Yeah, this client is not domestic but energy infrastructure. It’s not a case of want, more need. And the need is ours and their desire to make money.
-
@JohnMo I’m not sure you’re entirely correct on this point. The uk manufacturing process has been improved across the board and the average improvement is a 29% reduction in embodied carbon as an average in the placed product UK wide. You’re right, not everyone uses the best, lowest carbon products, but some do, the project I am on now has used 3500m3+ of concrete. Wherever possible we have used GBBA cement replacement at the maximum potential (it’s actually cheaper and your concrete supplier will give you a mix design with this in as standard unless you ask for 100% OPC which most people don’t actually want because is has a short workability period and unless places and protected properly is prone to cracking) . Wherever possible we also used recycled aggregate and placed 16000m3 of crushed concrete in lieu of virgin crushed rocks. And this is not a government contract. This in part because many institutional clients WANT do to the right thing. They sign up to optional scheme like BREEAM which push sustainability above and beyond the mandated standards. It’s much akin to the much maligned Euro Rules many justified brexit on, not realising we as a country went above and beyond, often by choice. You might not realise it but it’s happening right in front of our eyes. Because… the system of taxation… incentivisation… works! Another example of this is EV. Uptake wouldn’t be so high if the sales hadn’t been subsidised in the way they were. And subsequently if infrastructure requirements hadn’t been pushed through the various routes (subsidisation, investment, planning etc) but for the most part I think we can again agree that the trajectory is by and large “in the right direction”. And yes, big compromises will be made to “finish the job” but as ever you have to consider the pareto principle (80/20) rule. The premise of which is that inferred in this situation 80% of the gains will come from 20% of the effort. I think we’re still that 20% phase and importantly this trajectory is a 25 year plan and by that standard, the next 5 years will see the most gains with the least sacrifice. What happens next is anyone’s guess…
-
Timber or timber effect soffit material
BadgerBodger replied to Spinny's topic in General Self Build & DIY Discussion
I’m not sure I’ve ever seen oak oudoors, not silver unless regularly treated. Lame goes for larch. And bothe look pretty similar in the end. As a soffit it might well be that as it’s not exposed to uv or weather, it may last a good while. I fitted this (not in wood finish) and the colour 5 years later is still good a strong when exposed to full daylight on a facade… pretty much 0 maintenance. https://www.trespa.com/en_GB/products/wood-decors -
Surface water flow attenuation problem.
BadgerBodger replied to G and J's topic in Rainwater, Guttering & SuDS
Have you looked at a shallow crate system which could then have a hydrobrake on the exiting MH? -
Agreed. Compromises will be required. But incremental improvements combined with small changes in lifestyle/approach can make a huge difference. Sometimes there is very little compromise for the end user though, just look at concrete, still a major source of carbon emissions the production of cement has been improved so as to reduce carbon emissions by roughly 50% and development in concrete design by use of cement replacements such as GGBS mean that overall embodied carbon is reduced by nearly 30%. This is an averaged number and can be further reduced by use of recycled aggregates and increased GGBS in some applications. Proof that legislation, taxation and incentivisation works. This kind of approach cascades into developing worlds (eventually) through the realisation that it can and does save money in the long term.
-
This. Leading by example is the only way. If everyone takes the approach that “it’s not my problem”, no-one does anything. Everyone does their own bit. Like you say, the “20 billion” is small fry, and I don’t know the exact numbers but some if not all will be covered by the various “carbon” taxes.
-
Yes. They do. But most don’t have off street parking which, unless you are willing to put up with the inconvenience of have to go and sit somewhere to charge or they have charging everywhere you park (work, shop, etc) an EV is no good. Where I currently live it’s virtually all terraced housing (Leeds) in the main city…
-
Interesting topic. My two cents for what they’re worth. like others have said EV works for city dwellers. But not for most as they’re both too expensive AND impractical for anyone without a private driveway (currently, but likely not forever). EV models are marketed at that size and affordability range upwards. side note… as much a I hate all these e-bike everywhere they do seem to potentially be a part of the solution ICE for me is providing best value for money based on a 5 year usage cycle when considering purchase price, maintenance cost, fuel and resale value (so long as I only buy - nearly new). That IS changing and the tipping point is getting closer to viability on a cost basis BUT as a family we would not be able to have two given the current mileages capacity. I see electric cars as the Betamax. Something else will likely be VHS maybe a hydrogen fuel solution or maybe something we simply haven’t thought about/isn’t yet practical. re carbon capture. I have mixed feelings about this. I’m a strong believer in forward motion and this is an important step for lack of a better solution. The concept of carbon credits is forcing companies to start thinking about their own solutions (to carbon emissions) which should stimulate creativity. In this case maybe we need to rethink the problem as having another dynamic - tax. If you consider the impact of the laffer curve on business in combination of incentive effects the policy make more sense, hopefully stimulating yet more innovation and development I think carbon capture is a step in the right direction and the development of efficiencies in the technology is right BUT that solution for sequestration could be a misstep, or at least, only a small part in the long term solution (which in all likelihood will land on - plant more forests!!! - a topic for another time perhaps…) coming back to carbon capture, it’s not all about sequestration but some is actually re-used for manufacturing amongst other things. The reality is we, have to think more about what we are doing with our waste, because in my view, that’s what this is, a waste problem, which is solved by a multitude of factors but started by attacking the biggest generators which are energy production (in its various forms and usages), and quite literal waste. As usual the hierarchy of control should be eliminate, reduce, re-use, recycle, dispose (responsibly). EV is quite high in the hierarchy with it reducing emissions carbon capture sits lower on on the re-use/recycle/dispose levels but when you consider that with current processes carbon must be generated, carbon capture is the next most responsible thing to do. ultimately both are steps forward and forward motion is forward motion which is better than stasis or regression.
-
Corrugated roof material - recommendations?
BadgerBodger replied to Great_scot_selfbuild's topic in Roofing, Tiling & Slating
Tried searching for sinusoidal cladding? There are plenty of options. -
Rebar suppliers that can do 90mm h10 links?
BadgerBodger replied to WannabeBob's topic in General Structural Issues
Good question. And there is a lot to talk about here… I’ll keep it quick though. Ask for the suppliers CARES certificate. If it covers the relevant classes you’re looking for you’re good. I’m over generalising but for domestic work I wouldn’t dig much further than that. It’s a rabbit hole. On the bending sizes and radii, factory bent will give you the most options. On site you don’t really want to be making up complex bar bends! -
Rebar suppliers that can do 90mm h10 links?
BadgerBodger replied to WannabeBob's topic in General Structural Issues
Bending is easy enough with a bar bender but by the time you’ve hired one and bought the bar you’re probably better paying the 20% premium on the few you want…. I’m not sure you’d get a bar bender to manage bends in that short succession though. -
Soil pipe penetrations through slab - which way up?
BadgerBodger replied to Dunc's topic in Foundations
Agreed. Not often you actually see the double tape and top hats being used! -
Soil pipe penetrations through slab - which way up?
BadgerBodger replied to Dunc's topic in Foundations
It’s common to see pretty much all arrangements. If you’re using clay or cast pipe you don’t generally get female/male ends, only straight union couplers. It works fine. Same goes for twin wall. I like it when the builder leaves a coupler as you see there with a blanking plate left flush with the slab surface. Nigh guarantees you won’t damage the pipe through construction. -
Explain to me like I’m five years old…
BadgerBodger replied to BadgerBodger's topic in Heat Insulation
Interesting. So considering that there will be a service void on the inside face and a cavity on the outside, this will be of some benefit? -
Explain to me like I’m five years old…
BadgerBodger replied to BadgerBodger's topic in Heat Insulation
This is exactly what I’m doing. There is some Hardcore in there which needs knocking about once the foundation modifications are complete and then compacting. Sand blinding followed by EPS 100. Cheap and cheerful. I’m going under rafter only. Only need to tape to purlins. BUT also using a full VCL membrane the warm side before batten for service void and board. Debating whether to use reflective membrane or not. I think no need considering foil face on the PIR -
Explain to me like I’m five years old…
BadgerBodger replied to BadgerBodger's topic in Heat Insulation
And thanks all for the input. -
Explain to me like I’m five years old…
BadgerBodger replied to BadgerBodger's topic in Heat Insulation
I have to build up the levels to achieve the floor level and I’m using UFH. Figured we could use cheap EPS to hit two birds with one stone. Labour cost is the same. Small uplift in material cost for EPS/stone. I’m also limited to the amount of weight I can add to the existing roof. Maybe I will get 160mm but that will be the limit. It will be PIR in the roof build-up. Celotex advise resultant u-value with 150mm will be 0.13. The installation risk of fitting between irregular timber is why I have chosen to go under rafter only as opposed to between and under. Ok. So. I continue with my quest. I’m well aware of the Grenfell issues and the associated risks. I’ve been working with the various insulation materials for the last 17 years and in my view PIR always results in the technically most effective solution (not withstanding installation issues). As I’m going to be the installer for the main build and the builder is only doing the extension where it is a full fill cavity wall, I’m happy. As I saw someone else write on a thread recently. I always have the builder lay 6 course of block, flush up the cavity side and then point the internal face. Install insulation once the block has gone off, tape the joints, then face up. When coursing above the insulation, cover with a piece of timber or hessian, then brush off before more insulation. -
why there is such a strong aversion to PIR on this forum. In context. For my barn conversion I’m looking at the following. 300mm EPS below slab external walls to be panelised stud liner system installed in steel frame with breather membrane to outside 120mm PIR between studs and 50mm to face with VCL and service void to face before PB roof will be breather above rafter, 150mm insulation below with VCL and service void to face before PB Additional perspective is that the architect proposed a hygroscopic solution but in my view this was not cost effective (surface area is huge and additional load to roof would have been problematic) and did not resolve the cold bridging issues I have with the steel frame being used to brace the external walls.
-
Also curious. Our conservation officer was encouraging me to go down this route but we ended up just going for double. I really wanted triple glazing but it was a hard no from his standpoint.
-
I’m not in a conservation area but my project is grade 2 listed. I’ve just had solar and ASHP approved. In my case they were really not keen on seeing it on the main build but accepted it on the extension. Every area has a different standard and I’d go as far as saying it depends upon the approach of the conservation officer. IMHO, the most expeditions route to finding the answer will be to make contact directly or find a good architect who has an existing relationship with them. I did both, my architect put the concept out there to test the water, I spoke about the finer detail and where the boundaries lay, we ended up with a submission that was passed fist time, as were the closure of the conditions. As others say, you have to get listed building consent and planning. Although, I haven’t quite figured either the removal of permitted development is solely to push you to the consent or whether the requirement for both is absolute.
-
For most, if you’re clean shaven or even if you're not but your chosen style sits entirely within the skin to mask contact area without fouling the seal you’d pass a face fit test. If you were doing a face fit test you’d likely find that different disposable masks have vastly different fits and qualities which would result in a pass/fail which changes for individuals based on their face shape etc. My experience is that a rubber half mask see far fewer failures in testing and in practice is easier to use, getting a good seal. I really like the force 8 press to check system as it’s great for checking each time you put it on that you’ve got a good seal. Essentially you squeeze/close the filters and breath in to check if a vacuum is created, any air sucking in around the nose or chin means you can adjust the mask position, tightness etc. and then recheck. When I was doing fit testing I never had one fail after showing the user how to fit and put it on correctly. If you’re working in a really dusty environment another indicator is after use, if you have any specific lines of grime within the mask area, it’s not working properly. Next step up is forced air. On site we never really use them unless we’re looking at someone who can’t shave or we’re starting to look at confined spaces which is a whole different ball game. Ultimately you have to ask, is this a token gesture or do you want it to actually work. If the latter get a rubber half mask and if possible, find some way of checking the fit or a the very least, be observant.
-
On big industrial jobs you see the serrated knife below, think how much insulation is used for a boiler used to generate steam for power generation… for H&S reasons as managers were never so keen but they work. At home an old bread knife usually comes out…
-
Looks like a job for tanking… although… even with the sketch I’m a little confused. It would be helpful if you could show the brickwork. If it’s a cavity wall, do you have a cavity tray or just a DPC on both leaves? FYI look on NHBC website info is your friend for simple details and general “good” practice. In your scenario it just looks like the DPM that would normally form your internal DPC and dress down under the slab will be partially exposed. In itself I wouldn’t say this is a major issue but it IS more likely to accidentally be punctured torn or otherwise breached in its exposed position. certainly not best practice.
- 7 replies
-
- foundations
- foundation
-
(and 2 more)
Tagged with:
-
Best products / manufacturers for 110mm & 50mm pipe?
BadgerBodger replied to Alan Ambrose's topic in Waste & Sewerage
In fairness I’m inclined to agree with you on the 100mm stuff. It’s heavy and cumbersome but solid. It’s the larger bore stuff I have had a lot of issues with damages. -
Cost effective permeable sub-base for resin bound gravel
BadgerBodger replied to bmj1's topic in Driveways
I’ve never had it done domestically. I’ve used it and seen it used commercially as part of SUDS and MUGAs so that would always be by a local tarmaccer. I’d be surprised if your resin drive people couldn’t organise it. If not reach out to some local driveway companies who offer tarmac options? See if they do it. Get some quotes.