Who enforces location of soakaways?


Ferdinand

Recommended Posts

A quick one.

 

A new Planning Permission has been passed which includes a soakaway for onsite surface water disposal.

 

Which body is responsible for enforcing the location of the soakaway being a sufficient distance from the boundary, and also the new building, in accordance with Council Policy?

 

Is this Planning or Building Control?

 

Cheers

 

Ferdinand

 

Link to comment
Share on other sites

When I built the garage first, the BC officer told me I needed a soakaway, I pointed out the solid yellow clay that existed just under the topsoil and told him there is no way it would work. I connected my French drain to a pipe out to a ditch in the road and he signed it off without question. I am hoping he does the same with the house as I did the same there. ?

Link to comment
Share on other sites

22 minutes ago, joe90 said:

the BC officer told me I needed a soakaway, I pointed out the solid yellow clay that existed just under the topsoil and told him there is no way it would work. I connected my French drain to a pipe out to a ditch in the road and he signed it off without question. I am hoping he does the same with the house as I did the same there. 

Exactly our experiance as well.

Link to comment
Share on other sites

It’s up to you really. But if the BCare  not happy they will be a pain. Normally it will be a planning condition that all SW will go to soakaway . As a developer you wound have to overcome the issue. As a self builder I have never seen a building go up and then not be allowed to connect to a drain. In my case I had similar clay, and built a soak away in any case. I only put one connection into it from half the main roof. The rest I piped into the existing combined drain. The soakaway has not caused any issue though. When in clay it is best to have a long narrow  trench  soakaway which may span over cracks in the clay etc and allow water to “soak away” even though the clay is pretty iimpermeable.

  • Like 1
Link to comment
Share on other sites

Thanks.

 

This was the one that I objected to then had the thread hidden a few months ago, and now has conditional PP for a smaller development.

 

They came back and have resolved most of the issues after they lost the PP then the Appeal following my representations and the Council's view, including reducing from 2.5 to 1.5 storeys (33->26 ft) at the apex of the roof, 4 beds to 3 beds which reduced parking and amenity space requirements and made the PP implementable, and sorting out the parking mess they proposed. Not ideal or what they promised when they sold me my property, but acceptable in the circumstances.

 

It is still proposed to build over half of where my 2.5m wide currently unoccupied Easement runs, but the is non planning and the carrot is to negotiate that away in return for them pre-installing ducts for me, whilst the stick is a threat to install them myself across the full 2.5m width and potentially injuncting which will prevent the building of half of the 2 semis.

 

Time to have a conversation toe-to-toe and try to come to a win-win agreement.

 

Ferdinand

 

Edited by Ferdinand
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...