Poured insulation! Am I missing a trick here?
-rick- replied to Nickfromwales's topic in Heat Insulation
Could save a lot of labour if trying to lay a lot of insulation. Is this viable as an alternative to the EPS300 under insulated slabs? -
Do you have any photos from when the work was being done?
-
That seems like a lot more effort and cost than normal boarding.
-
I've heard it called a level 5 plaster finish though I'm not sure that's entirely the right term in the UK. It's done at the plastering stage not painting stage, though I'd guess you could do a lot of sanding to get there.
-
Oh sorry. Was thinking it was the Chongfu one. Less likely an easy fix then if it's not a fluke.
-
Concerning. Definitely possible its a fluke but if it recurs I'd guess something on the control board is faulty and that will be a pain to investigate. I'm just a hobbyist but I'm a little doubtful an overvoltage condition would cause a PFC overcurrent error as the PFC circuit should self regulate whatever the voltage. About the easiest to fix 'electronics' issue that might cause this is bad capacitors but the input capacitors are generally fairly robust. Having said that, your HP is a Chinese up and coming brand rather than big name so maybe they cheaped out there. Edit context: The most common PFC circuits work by boosting the voltage from the incoming supply to around 380-400V DC which is then used by follow on circuits. The boost works with an awareness of power factor so it draws more current at the peak voltage of the mains cycle and much less at the minimum voltage. AFAIK it will draw more current in an undervoltage situation, but it would have to be under by a lot I would have thought, ie, a brown out.
-
That's what I was thinking. You'd use a decent amount per board rather than a couple of screws. Glue is prob more expensive than screws but likely easier. I did pause after @saveasteading's comment as I did see someone talking about how their 'used once' container had paint peeling. My guess is that assuming you gave the surface a once over pulling off anything loose, so long as you covered a decent area with glue and weren't hanging stuff off the cladding it'd be ok.
-
Traditional PV to power a traditional electric system will be alot cheaper.
-
Hi, could you check my figures are correct, thanks
-rick- replied to collectors's topic in Photovoltaics (PV)
A string of 5 with a voltage less than half the mppt maximum is not going to perform very well, especially poorly in low light, it's operating voltage is too close to the startup voltage. Sounds like one string of 10 would work fine assuming the panels are all in one orientation and no shading issues. If you want to have two strings for shading, orientation reasons then maybe look at a different inverter or optimizers? -
If just securing cladding with no structural purpose any reason not to use a flexible glue (CT1)?. Seems to me that would be easier, quicker and thanks to the flexibility possibly better given wood/metal will expand at different rates in the weather.
-
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
If you are thinking about something like this then definitely also look into waste water heat recovery. Might not work well for your floorplan but if it does I doubt it would cost significantly more to install than an electric booster and could reduce the need for heat input by 40-60%. Edit: I had second thoughts about this and went to check the specs. These things have a limited flow rate range so they lose efficiency if shared between showers they won't work as well, and installing one per shower gets expensive so it's not as clear cut as I initially thought. -
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
They are basically electric showers with better controls but installed elsewhere. https://www.flexiheatuk.com/product/electric-instantaneous-water-heaters/ -
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
I'm sorry if anything I said comes across as this. Sometimes threads on here move away from the actual question and onto the theoretical. In this case the question was a about gas boilers and the early answers were about that. Then, as is common (and generally good) on these forums, you asked how an ashp user would handle this and we diverged off into the theoretical. For what it's worth I think @Indy is being completely rational to stay with gas given the current state of the heatpump market, ie, if you are not careful you can end up with an expensive and shit install. Given that the gas market is unlikely to stick around forever, I do think it wise to allow for a future change to heatpumps but in the near term, it's not wrong to stick with gas for a high demand house. Staying on the original question, the one point that is worth considering is whether the question would be better phrased as 'Whats the best way to provide hot water for 4 people to have long showers without a wait for HW tank refill' rather than asking for unlimited water. The answer may be different to that question than unlimited water, at the very least it opens up more possibilities which can then be compared on a cost/ease of install/maintenance basis. -
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
TBC wasn't a proposed solution to this thread and you have chosen the biggest one. Just saying that heatpumps exist in pretty much whatever capacity you want. Also heatpumps like this (top venting) won't need clearance on all sides. -
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
There will always be a heatpump option (with other tradeoffs of course): https://clade-es.com/products/commercial-heat-pumps/elm-heat-pump/ -
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
Get new ones! -
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
I reckon you can be confident that mains gas is available for another 20 years or so. After that I'm less sure. Gas boilers will at some point get banned from sale with incentives for people to switch away. Overtime with less people using gas the economics of maintaining the network (at least outside industrial areas) become iffy and I don't think residential cooking is enough to keep it going. I hope you will still be giving a shit at in your 70's, it's not that old any more -
Not directly answering your question but I believe there are options via commerical operations. They handle the payment, etc, take a cut and you get a cut. Obviously the fees to your tenants would be higher than normal at home charging so that might be a factor. Quick google gave me this: https://www.smarthomecharge.co.uk/features/make-money-with-your-home-ev-charger/
-
I watched this a while ago and thought he did a good job of it. He seems very happy with the result (there are follow ups). Maybe worth a watch:
-
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
Yes, after John's last post I realised that I wasn't thinking/communicating clearly about this. I'm aware how it works but clearly got thrown off track. I think my point stands that if you set your heat source gas or ashp to run during the shower time then it will extend the amount of hot water available from a tank, priority doesn't even come in to this. The caveat is that it needs to be on and near temp before you start and thinking harder I have experienced the cold slug from the heating system coming on mid shower occasionally in the past so I should have been less surprised by John's experience. -
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
Gotcha, well back to the main topic. If you wanted to make the tank water last as long as possible wouldn't turning on the heat pump before the shower to make sure it's running at temp get back to the situation as I originally suggested? -
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
In a priority hot water setup the bottom of the tank shouldn't get anywhere near that low should it? The temperature sensor is in the bottom third of the tank and should start the heating process as soon as the temp drops below the setpoint + hysterisis. At least that's how I thought it worked. My current system is s-plan but plan to switch to PDHW when the warranty runs out on the install and I get around to buying a new controller. -
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
Oh, maybe it's because @JohnMo has really long pipework to the ASHP so there is likely a lot of cooler water in the lines that initially warms from taking heat from the cylinder? Edit: If so, could probably eliminate this effect with a bypass valve near the tank that bypassed the tank until the loop was up to temp. -
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
Well that breaks my mental model of how this works and would seem to invalidate the whole concept of priority hot water (which loads on hear swear by). Have you come up with any explanation as to whats happening? Edit to add: I have my boiler providing DHW heat when I shower as a matter of routine and have never noticed any problem with that. -
Unlimited hot water with 4 bathrooms - is it possible?
-rick- replied to Indy's topic in Boilers & Hot Water Tanks
One other thing to add is that if you have say a 7kw ashp in a priority hot water setup, even though it won't be powerful enough to provide continuous hot water, 7kw of heat input into a cylinder will at least slow down the rate of heat loss as you use water. So a 300L tank will go a lot further than the same tank without priority hot water. In the event you have guests it's unlikely everyone wants a shower at once. They will naturally space out a bit as people talk, people fuss over the mirror in the bathroom to shave/apply makeup/use the toilet so that 7kw heat input goes a lot further than you might initially think.