  1. I’ve not been able to hold off our very patient buyers any longer So we are moving in on Thursday Last time we had all the internals finished and it was the middle of winter Seam to have been more delays with materials this time At least we’ve come in under budget Though twelve months ago that wasn’t looking likely
  2. You need your own His won’t cover you
  3. Absolutely makes no sense Any faults in the plumbing or wiring will be a nightmare to find and it will cost you a fortune doing this Now doing the first fix plumb and elec Then plastering and fitting out a room at a time Will cost a bit more But without the above issues and no issue for BC
  4. 100% ring nails
  5. Much of my business is fireproofing I’m always surprised at how little is done on private houses compared to commercial or even housing associations TF Fire would always be a worry for me if I ever went down the TF route
  6. When measuring for windows and doors I cut a baton to the with and heigh and allow 10 mil Start will the largest opening Most windows are very easy to fit But if you don’t want to self fit Tgen ask a joiner You will get a far better install off a joiner Most window fitters tend to be quick and rough
  7. If they are 22 mil boards and glued The ends don’t need to land on a joist or nog Plenty of glue and ring nails
  8. Exactly They probably think Why’s he dumped all this S**t in our way 😁
  9. I’ve laid both and treating resin like wood is very good advise
  10. Both can look good Porcelain is more durable
  11. If they look different They are
  12. Two different colours Floor should always be done last
  13. Wadsworth and Saxon where the main players in my area They ran quite a few successful schemes No money upfront There only criteria was that you had a full time job and was able to get a mortgage at the end of the project A minimum of 20 hours per week was also pledged
  14. Good post One of the above should have pointed this out
  15. Most treatment plants are much of a muchness As long as there’s no moving parts and an external blower I’ve installed a Matrix TP on our last two builds Super easy to install Even for a novice Just had ours emptied after six years No issues
  16. You will get clay from other digs for nothing Top soil will cost Do all the foundations and drains Preferably all the build Then start building levels up
  17. Solar as energy is great But looks horrible I always find it bazaar that planners allow solar panels But will seam a certain roof covering as not in keeping We where only a local slate But eight PV panels Fortunately Heritage backed us up Carbuncle was the word they used
  18. A tipper trailer is worth its weight in gold Sell it for virtually what you have paid When you’ve done with it
  19. I have a close up of our previous build
  20. I think it comes under Worth a try
  21. It’s an absolute minefield I can charge full vat on part of a site But zero on another part of the same site Though the end user changes has helped Client pays or is except It very easy for a contractor to charge to much or to little
  22. So you would pay him
  23. He doesn’t sound like the sort to have a PYE annual bill of plus 135k
×
×