I’m looking at this detail in the drawings and noticed the ‘site fitted batten’ I can’t see this but also wonder if it’s necessary as looks horizontal which would surely block the service cavity created by the vertical battens. Given it’s in the eaves I may not need the service cavity. What’s not shown in the drawing is the ybs super quilt under the vertical battens. 
I’m probably missing something obvious 🙄

 Sorry I haven’t got any actual photos as not on site at the moment.

IMG_6739.jpeg

Posted

Forgive me if I’m being more thick than usual, but is that a cross section detail of the joist/downstairs panels/ upstairs panel junction?

Posted

It is normal to have a top and bottom bar to a service void.  Drill or leave a notch where you know services will pass thtough

 

Airtight_1.thumb.jpg.2af0348d591c71159d94fef06eb25037.jpg

Posted
5 minutes ago, ProDave said:

It is normal to have a top and bottom bar to a service void.  Drill or leave a notch where you know services will pass thtough

 

Airtight_1.thumb.jpg.2af0348d591c71159d94fef06eb25037.jpg

Thanks that’s helpful…. Another job the TF sub contractor was supposed to have done but didn’t 🙄

Posted
31 minutes ago, G and J said:

Forgive me if I’m being more thick than usual, but is that a cross section detail of the joist/downstairs panels/ upstairs panel junction?

Yes cross section of ground floor to first floor junction

Posted
3 hours ago, junglejim said:

I’m looking at this detail in the drawings and noticed the ‘site fitted batten’ I can’t see this but also wonder if it’s necessary as looks horizontal which would surely block the service cavity created by the vertical battens. Given it’s in the eaves I may not need the service cavity. What’s not shown in the drawing is the ybs super quilt under the vertical battens. 
I’m probably missing something obvious 🙄

 Sorry I haven’t got any actual photos as not on site at the moment.

IMG_6739.jpeg

Shouldn't the VCL finish behind the battens? If they're service battens, or is there additional insulation going in between?

Posted (edited)
1 hour ago, Nickfromwales said:

Shouldn't the VCL finish behind the battens? If they're service battens, or is there additional insulation going in between?

Yes good point… I was planning on lapping up under the ybs superquilt and taping together so would need to do that before adding horizontal batten presumably. 

Edited by junglejim

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...