Kelvin Posted July 27, 2021 Author Share Posted July 27, 2021 30 minutes ago, SteamyTea said: Some people have found that there is no wayleave agreement when cables cross their land, then use that as a bargaining point. Also try to design out the need for such a large load, PV and battery/thermal storage can reduce the peak power considerably. This is a good point and read the long running thread about that last night. Thanks. Link to comment Share on other sites More sharing options...
SteamyTea Posted July 27, 2021 Share Posted July 27, 2021 4 minutes ago, Kelvin said: This is a good point and read the long running thread about that last night. Thanks. I just went to sleep, better use of night time. Link to comment Share on other sites More sharing options...
Kelvin Posted July 27, 2021 Author Share Posted July 27, 2021 lol Have any of you got experience of these guys. I just spoke to one of the their agents who was really helpful. She said when we get to the quote stage if it's still more than I think is reasonable they can help challenge quote if I'm getting nowhere myself. They charge a fee for this. I didn't get into how much that fee was etc. New Electricity Connections - Mains electric for homes & businesses | GEC (gasandelectricityconnections.co.uk) Link to comment Share on other sites More sharing options...
WWilts Posted July 27, 2021 Share Posted July 27, 2021 Initial quote from DNO was around £10k. Called their quote person and had a chat to understand what options might be possible. Then wrote to them saying we were interested in whatever we could get by jointing into the cable(s) at/near the front of our property. Minimising or avoiding the digging up of public footpath, because that seemed to drive costs way up. Eventually quote came down to around £3k including about £1k for jointing on to a relatively new cable that was put in to supply neighbours. We took it. 3 phase too. In our case the softly softly approach worked. But if victory is relatively certain then challenging their quote might work as well or better. 2 Link to comment Share on other sites More sharing options...
Kelvin Posted August 12, 2021 Author Share Posted August 12, 2021 Update New quote is £5600 for 100amp connection and that also includes the cost of upgrading the transformer. So all good. Onto sorting out the borehole now. 2 Link to comment Share on other sites More sharing options...
patp Posted August 12, 2021 Share Posted August 12, 2021 On 27/07/2021 at 12:28, Kelvin said: lol Have any of you got experience of these guys. I just spoke to one of the their agents who was really helpful. She said when we get to the quote stage if it's still more than I think is reasonable they can help challenge quote if I'm getting nowhere myself. They charge a fee for this. I didn't get into how much that fee was etc. New Electricity Connections - Mains electric for homes & businesses | GEC (gasandelectricityconnections.co.uk) I would be interested in any experience too. We had to fight our own corner when dealing with Anglian Water and always wonder if we missed a trick. Link to comment Share on other sites More sharing options...
gc100 Posted August 12, 2021 Share Posted August 12, 2021 2 hours ago, patp said: I would be interested in any experience too. We had to fight our own corner when dealing with Anglian Water and always wonder if we missed a trick. What happened with Anglian water ? Link to comment Share on other sites More sharing options...
patp Posted August 14, 2021 Share Posted August 14, 2021 Long story as short as I can. There turned out to be a 4in water main slap bang under our proposed foundations. Anglian water quoted to move it West by about 8m then back East around the perimeter of the site. £17,000! You do have the right to use other contractors for the bulk of the work. They must be registered on Lloyds List. They have to pay to be on the list. We went out to tender from a few on the list. Most did not even reply. One said, despite being a nationwide organisation, that they "did not cover that area". Found one to quote. His part of the job was about £7K. Went back to AW for them to now quote for the turning it on and off and testing and they quoted £12k. Figures are from memory (!) but you get my drift. When asked to itemise their quote they told us that they did not work like that. It was an estimate and that is all they could provide. I eventually got hold of a manager who told the costings of materials etc was a "commercially sensitive" and not available to the general public. I complained and got nowhere and took them to the Ombudsman in the middle of Covid and got nowhere. It is my opinion that they had an "agreement" with the large contractors to leave their area alone. The small contractor that did quote knew he didn't stand a chance because he had never won a quote. Link to comment Share on other sites More sharing options...
DragsterDriver Posted August 14, 2021 Share Posted August 14, 2021 On 12/08/2021 at 09:30, Kelvin said: Update New quote is £5600 for 100amp connection and that also includes the cost of upgrading the transformer. So all good. Onto sorting out the borehole now. Oh! mine is a replacement dwelling and U.K. power network are saying they have no spare capacity so they’re lubing me up for a transformer... how about reconnect the old cable? ? Link to comment Share on other sites More sharing options...
Kelvin Posted August 14, 2021 Author Share Posted August 14, 2021 21 minutes ago, DragsterDriver said: Oh! mine is a replacement dwelling and U.K. power network are saying they have no spare capacity so they’re lubing me up for a transformer... how about reconnect the old cable? ? It is odd that both quotes include a transformer upgrade and the price difference is so huge. The advice is to question whatever quote you get. 1 Link to comment Share on other sites More sharing options...
DragsterDriver Posted August 14, 2021 Share Posted August 14, 2021 2 minutes ago, Kelvin said: It is odd that both quotes include a transformer upgrade and the price difference is so huge. The advice is to question whatever quote you get. I’ll report back when I get a quote, they could say transformer quick enough though! Link to comment Share on other sites More sharing options...
Guest28 Posted April 12, 2022 Share Posted April 12, 2022 On 26/07/2021 at 12:51, Thedreamer said: This is a well covered topic on the forum, worth doing a search for previous posts. My advice is never accept the first quote. We had all sort of wild numbers chucked at us from SSE for a road crossing and 220 meters of cable. If it's helpful about 5-6 years ago I spent: I spent £350 on ducting A day work on the digger £400 Electricity connection 220 meter and road opening £6,300 Less grant £1,500 Less £980 - this was a cheque I received at a later date. Total connection cost just over £4,500 I paid a further small fee of about £150 to move the cable into the house from the temporary supply. How did you get that quote from SSE? I am looking into the costs of getting similar work to you done, in the Highlands, a road crossing and about 180 meters of cable, my family own the land on both sides of a public single track road, but we need to cross the road to set to a potential house site. Was just thinking about getting a quote from SSE see how feasible it would be, it is not clear on their website how to go about getting quote from them. Link to comment Share on other sites More sharing options...
markc Posted April 12, 2022 Share Posted April 12, 2022 I would ‘mole’ under the road if it’s public and only single track (single track causes a lot of hassle to get a permit to dig/close). you dig the two holes either side of road and all the trenches and save yourself a fortune. 1 Link to comment Share on other sites More sharing options...
jamieled Posted April 12, 2022 Share Posted April 12, 2022 1 hour ago, MBT6 said: How did you get that quote from SSE? I am looking into the costs of getting similar work to you done, in the Highlands, a road crossing and about 180 meters of cable, my family own the land on both sides of a public single track road, but we need to cross the road to set to a potential house site. Was just thinking about getting a quote from SSE see how feasible it would be, it is not clear on their website how to go about getting quote from them. You can get a budget quote from SSE to get a rough idea of cost first before getting a detailed quote if you need it: New electricity supplies - SSEN Link to comment Share on other sites More sharing options...
saveasteading Posted April 12, 2022 Share Posted April 12, 2022 4 hours ago, markc said: would ‘mole’ under the road if it’s public Agreed. you need permission from the council, but you shouldn't need traffic lights, and don't need to cut and rebuild the road using an approved contractor. It is a surprisingly primitive process, and often by small business (man with a van and trailer). Dig a hole each side, push a pipe through with a jack until it pops out. Somehow leave a duct behind (I assume this is easy and standard). Link to comment Share on other sites More sharing options...
Thedreamer Posted April 12, 2022 Share Posted April 12, 2022 7 hours ago, MBT6 said: How did you get that quote from SSE? I am looking into the costs of getting similar work to you done, in the Highlands, a road crossing and about 180 meters of cable, my family own the land on both sides of a public single track road, but we need to cross the road to set to a potential house site. Was just thinking about getting a quote from SSE see how feasible it would be, it is not clear on their website how to go about getting quote from them. By the points mentioned in my original post. An afternoon laying ducting & drawcord. Another evening putting together a grant application. Multiple emails to the quoter to work on the most effective opition. I had loads of bedrock to navigate my way through. One Saturday I spend an entire afternoon with an iron pinch bar, to ensure we avoided any rock breaking. Asking SSE to come out and walk my route and being extra nice. By doing the above it came down by thousands from the original figure. Your wayleave should be more straightforward but you will still need to go through the process. 1 hour ago, saveasteading said: Agreed. you need permission from the council, but you shouldn't need traffic lights, and don't need to cut and rebuild the road using an approved contractor. It is a surprisingly primitive process, and often by small business (man with a van and trailer). Dig a hole each side, push a pipe through with a jack until it pops out. Somehow leave a duct behind (I assume this is easy and standard). During the twlight I may have dug and found an existing duct for our water pipe/telephone. Some where in the region of £500 to £750 saved in permits and road opening contractor cost. 1 Link to comment Share on other sites More sharing options...
Kelvin Posted May 4, 2022 Author Share Posted May 4, 2022 Resurrecting this... The final quote was £1116 which I've now paid and SSEN plan on doing the works in the next 5 weeks. In my experience getting a budget estimate was meaningless as I think they just made it up. Also, worth noting for future reference while there is a 3 month limit for the quote you can extend this if you aren't ready. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now