September 2Sep 2 Last structural engineer made no reference to wind posts, but the new SE I employed to come up with a lintel schedule, says that I need them. Thrown a complete spanner in the works as these were never designed in and I have no idea how you go about fitting them to the slab? Brickies are on site and building up to DPC, do they have to be bolted to the slab?
September 2Sep 2 My designer originally proposed them. I took one look at the detail, which added complications to the founds for the wind posts to bolt onto. And then appeared to compromise the insulation by having a steel goal post built into several of the timber frame sections. I asked for a re think and he came back instead with a standard timber frame, but modified to have two layers of OSB with staggered joints to give the required racking strength instead (normally only 1 layer used)
September 2Sep 2 pretty sure my post was dropped onto threaded bar on a pad extending from the founds, or at the very least you could just resin bolt them in. Ive had a look and have no photos of it going in, the builders just did it all. You'll have to go back to your SE surely to see how thats meant to go in, as mine was drawn in by them. It is a thermal bridge as its in the cavity and into the inside but its insulated behind it obviously and a strip of aerogel over it on the inside and the thermal camera doesnt pick it up now its all boarded.
September 2Sep 2 Author So basically, I am completely screwed. The original SE made no mention of them. Building Control haven't made any comment on the submitted structural calcs and now I am near DPC and don't see how they can possibly be added at such a late date.
September 2Sep 2 So what drawings are you working to? What did the original SE specify to give adequate racking strength? Why has the new SE changed that? Surely he will have provided proper drawings?
September 2Sep 2 Author Just now, ProDave said: So what drawings are you working to? What did the original SE specify to give adequate racking strength? Why has the new SE changed that? Surely he will have provided proper drawings? So I am working to the drawings that were submitted to BC. To cut a long story short, I used Barrat Associates originally to do the SE calcs for the building regs submission. 3 months ago I got in touch with a local SE to do the design for the staircase and a bit later on, I asked her if she could do a full lintel schdule for me as the previous SE only detailed the large lintels. It was whilst she was doing this that she commented on the drawings not having any details regarding expansion joints. As a result I thought it would be a good idea to get her to have a detailed look at the drawings and see what else had not been specified/missed ...
September 2Sep 2 Author 19 minutes ago, ProDave said: So go back to SE2 and say you don't want wind posts, ask for her alternative? That is what I am pushing for. When she did the spec for the concrete slab, she specified 150mm slab laid on 50mm concrete blinding with two layers of A252 mesh. Given the ground here is no clay, very flinty soil and then chalk at 1200mm it was massively over engineered. Especially, considering it was a domestic slab.
September 2Sep 2 Wind posts have large overturning forces so there is a big footing too. So it's too late for that. Alternatives are racking panels as @ProDave suggests, and the cost and inconvenience are low. Or a structural goalpost utilising the existing structure. Can't comment on why one SE thinks it necessary and another doesn't.
September 2Sep 2 Do you have any details? Are they required to prevent racking of the structure or to reduce wind loads on brickwork, glazing etc.
September 2Sep 2 Author 9 minutes ago, markc said: Do you have any details? Are they required to prevent racking of the structure or to reduce wind loads on brickwork, glazing etc. Wind loading on the brickwork. Just been speaking with the bricklayer and unless the wind posts can be bolted to the slab, I'll be getting a breaker in to break the blocks/lean cavity fill back to the foundations 😞
September 2Sep 2 There is sometimes quite a lead time on wind posts. How many have been specified? Somewhere along the line you will need structural drawings and calcs that comply with part A. You can normally bolt the windposts to the slab or concrete them in. They add a surprising amount of strength and stiffness to a wall. The alternative could be some brick reinforcing - like train track in the mortar beds - but I don't know if it will work for your design. Edited September 2Sep 2 by Mr Punter
September 2Sep 2 Author 17 minutes ago, Mr Punter said: There is sometimes quite a lead time on wind posts. How many have been specified? Somewhere along the line you will need structural drawings and calcs that comply with part A. You can normally bolt the windposts to the slab or concrete them in. They add a surprising amount of strength and stiffness to a wall. The alternative could be some brick reinforcing - like train track in the mortar beds - but I don't know if it will work for your design. I am still waiting for the SE to give me the details. The bricklayers have said that it's no issue as they can start the build up elsewhere and come back to that section once it's finalised. It's frustrating that the original SE completely failed to spec them and the new SE specs them right at the last minute.
September 2Sep 2 3 hours ago, flanagaj said: It's frustrating that the original SE completely failed to spec them and the new SE specs them right at the last minute. What is it that makes you believe the second SE rather than the first SE.
September 2Sep 2 Author 5 hours ago, Gone West said: What is it that makes you believe the second SE rather than the first SE. Good question. I have contacted the first SE to ask the question.
September 3Sep 3 20 hours ago, flanagaj said: That is what I am pushing for. When she did the spec for the concrete slab, she specified 150mm slab laid on 50mm concrete blinding with two layers of A252 mesh. Given the ground here is no clay, very flinty soil and then chalk at 1200mm it was massively over engineered. Especially, considering it was a domestic slab. Alarm bells only ringing for me here? Sounds like a bit of ass covering via over-engineering, at your cost and inconvenience. Last slab I saw at that spec was for a 1.5 storey house…….only 50mm thicker. Bonkers for a garage imho, but I see this quite often; I always challenge, and then sense seems to be introduced and the solution dialled down. 🤷♂️. Stick with SE1, and simply ask for their spec etc. Personally I wouldn’t be mentioning wind posts to SE1, and instead leave them underwrite an alternative solution from scratch.
September 3Sep 3 1 hour ago, Nickfromwales said: ass covering via over-engineering, I don't think we are in any position to say that. More likely is that it is a result of switching Engineers. The continuity of logic may be broken and the reasonable assumptions of one, not picked up by the other. Going back to the first one could now be awkward... what if it becomes a dispute? I might be uncomfortable and be "too busy".
September 3Sep 3 Author 3 hours ago, Nickfromwales said: Alarm bells only ringing for me here? Sounds like a bit of ass covering via over-engineering, at your cost and inconvenience. Last slab I saw at that spec was for a 1.5 storey house…….only 50mm thicker. Bonkers for a garage imho, but I see this quite often; I always challenge, and then sense seems to be introduced and the solution dialled down. 🤷♂️. Stick with SE1, and simply ask for their spec etc. Personally I wouldn’t be mentioning wind posts to SE1, and instead leave them underwrite an alternative solution from scratch. Some good points there Nick. SE2 has zero interest that I’ll have to get a breaker out to break up the blockwork and cavity fill to install the wind posts.
September 3Sep 3 Author Given SE1 didn’t specify them, then surely the house should be built according to their calcs. If a problem manifests down the line, then they are ultimately responsible?
September 3Sep 3 3 hours ago, Nickfromwales said: Bonkers for a garage imho, but I see this quite often; I always challenge, and then sense seems to be introduced and the solution dialled down. 🤷♂️. Might not be bonkers for a workshop though, which is what I thought @flanagaj wants to use his garage for, especially if the use of the workshop isn't specified.
September 3Sep 3 51 minutes ago, -rick- said: Might not be bonkers for a workshop though, which is what I thought @flanagaj wants to use his garage for, especially if the use of the workshop isn't specified. Eh? Vs dynamic loading of vehicular traffic. An SE would have asked what items / weight / footprint / means of mechanical fixing or freestanding, and more, to consider that an issue.
September 3Sep 3 On 02/09/2026 at 10:58, flanagaj said: 150mm slab laid on 50mm concrete blinding with two layers of A252 mesh. Yes that's way ott for a house. That's a commercial floor spec. Having reread I agree in principle you work to SE1. But why did you engage a different one?
September 3Sep 3 46 minutes ago, Nickfromwales said: Eh? Vs dynamic loading of vehicular traffic. Not just dynamic loading but also vibration mitigation. 46 minutes ago, Nickfromwales said: An SE would have asked what items / weight / footprint / means of mechanical fixing or freestanding, and more, to consider that an issue. Should do, based on information we have we don't know if that happened.
September 3Sep 3 Is this some unusual design? I've never put windposts in anything I've built but then my stuff has always been pretty vanilla. I usually have lintel manufacturer spec lintels. Its FOC. Do you need an engineer to go through every element nowadays for BC or can the architect just use robust details or whatever the standard rules are.