Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Critique my quotes.. - here we go

Featured Replies

17 hours ago, James94 said:

i was under the impression that there was only one way that everyone did 25mm pir and then the edge strip, mines from wunda 8mm and about to start this job.

Edge strip insulation by JGUHEDGE or similar approved - My builder used this, the architect specified 25mm PIR. This thin insulation creates a bad cold bridge.

 

i am doing this job now too, i have done a 25mm PIR insulation, but i think that the foam around the edge is for expansion, not for the insulation, and goes in after the VCL membrane

 

Underfloor Heating and Screed | Professional Advice

  • Replies 54
  • Views 8.8k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • On the topic of balance, what I've gathered from this forum and talking to a lot of other professionals is a fabric first approach. Invest in the building blocks and these will add value to the place

  • HI @puntloos i think the answer to this question is less about the quality of what you are building and more to do with how you are choosing to build it , so for context.  Our build is also 300m2

  • Moonshine
    Moonshine

    A couple of things stand out to me on the floor build up     123) The materials for this (DPM + joining tape) is probably ~£150, and not a massive job to lay a plastic sheet down and

Posted Images

4 hours ago, puntloos said:

Quick update on this one - so indeed this is lighting design + supply (20K) and the rest - sockets, cables, switches - 10K. 

It excludes alarm/cameras so as before I'd love to see an actual quote but it's not unreasonable I think

If you think it will help 👍

Elec.pdf

22 hours ago, James94 said:

Just read this bit and would like to ask what the best materials to use, i was under the impression that there was only one way that everyone did 25mm pir and then the edge strip, mines from wunda 8mm and about to start this job.

Edge strip insulation by JGUHEDGE or similar approved - My builder used this, the architect specified 25mm PIR. This thin insulation creates a bad cold bridge.

Regards  James

 

Historically builders just used the 8mm strip. You need the PIR too to reduce cold bridging

7 hours ago, puntloos said:

Quick update on this one - so indeed this is lighting design + supply (20K) and the rest - sockets, cables, switches - 10K. 

It excludes alarm/cameras so as before I'd love to see an actual quote but it's not unreasonable I think

sorry, missed the previous reply, no cost sheet as nothing has been costed since we started, quote was sent as a text, difference could be down to location as at 10k plus alarm and cameras it's not a million miles away.

Thanks I understand now, can anyone recommend any tapes to use I was looking at the one on Screwfix(713fr) but not sure if ok to use for all dpm joints.

Regards. James

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.