  1. Plus 1, Go back to planning with a new design TF While more expensive than a solid build Is perfect for the novice Absolutely no need for a project manager Just someone to coordinate and make on the spot decisions
  2. You don’t really need to do anything at this stage Get your quotes in As detailed as possible
  3. Unfortunately you will have to remove the blackjack before applying the slurry Sika is cheaper and a better product than Vendex
  4. Work your tiles to the perimeter of the roof You will drive yourself mad trying to set out to your Velux es
  5. I don’t I contact our local authority they sent me a form
  6. Regardless of beadings I would tell them to replace the frame The fitters shouldn’t be cutting anything off the frame All the drainage is normally done at manufacturing Very rough work
  7. I applied for a rural grant Which took the construction cost down to about £200 They installed an atlas box as a temporary connection I simply dug a trench and installed a stand pipe in a timber box made from Scaf planksNo charge for the water we used over the two years building
  8. All sited condensation as an issue All said the benefits of cooling are quite small All where quoting for Mitsubishi Eco
  9. Our neighbor is on there nineteen year with a Panasonic Which is sited on a flat roof Very exposed So you have longevity with this brand We had three quotes and all where against cooling and advised a small air on unit
  10. No Quite a few WD for one yep companies own HSE rules Help guard against acid spills and sunburn for renderers Then I get phone calls asking why’s there no one onsite on boiling hot days 27 managers in the office on one housing site that we are doing The job has lost 2 million so far site manager and under site manager have been promoted There running newbuild sites like dangerous inner city jobs where the rates are three times higher move to go round doing safety checks of all scaffolding and hop ups benches Daily Then ticket them all This is what pushes costs up
  11. It has But it’s gone to far now Long trousers in 30 degree heat is ridiculous Daily safety inspections of 300 mil hop ups It’s a whole new industry
  12. Respirators apparently don’t work unless clean shaven I wouldn’t mind the battery operated helmets I’ve purchased have a picture of a guy with a beard on the front Rules are Rules There talking about hi viz trousers for everyone next
  13. I’ve been on sites for the last so years The guys on sites are absolutely fine But as with other industries HSE is killing the job I been asked Told Only to send clean shaven trades to site On a site we’ve just started
  14. You’ve paid the premium for high end Get the company back It May be a quick simple fix They will take the offending door out and see what’s going on
  15. You may not need the extra space But as always with me From a cost perspective Taking the single story room up to full height will cost you Pennie’s in the grand scheme of things We all have moans about what we should have done once complete But I can’t remember anyone complaining over building something to big Look good and uncomplicated to build
  16. My initial thoughts where that I would use a mobile hub But the little mini hub is better than our landline bt at our old place So I was presuming that a permanent hub would perform at least as good Thanks to all for the info 👍
  17. You must of had an except able sap when you applied for planning What has changed
  18. Yeah Ive a mate who fits aerials He said the same We have four massive masts about a mile away which May of helped
  19. Thanks Dave Im surprised that the Temporary dongle has worked so well Ill shop around
  20. Also you need to add in maintenance and repair costs Like anything Things break and wear out
  21. We’ve had a line booked for a couple of months BT seem quite reluctant and seem to be steering us towards a wireless hub We have a BT temporary minu hub Which seem to run ok Has anyone any experience of the mobile hubs ?
  22. We’ve had a line booked for a couple of months BT seem quite reluctant and seem to be steering us towards a wireless hub We have a BT temporary minu hub Which seem to run ok Has anyone any experience of the mobile hubs ?
  23. I vaulted three cielings on ours and went with what know 8x4 timber ridge Easy to fix to You would be suprised how little weight it actually holds
  24. I’ve been supplying and fitting them on one site for three years Skim over and forget about them 0 patching
×
×