A Winter of Peckering
Our site slopes, so we had the idea of digging into the slope and creating a walk in basement. Having done two trial pits into nice soil and clay during the initial design phase, we were confident that it was a simple soil dig out sort of thing! Once the bungalow was demolished it became clear we’d quite by chance dig into the only two areas of soil and clay and the house had been constructed on a large lump of limestone rock called Cumbria. After a hit of head scratching and a coffee with my neighbour Brian, he’s the ‘go to guy’ if you have a problem, as he’s usually got a solution and the solution was a local guy called Chris, a man with a machine and a pecker.
Chris arrived on 1st November and twelve weeks and an estimated 1,200 tonnes of rock later we had a basement.
Here he is starting clearing the site.
The basement hole starts to take shape.
This is about half of the stone removed from the basement hole.
- 3
15 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now