It would be unusual not to have to do it Depends on the wording of his quote ie Remove and replace tiles Supply and fit I would include self leveling in that
-
Removing cement mortar from brickwork
nod replied to SilverShadow's topic in Bricklaying, Blockwork & Mortar
Your most effective way Not HSE recommended Is to mix the brick acid 3-1 and fill a plant sprayer and target each bit several times Which will slowly break it down PPE Marigolds and goggles that fit right to the face PS Pass this on. To tout rough ass builder š -
First floor, no radiators/larger radiators ???
nod replied to Post and beam's topic in Air Source Heat Pumps (ASHP)
Even the mass produced home builders are only sticking tiny Rads in the bedrooms After never using our first floor Rads on our previous build My wife didnāt want any radiators But I still installed them with one eye on one day selling the house -
Implication of not using MVHR
nod replied to Indy's topic in Mechanical Ventilation with Heat Recovery (MVHR)
It goes show what nonsense the air tests are We scored 2 having no idea of this change They simply put it down as 3 like most of the large scale builds -
Just to add The shaft walling is designed for access from one side only (Lift Shafts ) and will give you 90 minutes exceeding what you are being asked for
-
We have a 11 kw servicing 400 m2 and four bathrooms Itās more than adequate Have you thought of buying a better insulated home
-
Your Architect is correct Clad it with render board Then use a mesh and thin coat render 5-8 mil buildup
-
50 mil MF stud Two layers of Fire chech boards Will give you the hour If they are insisting on more You can install a shaft wall I stud with 22 mil plank fitted between each stud 50 mil void Then cladded with two layers of fire check board This will equal a party wall
-
Seeking advice on selling items left over from house renovation
nod replied to Hendy's topic in Introduce Yourself
You will sell anything on FB market place At the right price šLook for about 20% of what you paid Failing that my choice is a charity shop They will snap your hand off -
-
Radiators needed for ASHP and UFH?
nod replied to YorkieSelfBuild's topic in Air Source Heat Pumps (ASHP)
Get yourself a new installer If heās lying to you this early in the project It doesnāt look good for aftercare -
Overthinking
-
Using existing foundations for a new build
nod replied to allthatpebbledash's topic in Costing & Estimating
Wip them out You could do all the investigations and BC could turn up an say Nah Take them out Or ask for a SE report Who will probably advise the same thing -
Perfect
-
400 or 600 12.5 boards on 400 If you use 600 centers you canāt use 12.5 boards Only 15 mil
-
Plasterboard
-
Options for building extension on existing outbuilding foundation?
nod replied to dwtowner's topic in Foundations
Itās much easier and safer to put new foundations in I canāt imagine a Structual engineer putting his or her name to this They normally play it safe In any case BC may come along and simply tell you to dig them out -
It will all be nice and flat when 20 ton of screed lands on it
-
Thereās nothing wrong with buying them in yourself But if the builder buys them in He will add 20% to the cost
-
Hit a nerve šš