Jump to content

Pocster

Members
  • Posts

    14150
  • Joined

  • Last visited

  • Days Won

    29

Everything posted by Pocster

  1. FAO Admin Photo uiploads seem to be fecked. Either not displaying or only partially.
  2. Yes . It’s ‘ checking ‘ the grid is there and adjusts to suit ; perfectly normal .
  3. ?? . You mean sexy nympho girlies in uniforms ?
  4. I’m going to fix this next spring - honest ! Going to dig a trench along the lane ( where I believe the waters getting in ) . Cement any gaps - then see . I’m only a few years late on dealing with this .
  5. Update. Still leaks in the same place 🤣
  6. I’m a bit scared to test it though !!! 🤣
  7. Actually the Tesla app now has a ‘ go off grid ‘ option to simulate that . Might try it tomorrow when SWMBO isn’t in https://www.tesla.com/en_gb/support/energy/powerwall/mobile-app/go-off-grid
  8. My hands up of course ! PW with gateway 2 ; should allow off grid . SE doesn’t support it in the U.K. - not sure what that does if the grid disappears….
  9. Yes yes yes . I was just trying to imply people will charge everything they can before an outage . Which in turn increases demand which then causes an outage .
  10. My suspicion with the supposed power cuts is won’t some families simply cook earlier to avoid them ? . Charge the phone etc / EV earlier . Effectively cause a demand spike before the outage .
  11. I’m ok with 23kWh of storage - but thanks for asking .
  12. @joe90 here you go
  13. Tomorrow when I can walk
  14. Music to my ears !
  15. F off email gets me a phone call Door stops ( jambs ? ) missing Might be able to flip / rotate ( wft ) door . Already indicated even if it work I want compensation. wine time now !
  16. IMHO there should be 3 continual lengths around the inner frame yes? ( where those stupid bits are ) One of the doors is effectively upside down ( may be possible to remove the head timber and spin it 180 ). But ; not what I would expect . Company have been sent appropriate email. I kicked BT's ass this week so I'm on a roll!
  17. Yeah websites duff . Tried again now it doesn’t display at all
  18. Well that’s the confusion . Either side you wouldn’t want just 3 ‘bits’ . The otherside is nothing ; flush with hinges . I unscrewed one of those bits expecting it to fall out - it didn’t . It won’t move no other supplied timber apart from architrave .
  19. Hmmmm These 2 short bits of vertical timber ( 3rd one at the base ) . I thought they were for transportation- but they are the door jamb ???? 🙄🙄🙄🙄 Rather than 1 nice continual length ??? or have I got this wrong ?
  20. I've been saying that for years and years - though I say it when I get to the 10th time also.....
  21. Some walk on glazing arrived yesterday..... I haven't been brave enough to unpack that yet.....
  22. Ordered 2 doors 7 weeks ago ( pre hung ). One hinged on the left (so push on the right from inside ) the other the opposite way round. Both turned up today ; but both hinged on the left!! Checked my order ( assumption is I am wrong ). I AM CORRECT!!! Everyone f's up at some point.
  23. I put washer pipe outlet hose bits through - to act as a sleeve on the Hep2o and stop it rubbing against timber / concrete
  24. Hmmmmmm . Practice makes perfect
×
×
  • Create New...