  1. Just don't over think it. Just do costings of a hybrid system and a separate component systems. Base it on 6 years of life. Things will have changed by then.
  2. Interesting question. Basically, you cannot just pump energy into a battery, even at the correct levels i.e. volts and amps, though should really be talking about coulombs. When batteries are charged, and discharged, there is an optimal temperature range the ensure a reasonable charge/discharge rate. Keeping within the correct range will give maximum longevity. As battery chemistries vary, even within a similar group i.e. lithium, lead, sodium, different charging and discharging regimes are needed. This is usually taken care of by a battery management system (BMS) which may be a dedicated unit for a particulate battery chemistry, or programmable for different chemistries. They can often sense battery state of charge (SoC), temperature and individual cell conditions. But not all will. BMS are often built into the battery packs. Now an inverter is, in basic form, a controller that can take in a 'wild' voltage and amperage, process it to output a very controlled alternating current i.e. 230V at 50 Hz as a true sine wave. Then it gets complicated. Safety features are added on i.e. grid impedance for automatic disconnection, voltage regulation for local standards i.e. 230V -6% +10%, power limiting i.e. 16 A per phase, frequency matching to stop poor power factors and unwanted harmonic, maximum power point monitoring (MPP) which is an interface between the inverter input and the load that it is supplying, there is often a minimum load that an inverter will supply i.e. 200W. So even before one starts thinking about charging batteries, an inverter is doing a lot of work. Chemical batteries do not like to be worked too hard, especially when charging. You can think of a discharged battery as an empty carpark. Initially it is easy and quick to park a car (high voltage and current) as it gets fuller, finding a free parking spot is harder, especially if the cars are not slowing down (electrons move at close to light speed in a pure vacuum, bit slower in copper wires). What the BMS does is control the rate that the electrons can enter the battery. This is part of the reason why batteries are often charged between 20% to 80%, it is faster and preserves the battery's chemistry. Expecting a single inverter to do all the above i.e. legal requirements (grid disconnect), power management, variable load delivery and battery management is a big ask, especially for under £1000. So does it matter, yes, is it best to buy into one system, for reliability, probably yes. Is there an alternative, yes, but takes a lot of homework and fiddling. The way around this is by having an inverter and BMS that plays it a bit safe, so not the fasted charging or discharging, may compromise the overall efficiency, and can reduce the effective life of the batteries. It is a bit of a minefield really, but clever engineers do their best to get the optimal systems all working together, at an acceptable cost. So either don't overthink it, or overthink it too much.
  3. Just been catching up on posts, and it has struck me that choices are becoming overcomplicated by things that may not really matter. By this, what I am talking about is basic systems i.e. home automation, heating systems, plumbing, security, entertainment etc that get sold on the technology and communication abilities, rather than the functionality. A few very technically minded people have bought into quite interesting control systems, then ripped the controls out, and replaced them with something very basic, but functional. Discus?
  4. Not by much though. Most people will learn how to shower with a 2.5 lt/min flow.
  5. So true, in many areas. When I was a lad, we had fitters/machinists, they learnt on the job and basically needed retraining when a new part needed fitting or machining. Then we had the Technicians/Toolmakers, they had gone to college to do a G&G or BTEC and could understand drawings and written instructions, so set up the machines. Then we had the Production Engineers. Minimum qualification (where I worked) was an HND in the appropriate engineering discipline. They understood the jobs and the machinery that it was made on, and importantly, what the part did in the final product. They seemed to spend a lot of time in meeting, but everything fitted together and worked reliably. The main person, on the production side, was the Chief Engineer, they were responsible to all the costs, timings, quality control etc, they had an Engineering Degree or MSc, a couple had PhDs. By the time the 1990s came along, that structure seemed to have vanished and at best, in smaller companies, you got a Technician i.e. had a C&G or BTEC/NVQ. I generally found they disliked anyone with higher qualifications. A friend of mine, a very experienced and qualified Chartered Mechanical Engineer, worked for a company that was run by an Accountant (a qualified one), was asked to cut costs by getting rid of the Engineers and employing unqualified replacements and training them up. That company made fuel metering systems, so safety critical in some applications. Thankfully the company folded before any damage was done.
  6. What does that even mean? Falls into the category of eco or green to my mind.
  7. Interesting series about it this week on R4.
  8. Just knocked up a quick spreadsheet. I assumed the insulation has a k-Value of 0.03 W.m-1.K-1, is 0.1m thick, all surfaces covered, ground temperature is 8°C and airf temperature is 7°C, then the total losses, if heated for 24 hours, will be 3 kWh/day. Air changes an hour are 2. If you have a time of usage electricity tariff i.e. E7, pop a second hand storage heater in, a 10 kWh one (1.5 kW input, 0.6 kW output).
  9. Welcome @Alice67 Are there any particular things you want to learn about. The main thing I have learnt on here is that too many people start with the inside of the building, then wonder why they cannot get the building to actually fit properly.
  10. If you change the air every half hour, that is about 30 kg/hour. A kg of air takes 1 kJ/kg.K to heat. So taking a really cold day, with a 30K temp difference, that would be 1MJ of energy. 0.3 kWh, or 10p. There will be losses through the fabric, but I cannot work them out at the moment as too tired. Maybe when I get home.
  11. I lived in one during the winter of 82/83, never thought it was particularly cold. I suspect that even basic ones are now better insulated than new ones from 40 years ago. As I said earlier, get an A2AHP fitted and an induction hob that way no need for gas.
  12. I believe you can do this. It is the overall losses that really matter. I am not sure if there is a minimum you cannot go below, I think it is in the building regs. Forget products like vacuum panels, aerogel and multifoils, they will fail, not be as good as stated, or just useless. Tiny air bubbles trapped in a thermally low conducting material is the way to go.
  13. I try very hard to reduce bandwidth and the associated energy usage. We are heading to a 5G world now, 6, 7 and 8G will be along soon. Why bother with old hardwired hardware.
  14. Then you should have typed is as 0.27, 0.26, 0.25
  15. That is true for all materials, just how nature works. You really need to decide how willing you are to pay for future heating in the knowledge that a fraction of it is lost. You only fit floor insulation once, thermal losses are constant.
  16. Pop into B&Q with a tenner and get a cable tester. Useful thing to have anyway. https://www.diy.com/departments/live-ac-voltage-detector-tester-pen-led-torch-non-contact-detect-cable-wire-mains/5055538125065_BQ.prd
  17. If you are going to the trouble of coating it, then use an epoxy resin. May cost more but it will last as long as the floor. Alternatively, how about a posh 'vinyl', they don't have to look like the 1980s (though I looked better back then).
  18. Realistically you will need to use PIR. You can easily look up the thermal conductivity if the difference materials, the you can convert them to R-Values (thickness divided by k-Value). Add all the R-Values up, and divide that number into 1 to get your U-Value. Avoid sprayed insulation, lenders are refusing to give mortgages on it, regardless of how good or bad it is.
  19. If SIP exhibitors have some panels on show, have a look at how flat the faces are. Last time I saw some at a show, they were as wavey as (expletive deleted).
  20. Why not a cheap A2AHP, get cooling that way. Well worth insulating under the floor. Down here, for 10k, you can get one on a site.
  21. Right Here are the more interesting charts, Decrement Decay, Frequency that they occur, grouped monthly. As I suspected, the large variations are at the extremes, so don't really matter that much. Where there are large variations in the middle of the distribution, the decrement decay is still quite large i.e. April taking 15 hours to drop 1K when the mean IAT is 19.1°C. It is also worth remembering that my house is small, terraced and timber framed. So not an ideal form thermally (it is basically a corridor), and it has disproportionally high window area, at each end. I also have E7 storage heaters (modified to be only on for up to 4 hours), so a maximum of 16.8 kWh.day-1, but usually half that. I am not really sure if it is worth looking at hourly data (these charts are based on 6 hourly means so I could split them into heating input times and daylight times, but then when, on average, the decay is several hours, not really important for 1K temperature difference. My internal temperatures are stable enough, and since the latest improvement (fixed the draughty door and added secondary glazing onto the double glazing), I seem to be using less energy anyway (may have a look as it is only a matter of comparing charts, but tonight).
  22. Right Knocked up the basic data, grouped it by ΔT to show the hours it takes to change by 1K. I have created 4 charts to split the year up, generally the April, May, June, July, August and September have no heating on. Usually I turn the heating on some time in November and it goes off sometime in March. The data spans the years 2019 up to 2025, so 6 years. I will create some charts that show the frequency of the ΔTs, but they will almost certainly be monthly or they will be very busy (LibreOffice Calc is not as fast for chart making as MSO Excel). Note that the y-axis scale changes wildly. Generally, as expected, the greater the ΔT, the faster the temperature changes. I suspect that the anomalies are when the heating is turned on and off, which in itself is useful to know.
  23. I am looking at that now. That as well. Why, it is basic mathematics, statistics and easy physics. He is right.
  24. Have just done a very basic calculation on my place, without filtering for inputs. Heating, on average, takes 15.6 hours per sustained degree increase, cooling, as expected, takes longer at 19.6 hours per degree. That is based on 6 years data.
×
×