Jump to content

Spantherm


Judy C

Recommended Posts

6 minutes ago, Big Jimbo said:

That is going to be a few bob then.


Surprisingly, a managed lift isn’t that expensive. It’s around a 2 hour job by the looks of it and the pieces aren’t that heavy or large, so it would be within the reach of a 10 tonner so you could be talking £1.5-2k for that.  

Link to comment
Share on other sites

2 hours ago, jamiehamy said:

They didn't bother providing me with a quotation when I tried. Too small a job probably. 

 

I have had similar with wide plank concrete where 400m2 was too small for them.  I guess it depends how busy they are.

 

I saw on their video they were using a hiab to install them.  They look lightweight compared to the hollowcore.

Link to comment
Share on other sites

Loadbearing walls are built off a sleeper wall under the concrete slabs, I think some can be built without a sleeper wall - these are designed in as part of the process.

Still not had a quote so it might be academic anyway!

 

 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...