February 7, 20215 yr Author Finally found the plan I started of the house and existing CH pipe run. Oil boiler is bottom right. Down to 4 different floor levels from 5 originally! ? Under the stairs seems the best place for the UFH manifold imho. 7 different floor make ups at the moment. I took out the single pipe CH that skirted the D'stairs Bathroom. It now runs across the stairs room, right to left, then up the Hall where it reconnects behind the cloak WC. Drawing needs work! Done originally in Drafsight so I need to redo in AutoCAD if I want to start extruding walls up etc to make a model: Edited February 7, 20215 yr by Onoff
February 7, 20215 yr 16 minutes ago, pocster said: You’ve been ‘ gearing up ‘ since January 2019 !! ??? You can’t rush these things (and he sure doesn’t ?).
February 7, 20215 yr How’s that cupboard coming along? Have you done the temporary plumbing for the bathroom UFH? What about the en-suite /tool room ? Do you managed to get the hall floor up? Any power to the gates yet? ?
February 7, 20215 yr 9 minutes ago, Gav_P said: How’s that cupboard coming along? Have you done the temporary plumbing for the bathroom UFH? What about the en-suite /tool room ? Do you managed to get the hall floor up? Any power to the gates yet? ? No no no no and no I think that answers your questions
Create an account or sign in to comment