Jump to content

SuperPav

Members
  • Posts

    222
  • Joined

  • Last visited

Everything posted by SuperPav

  1. As a counter to this discussion, and from someone in a very not-passivhaus house (but OK insulation!), we have MVHR, and a log burner. The log burner is in a room with a supply vent. I agree with all the above points about it defeating the purposes of an MVHR in a airtight house, but for us the MVHR is more than about heat recovery. It runs on the lowest setting, so is quiet, but it provides good background ventilation to closed habitable rooms, which (at least subjectively) means the air doesn't seem stale in any room (which can't be said for previous houses we've had) and even the completely enclosed tiny wetroom bathroom we've got dries out wonderfully. We also didn't want window trickle vents and lots of bathroom/kitchen extracts, so I'm still happy with the MVHR, even if it costs us money to run. Arguably we could've fitted a positive ventilation system for some of the above benefits but there really isn't that much in it in terms of cost (all was DIY'd, the MVHR unit was a good deal.) Probably further offset by the fact we have free wood to burn! Having said all that, if you're after optimal thermal performance, then lose the WBS.
  2. We've had a bit of a change of mind for the upstairs from carpet (original plan) to continuing the same engineered wood flooring as we have downstairs (14/3mm 600x600 versaille parquet panels with ~150mm borders). Downstairs these are getting glued onto concrete which is simple enough. Upstairs we have 22mm Egger Protect subfloors, which I'm pretty sure won't hold nails properly so I can't secret nail the engineered wood panels - can anybody confirm a suitable glue that would work directly onto Egger Protect? Unfortunately as the stairs and a few other thresholds are already in place, overboarding with ply would be a bit of a headache height wise so I'm trying to find a solution which works with the Egger Board. If absolutely not, I could overboard with 4mm ply and alter the thresholds and top stair nosing if that's the only way that would work.
  3. So I've got a twintec water softener, bought it in great anticipation of finally not having to deal with hard water issues. Planned a place for it in the utility cupboard. Happy days. Completely missed the fact that it needs a waste/overflow/discharge! (DOH). Our water main comes into the utility cupboard downstairs, where the UVC, and all the manifolds for the whole house will be. It is in the centre of the ground floor, with no waste. The only "waste" pipe is a 28mm D2 copper pipe running along a wall to the outside to a gravel trap, put in place for the UVC. Is there any way I can utilise this 28mm pipe for the overflow and discharge of the twintec, while also using it downstream of the tundish/D2 for the UVC?
  4. We (well I say we, I mean she) decided that a Samsung Frame TV flush mounted on the wall is a better look than a "recessed" TV with a gap all around. Might be one to check with the boss before building walls?
  5. I have no existing inverter, it's a "ground up" install. Plan to stay within G98 regs using enphase microinverters via their Envoy controller to keep it at sub 3.68kW total. Looks like I'll need to go for the IQ7A's or IQ8's to avoid clipping, the price difference vs the IQ7 doesn't seem massive to be fair.
  6. My garage feed is on a 50A MCB at the moment which having just had a look is indeed on a RCD on the main CU, which is indeed unnecessary I suppose as it could be rewired just straight off the main switch. Garage is fed by 16mm cable as it was sized to be big enough to feed a heat pump, two EV chargers (+ usual garage circuits), and be big enough to reverse-feed the house if we ever upgrade the supply to 3phase - the easiest way would be to run 3 phase to the garage and then split one phase off back to the main house for the domestic loads, as all the big stuff is in the garage. As I'll only ever be able to get an absolute max of approx 4kwp on the roof (to , I'd try and use as much as possible of it via immersion dumping or dumping into one of our two EV's if we ever have a surplus, just seems crazy to lose 30% of the capacity of the cells, maybe I'm overthinking it... I'll be honest I also don't quite understand how they can be rated to 400W DC and only 300kVA AC - what's the point of the 400W DC rating in that case?
  7. Are you tiling directly onto the concrete block? without backerboard or anything? Wish my newly built walls were straight enough for that!! If the tile edge doesn't meet over the chase, you can probably just bridge it (depending on the tile!), I'd personally probably fill it in (even if just squirty foam and then trim it flush), but I'd be putting backerboard over my walls anyway so that would hide any chases.
  8. Welcome Carl! I'm about to almost exactly the same thing project from a planning and design point of view for a friend, so look forward to seeing your plans. Thankfully I won't be involved in any of the actual building work on this one!
  9. So looking to get some PV onto the roof as we hopefully complete the never-ending project this year. I have a sloped roof (35 deg, south-ish) on the garage which is approx 4.2x3.6m of surface, and next to it a flat roof about 7.5m long, so I was planning on getting 10 panels up there, to give me around 4kw of peak theoretical generation, capped at whatever the G98 limit is.. I was planning on the following layout: 6 in landscape 3 rows x 2 columns on the pitched roof in in-roof frames (roof isn't slated yet) 4 in landscape along the flat roof in renusol ballast buckets (world's biggest rip-off from what I can tell given they cost as much as the panels!) However, all the reasonably priced panels I can find (£80 or so for 405-410Wp) are like 1700x1130 size, and I cannot for hte life of me find any compatible landscape GSE in-frame options! Do I just need to get smaller/more expensive panels to fit with their tiny frames (1600x1000 ish). What am I doing wrong? If I can't get them in 3x2 landscape on that roof, I'll need to reduce the number of panels to 4 in line, as I can't quite get 2 in portrait to fit along the roof slope on top of one another. I was also planning on going for micro-inverters as we might have some partial shading due to neighbours trees during some parts of the year, but the enphase IQ7+ ones I look at have a peak output of 295kVA - does that mean I'm losing up to 30% of the panels output by going for microinverters? if that's the case, am I not better off just getting a string inverter and taking the 30% hit on partial shading? All will be DIY'd with the sparky hooking everything up, I will stick a junction box on the flat roof for everything to run into which will then run back to the garage CU.
  10. Probably not depending on which flashing you have (the flexi-bendy ones with straight sides are a bit more flexible in terms of installation), but you can usually adapt virtually any velux flashing kit by making your own flashings/soakers out of lead as required. What I will say though, is that's unlikely to be much (or at all) cheaper than just getting a replacement correct flashing kit from Velux...
  11. Mainly because if I got a 12kW heat pump with cylinder for £6k, even with the £1.5k paperwork fee, I'd get it all covered with £7500 BUS monies. If I buy it myself, without it, it would cost me £5k net of VAT, which I cannot reclaim. Re requirement to be fully built, I was under the impression having read the requirements is that the system would need to be commissioned before the grant is paid, but I don't know how you commission it when the upstairs hasn't got any rooms/rads yet?
  12. If you've not done it yet (we're in the same boat as you, holding out till the house is built enough to be able to go through BUS, while shivering with a 3kW willis and a 12kW shower), we're considering using these guys as they'll do the sign off and MCS paperwork for the BUS. I've been in touch and essentially they want £1.5k for the privilege, but if that gets you £7.5k it's still not a bad deal if you can DIY it. I've also got the advantage of being able to buy/supply the ASHP and install it via my ltd co (i'd still be doing it!) thereby getting the VAT back, which in itself is worth £1k or so.. https://www.unitherm.co.uk/pages/mcs-design
  13. Thanks everyone for the opinions and suggestions. Following the (fairly obvious) mention of having a look through the technical docs, I've gone through the installation manual for the Altherm hybrid ASP, and it can be configured to block the boiler and exclusively use the ASHP down to -14 with a bottom plate heater (£40 on ebay), or -5 without the bottom plate heater. I think based on that I might try and give it a go if the unit is still available for £500... I've got a circ pump that came with my UFH manifold (which would be ~1m from where the ASHP is going, so should be fine), so that's not a problem. Re: A2A ASHP, yes if I hadn't already put the loops in the slab that's what I'd be doing, but as the UFH is in and a garage will always have fairly rubbish airtightness due to the main door, I figured putting the heat into the concrete slab is better than A2A. but A2A would be a better fallback than a new £2k unit. The dream units look interesting but for the price still a expensive especially given I can't see any proper way to control them using a thermostat to call for heat without starting to rig 3rd party control systems etc.
  14. I don't - it's on FB marketplace I think so will need to dig it out on my phone, but it was this unit (with this model code) - EJHA04AAV3, along with some flexi hoses and the controller/thermostat unit, https://www.cityplumbing.co.uk/p/daikin-altherma-hybrid-hydrosplit-4kw-heat-pump-outdoor-unit-ejha04aav3/p/478567 and this is the Daikin manual for the hybrid system: https://www.daikin.eu/content/dam/document-library/catalogues/heat/hybrid-heat-pump/ejha-av3/Daikin Altherma H Hybrid_Product catalogue_ECPEN20-731_English.pdf:
  15. I second the sheradised twist nails - tough as anything on hangers/plates etc. Having said that, I think gluing and screwing 22mm eggerboard to the joists will make more of a difference than anything else!
  16. I'm after a small ASHP for the garage/workshop as in a great moment of stupidity I didn't lay any pipes from the main house plant room to the garage for the UFH circuit there. Given the location and layout etc. it's easier/cheaper for me to just get a separate small/cheap ASHP just to run the garage/workshop UFH loops directly. I've been searching ebay etc. and have noticed one of these units for very cheap - Dakin Alitherm 4kW hybrid outdoor unit. It looks like a A2W ASHP, it comes with the controller, but can anyone confirm if it would run without the gas boiler part? From all the documentation it seems like it *should* but there's no installation instructions or details on it being installed in such a way (understandably). Otherwise I'll keep my eyes open for another A2W ASHP for a few hundred £££ this year as there's no real rush. thanks!
  17. Here's what I would do (as long as you can rod from the outside to reach the bend): replace the vertical bend (bottom of soil stack) with a rest bend, and replace the second horizontal bend with a sweeping long one. You might need a 15 angle connector further down the soil pipe if that puts it too far away from the wall, but then it's OK. I'd then PIR around it as closely as possible, PU foam any gaps as much as possible, cut it flush, stick a membrane over the top and then screed over that.
  18. I'll have a heat pump running 2 UFH manifolds (one for house, one for workshop/gaarge), each with their own pumps. I also have 5 radiators upstairs which will be run off the same heat pump. As all the pipes run radially into a utility cupboard, I was just going to fit them all to a (third) UFH manifold, as it means I can centrally adjust the flow to balance the rooms, and if necessary can later on add remote thermostats to the rooms to close the individual loops, rather than having to use radiator stats. Pipe runs are in 15mm Hep2O. I've found the polypipe push fit manifolds but they seem to imply they're for 15mm overlay/UFH systems. Would the 15mm Hep2O not work with these directly? as it would save me a hassle installing it. If not, I'll just get a cheaper manifold and some sort of adapter to fit 15mm pipe to a eurocone connection (I haven't got any 16mm UFH pipe left over to use straight couplings 15-16mm)
  19. I've got about 70sqm of 15mm limestone flooring left to lay. Laid about 8sqm already in the utility and behind kitchen units, that was done with a combination of Keraquick (white) and Keraflex (white). All went well. Stone is being laid over Mapei decoupling membrane (over heated concrete slab). I now need to buy 15-20 bags for the remainder of the space, so to lay 70sqm of membrane + 70sqm of tile. I am not professional so don't work quick, but don't actually mind working with the rapid set stuff as I mix up a half bag at a time and keep going every 20 minutes or so. The slow set stuff is easier two work with but I do find that the tiles move so much that spacing them (keeping them tight to each other) is almost impossible as they're like jelly. And as we're living/camping in the house, being able to use the floors quicker is a (albeit very small) convenience benefit. I've been very happy with the Keraquick stuff, so if money was no object, I'll just get that for everything. However, there's Mapeker Rapid Set white which is approx 15% cheaper, and on paper is exactly the same??? And then there's the "generic" Mapei Rapid Set S1 white, which is 30% cheaper than keraquick. I cannot for the life of me work out what the difference is. What am I missing? Should I get some slow stuff and cheap grey stuff for the membrane to lay a strip, and then use the expensive white keraquick for the tiles only? Or should I just get keraquick and stop worrying about it...
  20. thanks everybody, UM35 it is then! Although in my head I still can't get round the fact that 20 years ago they wouldn't have had any membranes and people have been tiling onto slabs for god knows how long. So what's changed? Why can't you just tile on something like a lime mortar which inherently is very soft/flexible, and worst case is a tile goes loose (rather than cracks) and you just re-lay it on some fresh lime mortar...
  21. I suspect I know the answer here but having never done it before, I'm about to start tiling the utility and kitchen which is part of a wider open plan 70sqm area. It's being tiled in 15mm limestone, and I'll be using either Keraflex maxi S1 or Keraquick S1 adhesive (I usually prefer working with the slower stuff, but am willing to go for the fast set if it's needed for the stone). Now, originally, I hadn't even considered any form of decoupling mat. However, the slab has shown some stress fractures. Slab is 150mm self-leveling concrete with reinforcing mesh and UFH tied to mesh. It's been laid about 6 months ago so is fully dry/cured. Cracks have appeared at doorways and other "jutty out" places, all cracks are <1mm and some are just hairline. However, they appeared at various points in the first 3-4 months (rather than all at once) but seem to have now stopped. The cracks are not linear across a threshold etc. so I can't just lay an expansion joint over it (and frankly trying to avoid any expansion joints as the "doorways" are open plan 2.0m openings. Now that I'm about to lay the tiles it's dawned on me that I need some form of crack control. Initially I thought I'd get away with a thin (e.g. Mapei waterguard) decoupling membrane, by just patching it over the cracked areas, and tiling over them with the flexible adhesive. However, the more I read about it, the more people just nonchalantly say "you need to ditra mat it" or equivalent (in my case the cheapest thing I can get is Mapei Um35 which is basically the same thing). Problem is, it's another £700 (+ whatever the extra adhesive costs) which, as everything else it seems, was not planned for and which unfortunately at the moment we don't have so it would mean at least one room not getting plastered. Even if I had to replace 5 sqm worth of tile in the future it would still be cheaper than £700 as I'd be doing it myself. I obviously don't want the tiles to crack and at 15mm they're not as thick as some limestone tiles, but before I get rolls of the gold dust membrane, can somebody reassure me that it's worth it (or alternatively have any experience of tiling onto a cracked, albeit solid, concrete slab with just patches over the cracks or no decoupling at all)
  22. Thanks all! The celotex is not the only insulation, there's 200mm of rockwool between the rafters, the 50mm celotex is underside (held with insulation washers with screws into rafters) Also to be clear I wasn't just going to rely on the adhesive for the plasterboard, it would get screwed in, the rationale for the adhesive was that I could use a thinner board bonded to the celotex for stiffness between the 400 c/c rafters. Consensus seems to be 12mm boards so will just get some of that and some more weetabix 👍 and will just chop it down if I find it too heavy to maneouvre. The batten approach as a ledge to rest on works well for the first board at the eaves, but that's the one that's easy to get up with the PB lifter anyway. Where it doesn't work well is the top board which needs to be tight into the corner between the ceiling and the ridge beam (which is exposed), so it needs to be slid up, rather than tipped into place, all at a height which make it all a bit awkward.
  23. So we have vaulted ceilings upstairs up to an exposed ridge beam. Eaves approx 2.1m, ridge approx 3.6m, so approx 2.6m long on board from eaves to ridge Currently I've fitted the 50mm celotex under rafters and taped. So it's ready for plasterboard. Due to tricky access and ability to lift the boards into place etc, it will need to be "patched" rather than fitting 3m boards in a single length. I'll be glueing the plasterboard to the celotex with foam, and then a few 100mm PB screws through the celotex into the rafters - trying to limit the number of these due to cold spots. Any reason not to use 9mm here? as it would make my life installing them a hell of a lot easier (even considering using 1800x900 , it'l lbe worth the £100 extra cost, although I suppose I could just cut full boards down if cheaper before I take them upstairs)
×
×
  • Create New...