-
Posts
21126 -
Joined
-
Last visited
-
Days Won
206
Everything posted by Onoff
-
There's a pub in Shoreham (Ye Olde George Inn) straight out of Lilliput the ceiling's that low!
-
Tips on grouting please, only done the floor back in August and have NEVER done walls. How long should it take me to grout the bathroom? Is it OK to stop and start grouting? Start at the ceiling and work down, a metre square at a time?
-
-
Keep up! Did that back in August! 20 left to cut, lots to stick!
-
How did it die? Did you try the hdd in a USB caddy?
-
So would an inset, insulated, heated block of concrete as a thermal store mitigate some of that?
-
P & W Nash would likely roll you a heavy duty mesh drum if you went that route.
-
This sort of thing but motorised: Using an actual recip saw: I rather like this one:
-
Only got this bit. Nominal 1 1/4" x 1 1/4" so about 35x35 through the hole - too small I assume. Not taken a vernier to it but looks about 4mm dia rod. Guessing about 6'x4'. Red oxide painted. Will happily dig it out.
-
I'll look in the garage in a bit. Might have a piece. If not P & W Nash at Hoo ask for Stuart. He'll be able to supply mesh in various sizes, cut to size, galvanised if required. Tell him I put you onto him The BiL made a reciprocating sieve that sits atop his dumper. Slide rails, motor with a cam. Will try and get a pic tomorrow. Rotating drum types good for soil mainly. Get on Pinterest and have a look there for ideas.
-
I wondered. Certainly all PPE'd up. Respirators etc.
-
@Nickfromwales, I'm applying "your" method here that I used in the pockets. Laser line with the tiles upside down to mark them. Set on the yellow 1mm shims. Once stuck on do I: Clear CT1 to be run into the 1mm gap then a white silicone bead OR Grout along with everything else then the silicone bead? Cheers
-
Seriously now is there any benefit in excavating a neatish, big hole in the floor, say 300 - 400mm deep. 150 - 200mm of PIR in the base, 50mm PIR round the sides. Wet concrete slab with a UFH loop in it. Obviously a channel cut in the floor to a manifold. ???
-
Just out getting a couple of tyres done and there were a couple of units on the estate appeared to be being spray insulated with Icynene. Saw a chap in a "space suit" and caught a glimpse through the open doors of the ceiling all sprayed. Another lad appeared to be dragging out random lumps of PIR:
-
Is he happy, grumpy etc?
-
That's them all nailed down. Couple of oversize joints but hey ho! "Proper" tiling can recommence!
-
Surely silicon carbide would be... ...roughing it!
-
My post edited with lots more details.
-
I'll edit the post and add detail of all the stages I can think of. Tbh the build up is down to the input of all the good folk on here. I'll namedrop where I can, apologies if I credit the wrong people or forget someone!
-
Can be done & cheaper than gym membership! 1) The bathroom had a concrete floor some 60mm higher than the adjacent rooms. It was in fact pretty much dead level with the DPC (damp proof course). That was slate on the two original solid brick walls and some sort of bitumen felt on the two cavity walls: 2) Not the only room in the house with level issues. So out with the BiL's vintage Kango: 3) I bagged it and hand balled it out the front door. About 80 bags from memory: 4) Got down to top soil: 5) And started to DIG! Someone worked out the tonnage that I shifted, again by hand. 7 tonnes? Can't remember though I did lose weight! 6) Hit our wonderful clay not too far down: 7) So then to build it back up. I didn't now how but knew I wanted UFH. Started the questions on eBuild! So I banged a load of level pegs into the clay allowing 2 - 4". Tbh nearer to 2" in most areas. Sprayed the pegs so I could see them: ? First off I graded a load of the hard core that came out of the floor thru a 40mm mesh sieve. Basically I'm too tight to buy Type 2 etc. Laid it roughly level: 9) Somewhere around this point I shuttered off and squared up, with concrete, the ragged tops of the footings: 10) Any old bags of cement, plaster etc got thrown in to help get rid of it and fill voids in the hard core: 11) I then bought a second hand electric wacker plate and compacted it all down. (Did take a slight diversion and started making an electric wacker plate. THAT story is to be continued! ) It WILL live one day! 12) Anyway.....back on thread. Wacking: 13) Sharp sand went down next to fill all the voids. Me being me it was all levelled off: 14) At this point I was feeling pretty happy, I mean it just looks FINISHED! 15) 25mm of EPS went down next. EPS doesn't suck up water like PIR can so can be in direct contact with damp "ground". It's why so many here put 300mm of EPS under their concrete slab under the whole house. The combo of the sharp sand and EPS is to ensure no sharp bits of hardcore poke up thru the DPM (damp proof membrane). Think the sand and deffo the 25mm EPS was @Nickfromwales idea. 16) I'll openly admit I went full @pocster and had a sneaky, naked lie down on it at this point. It felt SO WARM! 17) I continued the EPS over the squared off footings and up the walls a little as a nod to cold bridging. Glued on with Soudal Low Expansion Foam, thanks to @JSHarris for that tip. You can see where the damp is coming thru: 18) Probably OTT but I applied a liquid DPM up to the level of the DPC. 19) Whilst the second coat was wet I blinded it with sand to give something for the Soudal foam to key to and when dry foamed the EPS in place. 20) Thick, blue DPM next. From Screwfix, on a roll: 21) Bit of a pig folding it into the corners: 22) Next 150mm of PIR as a 50 and 100 layer. Better to put the 50 down first the the 100 - wish I had! I'd suggest 150mm as a minimum. With hindsight I'd have dug a bit deeper and gone 200mm: 23) The DPM carries on up the wall with the intent of sticking to / overlapping the vcl on the stud walls to come. It's why the room is so draught free. 24) Now at this point I could have laid a plastic membrane over the foil faced PIR and stapled my UFH pipes down.....I didn't. Instead I used Polypanels as I think suggested by @PeterW. They serve 2 purposes; to act as a separating membrane between foil face and screed or concrete (you can get a reaction) and also to aid laying the UFH pipe. They also save a bitbon concrete: 25) I used a self adhesive edging strip, basically a corrugated cardboard/EPS sandwich. This takes up any expansion of the slab as it heats up.....or it can push against your walls! Probably overkill as I've already the ESP upstand: 26) With my homemade pipe decoiler it makes laying it a breeze as the video shows: 27) A142 reinforcing mesh was laid next as per @JSHarris's build / suggestion. Probably the only thing the houses share in common! I attached screeding rails (Unistrut) to the stud walls which were only affixed at this point to the walls and ceiling. A drag board went between. It's the reason my slab is so level: 27) A strong., wet concrete mix went down to give me a 100mm slab. Pockets left for the wet room tray which I cast later and one to "sink" the bath a bit: Et voila: From top of the original concrete I dug down a minimum of 385mm. Final, conservative floor build up was: - 50mm compacted Type 2 on clay - Sharp sand blind - 25mm EPS - 1200 gauge DPM - 150mm PIR (100 + 50) - Polypipe panels - A142 mesh - 100mm concrete (though I forgot to add the fibres ). - Ceramic tiles @oranjeboom has done similar to his WHOLE HOUSE. Tbh that's my plan eventually.
-
BEFORE you have the lino done! My own kitchen might have some parallels. Pic shows it taken from outside with the phone stuffed through the fan light. SWMBO's fo'd to Bluewater or somewhere. Nice to come home to it all tidy! I have no heating in the kitchen. It is 'kin cold. Even been known to leave the oven door open to warm the place up. The kitchen is a years ago add on. Concrete floor. The oddity is that the concrete floor is just a solid 5" slab cast over the ORIGINAL concrete floor. I could likley Kango it up and gain 5" in room height. The readon for this we think is that without it there would have been a 1' step down from the boiler room to the kitchen floor. So from outside you step up into the boiler room. Then one step down into the kitchen, then step down into the rest of the house... I've discussed on here previously about digging down a bfo rectangle in the kitchen floor. Then heavily insulating underneath (& sides) and concreting back up with UFH pipes in. It has some merit.
-
Help with kitchen renovation/ 1st house.
Onoff replied to zoothorn's topic in Bathrooms, Ensuites & Wetrooms
Edit: Post moved to other thread. -
Help with kitchen renovation/ 1st house.
Onoff replied to zoothorn's topic in Bathrooms, Ensuites & Wetrooms
From memory you have open doorways? To a draughty lobby? Won't matter if you've 300mm of pir on the walls floor and ceiling! Gotta stop the draughts and heat loss points elsewhere. Any heating in the kitchen? -
You might struggle to find anyone who does! The generic term working with a bunch Kiwis was "sealastic" for anything that came out of tube like this.
-
How quick does it go yellow between bleaching?
