Weāve done two jobs with Bushboard
Each job had over 150 shower rooms
Lots of students
Weve been back snagging but nothing major Stick them directly onto Moister resistant Plasterboard
Super easy to use
Plus 1
As a tiling business we tile lots of showers etc
The last five or six years we are being asked to fit panels instead to blocks of student accommodation Much quicker and cheaper and look ok
The short answer is thatās itās easier and quicker to do this For HIM
If the concrete is in his price thereās no issue If your paying for it Ouch
None the above is Structual so no need for Building Control
I would use a solicitor to draft a letter stating the above and send a copy to the leaseholders Then everyone knows where they stand
Should be straightforward from there
We normally just nip the edges every 50 mil top and bottom with a grinder and break off with a chisel Hours topps
Then fix a a sheet of stainless mesh over 2.4 x 600 Then scratch over Donāt fill the holes prior
They will probably knock ins that they are suggesting You wonāt get them out easily
We normally just use a handful of nails while setting out (40 mil) Easy to pull out
Iāve used a nail gun for the past 30 plus years you could use knock ins We use Tek screws when fixing to tiled floors
Most hire shops have a Hilti nail gun
Just to add that the EPC is a really tough guide
Most will do the whole street the same rating
Weāve a chap that does the EPC for our rentals and he charges Ā£38 per property
He normally gets between 5-10 done pare day Then types them up at home
You need to get them to stick to YOUR numbering Window suppers have a habit of adding there own numbering or get to say window 5 and put x 2
Looks crystal clear to me