Week 40 - We’ve moved in!


Yes, we moved into our new house on Monday last week, pretty much 9 months to the day since we broke ground and 15 months after we purchased the plot.

 

We know we’ve been very lucky with our build.  The weather has generally been in our favour and we had no supply issues or delays.  Above all, we’ve had some excellent people working for us without whom we could not have achieved the build.  There are too many stars to mention here but if you look through the blog you will see them all get a shout out for their excellent work as it happened.

 

Ahead of the move, Mrs P. did a superhuman job getting everything packed, and the move itself went relatively smoothly, with dry weather and no mishaps.  Amazingly, Mrs P. also managed to unpack most of those boxes within a few days, though we do still have some residual boxes to deal with in due course.

 

Moving in day:

image.thumb.jpeg.674e6ef6b848e201644bad5a0ed287ea.jpeg

 

As we all know, moving house is always a stressful business and moving to a new house is no different.  But it is a relief to finally get in - there is always the nagging fear that some disaster will strike at the last minute while the house remains unoccupied. But of course, all was fine.

 

Is our build complete?  Not quite.  We have some minor electrical and joinery items outstanding, both inside and outside; we have the garden landscaping well under way but some distance from completion as you will see from the photos below.  Beyond that, there is a list of jobs of the sort you’ll have following any house move: curtains, blinds, wardrobes, shelving, etc. - but these are ‘house move’ rather than ‘house build’ tasks imo.

 

We do still have to obtain Building Control sign-off and there’s a VAT reclaim to do.  On the BC front we had our ‘As Built’ air-tightness test performed by Richard Harris of Peninsular Energy Compliance this week (highly recommended). The result is 1.16m m3/m2 at 50hPa on the envelope basis.  Virtually the same figure for Air Changes per Hour , as our envelope area is 583m2 and our volume is coincidentally 580m3.  We are very happy with 1.2 ACH

 

Air-tightness test under way:

image.thumb.jpeg.b59723d16c28cd348cb68daa5375e706.jpeg

 

We have been in the house for a week now and we are really happy with the way it feels and works for us.  It’s warm, draft-free, well-lit, quiet, and comfortable; the layout and spaces are working just as we hoped. We are both sure we are going to really love living here.  The plant room is (to me) surprisingly warm, running at 25-26 deg C due presumably to the amount of heat-generating equipment in there.  I raised this as a separate Build Hub topic but the consensus seems to be that it's not an issue, so I shan't worry. As a side benefit, it does make a splendid clothes airing room. https://forum.buildhub.org.uk/topic/46744-hot-plant-room/

 

Energy use

The combination of solar panels, batteries, ASHP and insulation levels seems to be working well - in our first week we used 0.7kWh from the grid and exported 63kWh.  Not bad for February.  I need to work out our best tariff option but that’s a job for the future.

 

 

Enough talk, time for some more photos (some taken just before we moved in)...

 

Kitchen/dining/lounge:

IMG_3232.thumb.jpeg.5123fe003ee33e3b8dd6979105f017d3.jpeg

 

IMG_3233.thumb.jpeg.f6247f791503d4b3aeb57cac8fd5be98.jpeg

 

IMG_3226.thumb.jpeg.5986173cd0d33605abae5cbe04c854eb.jpeg

 

IMG_3236.thumb.jpeg.9d5f9addc31d3c53d2c77ccdef1307c7.jpeg

 

IMG_3261.thumb.jpeg.631a03588fc2f44cc766b2a02e7820b6.jpeg

 

IMG_3289.thumb.jpeg.1db920138a67e546a5a3d2e2d3e5efe6.jpeg

 

IMG_3345.thumb.jpeg.9d7b3c30a66c38cc101b794f09a9493a.jpeg

 

IMG_3244.thumb.jpeg.ee00403a5e1ecf9be4831149f47e2d2b.jpeg

 

IMG_3245.thumb.jpeg.716770b802f50f8bc04adeb9cc951f46.jpeg

 

IMG_3344.thumb.jpeg.f87c53d6637ae0907e3060e98d42a7ae.jpeg

 

IMG_3351.thumb.jpeg.8e893ca018978f847594ea87430ddf24.jpeg

 

Hall:

IMG_3355.thumb.jpeg.0a0c442cd3def7e4a7354d8eb5bc651f.jpeg

 

Bathrooms - master ensuite:

IMG_3347.thumb.jpeg.33e155223c7d0251ad075bd96cd8f6b6.jpeg

 

IMG_3348.thumb.jpeg.55e61b74f318c8b1aa95738aa7528dee.jpeg

 

Shower room:

IMG_3352.thumb.jpeg.a6987d51a7d503b0df5ae1686f0a8cfa.jpeg

 

IMG_3353.thumb.jpeg.681d2fc581fe071ee010a5b13be6572d.jpeg

 

Guest ensuite:

IMG_3287.thumb.jpeg.4ccab30b0456cab0bf9b7f90828e91e5.jpeg

 

Bedrooms

Master bedroom:

IMG_3291.thumb.jpeg.6be6a6a5d164f4d1449ff4f660af5269.jpeg

 

Guest bedroom:

IMG_3267.thumb.jpeg.6eb944cc14f7b18b07fe7af62fa60fcb.jpeg

 

IMG_3266.thumb.jpeg.25a9d6a9a4a672650fcd0875cbe665d6.jpeg

 

Bed 3 / hobby room (Ok, so we still have some unpacking to do.)

3E63D4CD-B48B-464F-B134-B23E2E7E10F5.thumb.jpg.c37058f8fb07c7434491e8d5b9befd1d.jpg

 

Landscaping - plenty to do yet. The layout is literally as clear as mud to me... I'm sure it will all be fine in the end(!)

IMG_4344.thumb.jpeg.1ec9a542c6ba77831e19429ddbb67a5e.jpeg

 

IMG_4341.thumb.jpeg.04d72de1ae2127c1d4de7b5350f259ee.jpeg

 

IMG_4353.thumb.jpeg.6ffd4037c0836b29ae2d93f7c327d5aa.jpeg

 

IMG_4352.thumb.jpeg.aecca406210a6f915c3a8372cbdb7721.jpeg

 

IMG_4351.thumb.jpeg.a6baf4b2bab88934b026870edae70b74.jpeg

 

And finally...

 

Troy likes the new house - it still has yogurt pots that need licking out

IMG_3350.thumb.jpeg.88034d5676e93da86810ab53bea01376.jpeg

 

Dashboard:

Contractor days on site this past two weeks: 15

Contractor days on site since build start: 587 person days

 

That 587 days is well over the 500 days which requires HSE being notified of the build using form F10 (which we did).  HSE have not spoken to us or troubled us at all and the F10 notification is simple and costs nothing, so I would recommend any self-builder do so - if you are unfortunate and have an incident it’s surely means less chance of getting into hot water if you registered properly.

 

Budget:

I confess that in the final weeks we have gone a bit beyond our self-imposed budget contingency and dipped slightly into savings, but that is really down to choices we have made about the quality of the fit, e.g joinery, kitchen, bathroom equipment etc., and also the extent of the landscaping we have chosen to do.  We could probably have remained well within contingency had we needed to but luckily we had some leeway.

 

Plan: We did it!

 

Conclusion: 

Overall, we set out to use the entire proceeds of our previous house sale to buy a plot and build a better house, and we believe we have achieved that.  

 

Thanks once again to all the dedicated and skilled people who have worked on our house and made the build a success.  

 

Especial thanks to Mrs P. who indulged my yearning to do a build provided brilliant design input and kept the whole show on the road throughout - a truly wonderful person!

 

That then dear friends is the final blog!

 

Thank you for following us and for your kind words of encouragement and support through our project.

 

IMG_3340.thumb.jpeg.dbc4b9d83d23051c80b7afb2b8e5cba1.jpeg

 

  • Like 6

3 Comments


Recommended Comments

-rick-

Posted

Congratulations. This has been a masterclass in successful self building by managing contractors!

 

Quote

Above all, we’ve had some excellent people working for us without whom we could not have achieved the build. 

 

More important than that is the contractor selection, project management, etc, and I think it's you (with assist from Mrs P) that has done that so you can feel great satisfaction with how this project has gone. I'm guessing (maybe you said before) your background is in project management and if not it's an even greater achievement.

 

When you have time and if you have the energy I and I'm sure many others on here would appreciate it if you could share as much as you can on your process for managing this project. What your average day looked like, tips and tricks, preparation, etc. I think this could be really useful for those of us with less project management experience!

  • Like 2
G and J

Posted

Congratulations and thank you for documenting the project. I have said before we are behind you (now more than a couple of weeks!) but your project has been a touchstone for keeping the faith that we are on the 'right lines'.

 

There is always an element of luck in these things, but often we enhance the luck we are offered, and I think you have both demonstrated that.

 

Wishing you many happy years in your new home.

 

 

  • Like 1
Selfbuildsarah

Posted

Looks fabulous. Kitchen and doors look particularly fab! Well done to Mrs P on the doors 😊 Hope you absolutely love living there.

  • Like 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...