Hi first real post on here, I have found the information gained from site invauable, Thanks.
New build bungalow, beam and block floor , 180 mm PIR insulation over screed to be around 70mm depending on tile or carpet finish. UFH by GSHP so hope to run at low temperature, supply pipes as low as possible, below 30Deg C ??
The feed to the manifolds from the buffer vessel/GSHP are well insulated.
Is there any need to insulate the supply pipes to indervidual rooms in the screed, especially where they are grouped together, down one wall the plan shows 4 suppy,4 return pipes laid close together in the screed? This area will be tiled.
Few more details of build 200m2 bungalow, masonary constuction throughout, wet plaster , 125 cavity wall, 115mm Kingspan insulation in walls, Rational tripple glazed windows , MVHR , GSHP. PV in roof panels. 200mm PIR in ceilings or roof.
The ufh pipes and screen are due to go down in a couple of weeks. Plenty of mistakes made in construction already and it will be interesting to do the airtight test , that is the bit I have had most trouble comunicating with builder.
However overall I am absolutly thrilled with the build so far.