rating test will be sufficient for bco to go away Wall water membrane system . Want to see design for this . There isnāt one of course as itās diy . Timber frame spec !! ( even though it was up 6 yrs ago ) What annoys me is apparently these things were noted on my file 6 yrs ago but bco never told me until now . Some other ā I must find things ā aswell ⦠I suspect itās a box ticking exercise , but annoys me . At the end I asked him if it should be demolished. My sarcasm was lost on him ā¦.