Post liquid screed pour treatment - sanding?


readiescards

Recommended Posts

What tips/advice for post treatment of liquid screed please? (Done by ScreedIt using locally sourced screed mix)

 

A google suggestions:

http://www.bal-adhesives.com/tiling-onto-calcium-sulfate-anhydrite-screeds/

 

Laitance should be removed by light abrasion using a suitable sanding machine i.e. a rotary floor scarifier and a 60’s grit sandpaper. Remove excess dust completely with a vacuum cleaner. Abrading the surface is best carried out 4-6 days after the application of the screed and can assist in the drying out process. Scarifying the surface is even recommended with low laitance Calcium Sulfate/anhydrite screeds as this further aids adhesion.

 

 

Anyone done this, anyone done any different?  Any tips much appreciated

20170311_092719 - Copy.jpg

Link to comment
Share on other sites

40 minutes ago, readiescards said:

And do I need to protect the screed prior to the final floor covering going down?

 

Only from wet trades mixing mortar directly on it ..... ask me how I know that ..!!

 

 

  • Like 1
Link to comment
Share on other sites

As a little tip, we brought an old vax for £20 and used it to clean the entire slab before our carpets went down, it worked really well and removed all the dust and plaster splashes, everyone thought I was mad at time but was well worth the day I spent doing it.

  • Like 2
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...