Onoff Posted February 7, 2021 Author Posted February 7, 2021 (edited) Finally found the plan I started of the house and existing CH pipe run. Oil boiler is bottom right. Down to 4 different floor levels from 5 originally! ? Under the stairs seems the best place for the UFH manifold imho. 7 different floor make ups at the moment. I took out the single pipe CH that skirted the D'stairs Bathroom. It now runs across the stairs room, right to left, then up the Hall where it reconnects behind the cloak WC. Drawing needs work! Done originally in Drafsight so I need to redo in AutoCAD if I want to start extruding walls up etc to make a model: Edited February 7, 2021 by Onoff
Pocster Posted February 7, 2021 Posted February 7, 2021 You’ve been ‘ gearing up ‘ since January 2019 !! ???
joe90 Posted February 7, 2021 Posted February 7, 2021 16 minutes ago, pocster said: You’ve been ‘ gearing up ‘ since January 2019 !! ??? You can’t rush these things (and he sure doesn’t ?). 1
Gav_P Posted February 7, 2021 Posted February 7, 2021 How’s that cupboard coming along? Have you done the temporary plumbing for the bathroom UFH? What about the en-suite /tool room ? Do you managed to get the hall floor up? Any power to the gates yet? ? 1
Pocster Posted February 7, 2021 Posted February 7, 2021 9 minutes ago, Gav_P said: How’s that cupboard coming along? Have you done the temporary plumbing for the bathroom UFH? What about the en-suite /tool room ? Do you managed to get the hall floor up? Any power to the gates yet? ? No no no no and no I think that answers your questions 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now