  1. @Bobo just double check they have used the correct sheet material for the membrane as well since they may not have understood what was required and I can't see any red membrane showing in your photo (actually some Radon membranes look to be green as well). I expect joints would need to be overlapped and taped as well which may not be the case for DPM. Potentially a bigger problem if they have used the wrong membrane, but it may make for an easier solution as it potentially narrows down your options as you'd probably have to have a fresh membrane over the top of the concrete slab. It would be a pain to live with during the build though, so you may prefer to go a 'perimeter and infill' approach where you put gas proof DPC in all the walls sticking out enough (e.g. 100mm) and then later, when less likely to get damaged, you stick in areas of gas proof membrane attached to the DPC using that gas proof tape. Hopefully obvious, but that gas proof DPC would have to be under ALL walls, so include internal walls. You'd be making a continuous barrier out of the DPC and later applied membrane. You don't seem fully convinced you need a Radon barrier. Double check that as I don't think there are any grey areas in it from a regulations perspective. Maybe you wanted it as you are outside (but near) a required area, but is it in the existing house and if so how are you joining to it?
  2. No worries, happy to try to help. I've found these bumps in the road can be stressful, but are part of the journey. Solve them promptly and completely so they don't come back to haunt you and cost much more to resolve
  3. The suggested fix in green is likely to be the most pragmatic solution. They will have to scrap out the perimeter insulation a good depth (e.g. 75mm), tuck in some double sided butyl tape and the attach the green portion. Pig of a job unfortunately I think this is the sort of tape you'd want. https://www.permagard.co.uk/radbar-double-sided-tape-dpm-tape
  4. I think your idea would work against the damp as the perimeter insulation may not wick water, but it wouldn't satisfy the Radon requirement as far as I know, but my knowledge there is very limited.
  5. I think it's more about the Radon gas side of things. Something in your favour is it looks like there is around 50mm of edge insulation.
  6. Ah, that's very different then. To protect against gas you need to have it continuous across the cavity. You either have to have a radon barrier or not and if you have to have it it has to be installed correctly. Could be very expensive to correct later if building regulations get worked up about it, or your Warranty provider. Is the material you have referred to as DPM actually a certified radon barrier. To key options come to mind: Take down the first course of bocks to expose the orange DPM/Radon barrier and make a good solid joint to new sections. Apply a Radon barrier on top of the concrete floor slab, across the cavity. This would require a cavity tray on top of the radon barrier which is a nuisance.
  7. That answers my question, the first course of blocks is in place (pink in the sketch below). Drastic, but you could remove that course of blocks to join to the orange DPM, but I'm sure someone has a better idea
  8. I suspect the orange DPM would only really need to extend up another ~100mm join with the DPC (blue) to perform its function * . The DPM doesn't need to cross the cavity as far as I understand. You have a break in the damp protection between the top of the orange and the blue DPC. Is the first course of blockwork against the concrete floor in place yet? * Please confirm it is only against damp not gas (eg Radon etc)
  9. I'm trying to make up my mind between roof tile vents or wall based extractor fan outlets. It would be the roof option all the way if not for the possibility of condensation being an issue. Does anyone have any experience they can share. I've copied below some pictures of what the roof tile vent looks like (in this case for an SVP vent). I've also copied a very good video about installing such vents. He advocates having a horizontal section to allow any condensation to pool and then evaporate naturally. In many of my instances, the insulation will be at rafter, not ceiling, level but I expect a horizontal length is still a good idea. I probably have an irrational fear of ducting with mould growing on the inside.
  10. Is the current DPM between the insulation and poured concrete? A sketch or photo would help understand
  11. This is looking promising. I weighed down the closest pipe with a brick overnight. I may also try a heat gun at around 100C (testing on membrane scraps first)
  12. Would be OK upstairs but not with the gas barrier
  13. I was pleased to get the keep outs, edge strip and membrane down But unfortunately the UFH pipes are pulling up Any ideas as to how to solve this? I can't use anything that penetrates the green sheeting. It's not insulation underneath, it's concrete and, on ground floor, a gas membrane too.
  14. I think you'd be lighter after releasing it as it is under pressure inside you and so more dense than the air your extra volume would displace. If you were underwater though, you would become less buoyant after releasing it.
  15. Rats, I think I should have done the perimeter strip before the membrane
  16. Interesting talking to one screed supplier who said liquid screeds can react with concrete, so definitely need the membrane. She also said that liquid DMs are not suitable. I had read before that screeds can react with aluminium (e.g. on insulation) and know that wet cement does too. I recall reading about an unfortunate prototype aluminium cement mixer. Looks like I have to carry on with the vapour barrier. I'd bought some spray adhesive in case I wanted to bond the membrane down against gusts of wind etc. I haven't used any of that yet though.
  17. On the ground floor I have a gas membrane over the top of concrete and on the first floor I have hollowcore concrete planks as the floor. On both levels I'm going to have 40-50mm liquid screed with UFH in. I've started putting down 125um polythene* and it feels pretty pointless. Downstairs there is already an impermeable membrane. I'll discuss this with the screed guys and see what they think. Upstairs is different, but still feels like there could be something better. I don't have insulation on top of the concrete (GF it's below the 50mm concrete, FF don't want it as not worried about responsiveness). On the first floor, the hollowcore (HCF) is largely 'waterproof' with a few scattered holes. What have others done here. It's impossible to not have some voids under the membrane and it feels unnecessary. It occurs to me I could do some of the following as an alternative to membrane: Paint some form of sealant on the floor and add edge strip Apply a thin layer of self levelling compound (1-3mm) to form a seal and add edge strip Just fill any holes that would leak and add edge strip All would give a more intimate connection between the HCF and screed as well as being much faster than membrane. * https://www.toolstation.com/green-vapour-barrier-125mu/p86538
  18. I did wonder about that, but when the roofers fitted a tile vent it took me a while to notice it
  19. Bit of a tangent, but what do people think of roof mounted vs wall mounted bathroom extractors? I don't have MVHR.
  20. I did ask before if I could jus have an AAV and he said at least one SVP needed although it's a single house and package sewage treatment plant situation
  21. I'm sure a 15mm pipe would work by 75mm is the reg. (copied in my previous post).
  22. For reference, I thought I'd add some extracts from Part H:
  23. Which route would you take? OK not you yourself, but which route would you let the foul smells take. The Architects plan was to send the soil pipe down through the floor in the right hand corner of the bathroom (as viewed below) but we not have open space below now so don't want to put it there. As it's now going externally, we moved it close to the side of the chimney to reduce its visual impact, and that position is shown below. This is the furthest extent of the foul water system and so needs an SVP (not just AAV). We don't want to continue the stack outside and offset round the eave. We don't want the vent tile too close to the chimney so it likely needs to be towards the top right corner of the image below. I see two main options: Route the main stack to SVP tile vent connection as shown below. 75mm horizontal run at floor level junctioning to a 75mm vertical run up to the vent. Route a vertical run of pipe (e.g. 75mm) up the top left corner of the image below and the turn horizontally in the roof space track along and the back to vertical above the right hand corner and to the vent tile.
  24. Interesting to see how these sorts of things are done in other countries. They made the hourdi blocks onsite. https://youtu.be/lF7aSes4gcU
  25. An alternative shutter approach is to use some short lengths of narrow rebar, some wire and some OSB3 strip (about 150mm wider than gap. Pass a loop of wire through the gap and round the OSB. Secure the wire tight to the rebar on top of the planks. Do this at each end of the OSB. Then fill the created pocket with a cement ballast mix. Guess you could use timber rather than rebar if you the cut the wire later. Otherwise you can just leave the rebar in place
×
×