Our timber frame is nearly up and we have a roofer and builder lined up for external work. I don’t think our roofer is familiar with airtight, timber frame or our builder 😬 We have been advised to use ProClima Roflex gasket and Tescon Vana tape to seal soil stack. Apologies if this is a silly question (mine usually are) but is this for penetration through the roof tiles or lower or both? Should we also be using a special flashing? Our roofing will be Danum TLE system. We are going to have to explain this clearly to roofer and builder this morning!

Posted

Would it be possible to run a soil stack up the side of the house? We did this to avoid having a penetration through the roof.

 

All internal soil locations have air vents. The external one runs vertically parallel to a downpipe, so isn't too out of place. It connects to the sump where all the internal ones come together.

Posted (edited)

Thanks Branco. We did think about this. We will have a further chat with builder this morning.

Presumably we will have to get the OK with building control first if we choose to do that?

Edited by Selfbuildsarah
Omission
Posted

Where is your technical drawing showing the location of your airtight layer. 
is it showing the vcl at ceiling level or roof level. 
you need to imagine and show the roofer/ builder an image of a continuous line around the whole property with no gaps or breaks in it. 
from ground floor to roofline a continuous air barrier. 

  • Like 1
Posted
6 hours ago, Selfbuildsarah said:

Thanks Branco. We did think about this. We will have a further chat with builder this morning.

Presumably we will have to get the OK with building control first if we choose to do that?

Building control actually came up with the solution!!

Posted
3 hours ago, Selfbuildsarah said:

Just spoken to Brendan from MBC on site and he’s reassured us all taping including soil pipe will be done by MBC so we will stick with the one plus AAVs 👍

I should have said ours was an MBC build. But we'd already decided we didn't like/trust the idea of a soil pipe through the roof structure. Getting the taping right on 2 membranes at an angle seemed like a recipe for future problems.

Posted
44 minutes ago, Bramco said:

I should have said ours was an MBC build. But we'd already decided we didn't like/trust the idea of a soil pipe through the roof structure. Getting the taping right on 2 membranes at an angle seemed like a recipe for future problems.

Not an issue tbh.

 

5EC87485-9DAA-454D-B4F7-D10193A5A946.thumb.jpeg.a1616d1b67942258298adb85f3a2e333.jpeg

 

IMG_3220.thumb.jpeg.be3dd4afd3e7092b0c336e64d21a4fef.jpeg

 

IMG_3224.thumb.jpeg.4bfa4a5328f3258e2203d44406203603.jpeg

 

IMG_3221.thumb.jpeg.28bdf397feb52d909fa761c8051caf36.jpeg

 

I taped and foamed these to within an inch of their lives. Airtightness score was 0.1ACH on test, so a safe 0.2ACH which I will take allllllll day long.

 

It’s not what you have to tape, it’s who you’ve got, or knowledge and methodology if DIY’ing.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...