Jump to content

Recommended Posts

Posted
2 hours ago, joe90 said:

so he can be on the forum whilst having a bath!

To update his profile picture.

 

2 hours ago, pocster said:

Cable is a cat5 for bathroom iPad obviously

I think we all know it is for a webcam.

  • Thanks 1
Posted
On 12/12/2020 at 14:05, pocster said:

Right @Mr Punter I’ve got the offending tile off . But I do know from experience getting the adhesive off will just destroy the delta board . What’s the best option here ? ( spoil sport ! ) 

78A4D8B9-9CBB-48E8-A74D-4681E5D60B20.jpeg

 

Right first time...

  • Like 1
Posted
On 12/12/2020 at 13:12, pocster said:

Super happy today !

With SWMBO’s smaller hands and greater flexibility plumbed the bath waste in ! . Lowered it - filled it - let it drain .

No leaks ??

CD509FCC-C7C1-47D8-A5A8-CE3A9064B043.jpeg

 

Why does that entire wall look like Sam the Eagle from the Muppets?

 

28982-samtheeagle.png?w=303&h=273

  • Like 1
Posted
56 minutes ago, pocster said:

Assume this is better . Nothing fixed yet . Guessing these geberit pipes go here ?

AD2BCD0F-489E-48C3-8CC3-CFC384A88A30.jpeg

 

A bit of silicone grease is your friend on those pipes and round the rubber. 

Posted
5 minutes ago, Onoff said:

 

A bit of silicone grease is your friend on those pipes and round the rubber. 

Sure thing. I was just checking it's all correct. Tiles not even stuck back on the wall yet....

Posted
34 minutes ago, pocster said:

Sure thing. I was just checking it's all correct. Tiles not even stuck back on the wall yet....

 

You've time to re do that one with the double hole in then! ?

  • Haha 1
Posted
13 minutes ago, Onoff said:

 

You've time to re do that one with the double hole in then! ?

Ssshhhh don’t add to the list of jobs... I’m getting fed up with the never ending  saga... god knows how he’s coping! 

  • Haha 1
Posted
8 minutes ago, Gav_P said:

Ssshhhh don’t add to the list of jobs... I’m getting fed up with the never ending  saga

 

Taking ages to finish is considered a good thing in some circles...

  • Haha 1
Posted
14 minutes ago, Gav_P said:

Ssshhhh don’t add to the list of jobs... I’m getting fed up with the never ending  saga... god knows how he’s coping! 

Saga? - you've obviously been spared @Onoff 's biblical bathroom thread. We are only at 50 pages here. I think @Gav_P ; you need to read it and get caught up with true Saga's. ?

Posted
1 minute ago, Onoff said:

 

Taking ages to finish is considered a good thing in some circles...

Possibly, but in most cases it’s better to finish before dying of old age... I feel @pocsters and you bathrooms are both going to take longer than the coliseum to build! 

  • Haha 2
Posted
1 minute ago, pocster said:

Saga? - you've obviously been spared @Onoff 's biblical bathroom thread. We are only at 50 pages here. I think @Gav_P ; you need to read it and get caught up with true Saga's. ?

Haha.. I don’t have the strength. 

  • Like 1
Posted
2 hours ago, pocster said:

Right 2nd time ( hopefully ) ??

would it not be prudent to tile the floor before you fix that tile? ?

Posted
14 minutes ago, joe90 said:

would it not be prudent to tile the floor before you fix that tile? ?

Why’s that ? . I was going to start on the floor anyway but only because I’m still waiting on the wall tiles to arrive .

Posted
22 minutes ago, Gav_P said:

Haha.. I don’t have the strength. 

Go on ! It’s like War and Peace - but even more boring . I’d also like to point out in the time it took @Onoff to do his bathroom I built an entire house ; so I’m ninja fast !!

  • Haha 1
Posted
4 minutes ago, pocster said:

Go on ! It’s like War and Peace - but even more boring . I’d also like to point out in the time it took @Onoff to do his bathroom I built an entire house ; so I’m ninja fast !!


(But it’s not finished yet or had you not noticed?)

  • Like 1
Posted (edited)
1 minute ago, joe90 said:


(But it’s not finished yet or had you not noticed?)

It will never be finished . I mean (expletive deleted) me still no heating in there - assume you meant @Onoff ?????

Edited by pocster
  • Haha 1
Posted
11 minutes ago, joe90 said:


NO !

Go (expletive deleted) one then ! . I let you enter my perfect humble hole and you just leave a grubby deposit .

  • Haha 1
Posted
2 hours ago, Gav_P said:

Possibly, but in most cases it’s better to finish before dying of old age... I feel @pocsters and you bathrooms are both going to take longer than the coliseum to build! 

 

I  think that one's gone.

 

According to historians, the Colisseum was finished in 8 years.

https://www.pbs.org/wgbh/nova/colosseum/qanda/#:~:text=Answer%3A Between seven and eight,said to have been slaughtered.

 

@Onoff's boudoir took longer already.

 

  • Haha 1
Posted

Though I notice that the floor tile grout lines cannot match the wall lines . Out quite a bit on one side of the room . I assume have one side line up and the other not ;would look wrong . If I shift it along a bit then none will line up on either side - this better ??

63674416-6A59-4702-B26C-D3A5B5D2EDF7.jpeg

D0D9413D-C28B-45EA-9134-5B56E320A621.jpeg

Posted

While I debate what to do ( though assume shifting the whole floor up so no line up with wall grout lines is best ) 

Bought some of these ‘corner’ spacers to go with the wedge system . 
Just feel happier knowing the corners are level . 

image.jpg

image.jpg

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...