  1. >>> The only way applicants and/or agents can obtain informal advice from an LPA is via a Pre-application enquiry. Depends on the LPA. Some will be old school and talk, some will do everything to avoid that - even if you submit formal applications. And some will be in between. @johndeere - which LPA is it?
  2. The ones that work with Velux preferably - both horizontal and vertical in portrait if anyone knows. Yeah, here's the 'simple' table...anyone figured this out? I'm trying to lay out a block of veluxes and PV on the roof, of course, between some other stuff...
  3. £100K - there's some numbers here on BH somewhere - err, search for 'basement'. I can't remember whether that's the incremental cost or the whole caboodle. >>> such as ground type Actually, that could make a big difference - if you're on soft clay and going to have to dig deep foundations anyway, then the incremental cost for the basement will be less. If you're on hard rock...you get the idea. p.s. I see I have 1.2 £K/m^2 as a rough number from one of the threads here.
  4. >>> Just submit the application and see what the LPA say. Left to their own devices, the LPA may just repeat whatever guff they had in the original '80s permission. Hence, I think it's best to try and get some informal engagement with the case officer if possible with the argument that time and PD have moved on since then.
  5. FYI I submitted a removal of condition application for £234 in October. In any case you want to maximise your chances of success, so it’s probably worth trying to engage with the LPA if you can.
  6. Hi Gary, the J Harris spreadsheet is good. I'm sure you will have the surface areas right but it might be worth checking the U-Values as 2.5 total seems a bit low. You can do a quick double check by taking the main insulation material thickness and ignoring the rest. Or you can put the whole stack-up (or just the bit that is actually doing insulation) into ubakus to get a bit more accuracy. You have some feel for your air tightness and your DHW need? Then assume the other thermal leaks roughly net out with the other misc gains from people / always on equipment etc and you won't be far wrong. Another way of double checking is to put a 3kW fan heater in there when its pretty cold outside and see whether it can bring the temperature up to something reasonable within say 1/2 a day.
  7. A. One professional to tell you how to do it. Then 6 other people to talk about CDM, thermal bridging, decrement delay, weather compensation, brexit, air tightness, the low standard of contractors today, J Harris's spreadsheet, Loxone, Wagner sprayers and a few other unrelated subjects. Finally ... 2 or 3 more just treating the whole thing as a joke
  8. Actually this approach gives your 4 attempts at getting planning for your project - removal of PD condition + appeal, then full planning + appeal.
  9. Probably just fibre cement board - the flakes are usually wood or cellulose.
  10. How many Buildhub members does it take to change a light bulb?
  11. Oh yeah I see - I found the language a bit confusing… Another option is to apply to remove the condition. Worth a shot since v easy and quick to do - probably citing modern garage conversion PD rules. Also , if the LPA is going to dig its heels in, then it’ll probably do so both for removal of the condition and also for a full application. An informal call if it’s one of the LPAs that still talks to its customers?
  12. Yeah you can do it yourself. Read the LPA’s ‘validation requirements’ to avoid going back and forth. Be prepared to deal with a little BS in good humour. Is garage conversion not already permitted development?
  13. Double check the actual water pressure & flow at the location with something like this https://www.screwfix.com/p/monument-tools-water-flow-cup-weir-gauge/5784k https://www.screwfix.com/p/monument-tools-mains-water-pressure-test-gauge-11bar/82412 If that's OK, there's probably a tiny leak somewhere. Check all the bleed valves for a start and all the radiator entry / exit points for signs of water. A paper tissue will give a good indication of a tiny leak. You can re-pressure yourself if you're careful, but it'll happen again if the leak isn't found. Anything changed / happen about the time the problem started?
  14. Yeah dumb with a smart overlay for me that can be overridden / upgraded easily. That means proper wiring with neutrals everywhere and cat 6 with PoE everywhere. Proper switches. By all means wire everything back radially so it can be 'smart'.
  15. Welcome, you might want to give an indication where you are based.
  16. Huh, interesting - another school day for me Anyone have any practical experience with these? I see the roof light opens upwards as usual and the window opens inwards. Oddly this set-up is not really highlighted on Velux's own web site. Is the joining trim thingy thermally efficient? FYI on Velux's web site, I see there's also these somewhat odd roof terrace options: https://www.velux.co.uk/products/roof-balcony-and-terrace/roof-terrace? I have actually seen these balcony versions installed: https://www.velux.co.uk/products/roof-balcony-and-terrace/roof-balcony
  17. This is from a planning application I just saw - anyone know how this 'standard window / roof light' thing works?
  18. >>> Both end elevations have miss aligned windows - it look wrong and badly thought out. Actually sometimes I see mad mis-aligned windows in old buildings and think how charming that is. >>> The PV may look better if it is in a single block. I note it is not included at all in the current plans and elevations. I've mostly seen no PV in planning applications - I think that may be 'a thing' to make the building appear neater.
  19. >>> copy some elements (proportions etc) of the rear elevation OK suggest: (1) make the front gables similar size and proportions to the back ones. This gets rid of the front bays, gives you a bit more space, makes the build easier & cheaper and gets a similar contemporary look to the back. (2) make the front door two parts rather than three, with the door on one side and a similarly spaced window on the other. (3) replace the slopey front porch with a simple flat horizontal number. (4) maybe make the window above the front door into dual inward opening doors with a Juliet balcony for through ventilation. (5) make the front windows similar proportions to the back. (6) maybe make the bathroom windows have a higher cill than the others though as a privacy thing. I'm not a fan either of the slightly asymmetrical back/front gables - I would rather have them the same size (less hassle to build) or a more pronounced asymmetry. That's a matter of taste though.
  20. OK in that case I would just 'follow my nose' matching up the connectors and yellow and green cable/pcb markings (see images below). 7 out of 8 seem pretty obvious - there's probably yellow and green marked on the other sockets on the unit too. The only one I can't figure is the power cable - that might be more obvious to you with them in your hands. Maybe photograph both ends (pcb & unit body connections) of the old set-up. And the new set-up before powering on and post here.
  21. Yeah as an electronics guy … I suggest asking for the whole unit to be replaced. It’s not your fault that they have completely redesigned the pcb with no thought to upward compatibility. The fact they have an ‘upgrade kit’ with all the adapter cables suggests a major design fault and that lots of these units are failing in the field. Or ask for you money back and buy a different brand.
  22. Yeah we have a Stuart Turner dual flow pump (pumps both hot and cold) after the tank for this reason and it works well and has been going for 30 years. Ask the landlord to pay? You would want to ditch the shower pump also then.
  23. It’s your surveyor’s and solicitor’s job to point out potential problems to you, however minor. With their advice, you then make the decision how important those outstanding issues are. By all means get a formal statement from the sellers that the modifications were in the long distant past. Produce that, if needed, in 8 years time when you sell. Otherwise, I would suggest that all house purchase involves some risk (e.g. dodgy neighbours) which you can do little about. *Life* is risky and you can’t remove all risk from your life - even with the best solicitors and insurance. For new houses, NHBC certificates generally only last 10 years (because you can’t guarantee a house for ever, and at some point you have to say ‘this house doesn’t have any major structural problems’). Expecting to cover structural problems after more than 10 years with any house purchase is a little fanciful. Take a view, get the letter from their solicitors, and move on.
×
×