twice round the block
Members-
Posts
411 -
Joined
-
Last visited
Everything posted by twice round the block
-
Nice idea..... but you are building the house twice. Your building first with ICF. Then your building the same house with an oak frame. I've recently spoken to Oakwrights about doing oak detailing in a conventional brick and block build. That way your not paying for the build twice, but still getting the effect in chosen rooms. Oak frames can make room designs hard, as the frames get in the way of placing furniture and maximising available space. You only have to look on various Oak frame manufacturers websites to see some of the issues you face. If you do a full ICF build you can have oak engineered flooring,oak doors, oak kitchen etc, and your only paying for the build once.
-
Get the hole cutter out. Get the waste out of the wall 2 courses lower. Cut a new boss into the soil stack 4 courses lower.
-
Demolition & Self-build in East Cambs
twice round the block replied to srowe's topic in Introduce Yourself
Great to take on the neighbouring property. That's one less person that can object to the planning proposal 😇 -
Use your home insurance and let them send a roofing contractor round.
-
You may want to pull the planters away from the wall to give some air circulation
-
Couple of issues I've come across with the outlet pipes and draining off of the condensation. The pipe exiting the boiler has had a slight upwards incline and so trapping water in the first section of pipe below the boiler. Mass builder's don't you love them. The sink drain (U bend) has had a partial blockage and so backs up water to the condenser pipe. With an external venting condenser pipe this has been sat on a gully cover and frozen upwards with a large ice core. All of the above have caused the boiler to shut down
-
You need a large concrete profile beams, the same shape as your tram track in your harbour front but bigger..... and no cutting out a section of track to see !
-
Change to plan after approval?
twice round the block replied to eros_poli's topic in Planning Permission
How are you allowed timber cladding over an integral garage? plus a neighbouring garage against that. What part of fire regulations does that not come under.? You can't even construct a timber building on a boundary. -
We have our planning permission!
twice round the block replied to mjc55's topic in Planning Permission
Well done. I hope you've got a nice new boundary fence between A & B on the plans !!!!. Glad you got that saga sorted out in the end so you could get a design together. -
Missing chimney breast in the downstairs flat
twice round the block replied to Kitane's topic in General Structural Issues
Is the chimney stack on the roof above your flat?? Have you got a photo of it? -
Checklist for new build / extension
twice round the block replied to sokoma's topic in General Self Build & DIY Discussion
A local architect will know what is feasible and if you can push the boundaries and what the chances are of getting planning permission on it, which is also dependent on your local authority. How efficient they are / or not, and the time scale involved. -
Checklist for new build / extension
twice round the block replied to sokoma's topic in General Self Build & DIY Discussion
As per my other reply. Once your architect has got planning permission for you, he'll then do a set of construction drawings with relevant building regulations. These can then be used to price the build. -
Just get a good architect to do a design your happy with, and that he can get through planning.
-
uninsulated soil stack?
-
Broken handle - get off you bast
twice round the block replied to Pocster's topic in Doors & Door Frames
Take it off it's hinges and spin the door over so the duff handle is on the inside. 🤣🤣 -
If your boat is of steel construction and not traditional build the extra heat you generate within your nearly air tight pod will feed through to the hull and head immediately to the coldest area's ie. the uninsulated area of the boat. The stern where your engine bay and fuel tanks are. You will always get moisture inside metal fuel tanks, hence why new builds use polymer tanks. If the boat is of traditional timber construction this allows your hull to breath, and the build up of heat dissipates differently.
-
Slightly concerned about the amount of insulation you've put into every void inside the cabin space to lift the temperature when your diesel tanks are below or just on the waterline getting chilled with the outside temperature. This will cause excess condensation to your tank's and even more water in your fuel. I know or hope you've got a water separator in-line, but it won't help with the rapid increase in contamination of your fuel in your tank's. So by curing one issue you could be creating another for your self. Please don't install a hybrid unit over the top of your gearbox / final drive as it causes a major strip down just to change a control cable.!!! Back ground. Factory marine technician and a few year's working for river canal rescue when I got bored after taking early retirement.
-
Under "foundation" sub section conduits and services
-
Mortar on indian sandstone slabs
twice round the block replied to xtianaudio's topic in Landscaping, Decking & Patios
Looks better now. Re-grout next year and it will be as good as new. I use Algon patio cleaner every spring and it restores the natural sandstone colours. -
Kubota K36/3 Excavator mystery lever
twice round the block replied to LSB's topic in Tools & Equipment
Download an owners manual for it. The change over gate on mine is for auxiliary hydraulic lines on the dipper arm for powering up a pecker or flail head etc.
