Is a requirement to have a separate certificate for the EV charger Our Electrian wasn’t sure
-
We self funded The plots where a strange one A friend had two plots and a field We gave him 150 per plot and 50 for the field Weve since been offered 275 for the remaining plot It was over lockdown and with talk of a massive 1920s type recession He jumped at it He actually owns a Groundwork’s company and loaned me the plant to do the build
-
Bulk water needed, cost advice please
nod replied to Post and beam's topic in General Self Build & DIY Discussion
I’m not sure about your area tanker with 2500 liters is £150 delivered -
-
If you do the Inevitable and replace Dont share Do two separate TPs Shared is a nightmare I so the title and chuckled I’ve a TP to replace for a neighbor 8k He’s still clinging to the hope that he can simply upgrade I said right I’ve a friend who has been installing TPs for over 40 years I’ll get him down He looked at the inlet outlet Turned to him and said It’s Fu**ed Got in his pickup and went
-
No The Cil is so straightforward Fill the form in Wait for an email and that’s it The only way you can breech it is by selling your house before the three years There not there to catch you out Just to make sure developers pay what is due
-
There’s no such agreement needed The Cil is very clear If you sell the house within three years of sign off You pay the Cil If you are still living there after three years The cil is discharged Tell him you are fine and will do what everyone else does
-
He’s right We are on a HP with UFH and gas with UFH last time The UFH is so slow to heat up and down that timers are not really practical We have the same temperature set throughout the year
-
Grid switch position - can it go in a small cupboard?
nod replied to Del-inquent's topic in Electrics - Kitchen & Bathroom
-
I’m currently doing the plastering and rendering on a small site of self builders While TF are much quicker to get watertight I’m reliably informed that it’s working out about 30% ish more for TF to watertight After that the costs for materials and labour are the same It’s personal choice
-
I think I would re measure
-
Just a case of going direct to the supplier Many that advertise concrete will buy from a quarry Then add £20 per cube
-
Plus 1 Ive an account at a local quarry Currently £106
-
Anytime
-
lead directly on the paper Then curl the edge of the membrane under the slate
-
Directly onto your timber valley
-
They seem to make the rules up as they go along There’s nothing to stop you contacting directly What’s the worse that can happen