Jump to content

MortarThePoint

Members
  • Posts

    2168
  • Joined

  • Last visited

Everything posted by MortarThePoint

  1. What flow temperature do people use to cool their UFH? I'd imagine wanting to use a higher temperature (to avoid condensation) than an air blower would need.
  2. Those are around 1.4 kPa of screed weight.
  3. I agree and the leakage is what will allow it to 'breath' and push air in and out of the living area. Yes, it's nothing. I'd prefer that to the air going in and out.
  4. But unless there is a sealant, it's going to leak out. If not, it would raise the floor by approximately (1/20) * 25ml / 7cm * 7cm = 1/40 mm which is admittedly tiny, but probably enough to open up an air leak to release the pressure.
  5. I hate working this sort of thing out as sometimes ignorance is bliss. For a gas, pressure (P) is proportional to temperature (T) in Kelvin for a closed volume. Therefore if there is a dT there is a resulting dP. With the UFH off for some time the floor will be at the same temperature as the room. With it on, the temperature will rise above the room temperature by dT (e.g. rising to 36C giving dT=15C=15K). That's going to create a pressure difference of dP = (15/300) * 1Atm = 1/20 Atm = 5kPa in any air trapped below the floor. The weight of 50mm thick screed is around 2.4kg/m3 * 0.05m * 10N/kg = 1.2kPa. Presuming a continuous air gap under the screed that would lift the screed if it didn't leak out, so it will leak out. That's tiny you'll think, but most castellated panels increase the volume of air involved greatly. The volume of the castellation and ridge per unit cell is probably around 25ml (a shot glass) per 70mm x 70mm unit cell, so 5.1l per m2. So, a 20m2 floor will breath 5.1l per cycle. So what? I don't know, but I thought it was interesting. I had planned to glue down my castellated panels, but this makes me think of the air going in and out pushing out any warmed up fumes from the glue. Probably no biggy as the temperatures aren't very high. Has anyone thought about this before? @Nickfromwales you normally like talking sense against this sort of nonsense.
  6. My manifolds are all going to be in cupboards, so is there any point in putting them in manifold cabinets? I can see them being useful if in a rental property (locked) or having the manifold in a room not inside a cupboard. The only reason I can think I could justify using one is to save the manifold getting knocked by someone tossing Henry (or Harry) into the under stairs cupboard. I don't think it would stop spiders of dust. Does it look unprofessional not to have one? What did others do?
  7. So just to be clear glue only, no screws or bolts?
  8. Poor guy, but hopefully he saw the funny side eventually.
  9. I just found this link too: https://www.sunamoon.com/articles/fix-down-toilet-without-screws.htm CT1 looks good. I had a friend you sat on the toilet and it sank through the floor. When he subsequently flushed it went everywhere. All round at a new girlfriend's house. Didn't put her off though as they are now married.
  10. Can a glued down toilet weather the storm?
  11. Unless you're Jim in American Pie
  12. I think I recall someone saying somewhere that they had glued their toilet to the screed rather than bolting it down. This is of interest to me for two reasons: Allows UFH pipes to pass below. In one place I haven't finalised the toilet position Safer over any membranes If glued down, is there any way of getting the toilet unstuck without smashing it if you need to remove it later?
  13. Thanks Markc, Can you recommend a glue for metal Frame? I was worried that the smallest amount of water would cause the galvanising to whiten and I think I recall it being pretty easy to pull that off.
  14. Do you think this would work with a metal frame partition?
  15. Some photos. In the one from above you can just see a line 450mm from the side wall and a second 450mm from the top wall. They mark the edges of the currently proposed UFH layout (green in previous post). The second photo shows a pen X on the wall which is in-line with the waste of the toilet the other side of the wall.
  16. I know all of these sorts of things should be worked out way in advance but... I am struggling with the placement of the loo in our ensuite. There are a few pipes that need to converge to then pass through the concrete slab floor (first floor). 2no. 100mm toilet pipes and 1no. 40mm shower waste. The overall size of the ensuite if 3000mm x 2450mm. The ensuite layout basically comes down to two options shown below. I am laying the UFH (water based) and need to finalise the position as to keep both options alive but than risks cold feet whilst sat on the loo. I can't get the UFH pipes to close too the area where the toilet mounting screws will go as that's a recipe for disaster. I have shown the current UFH planned area in green in the layouts below. I don't think I can extend the pipes to create an area to heat the right foot in the second layout due to the mounting holes of the toilet. I think the second layout would need a T-junction mounted on the rear of the ensuite toilet (see image below of what going in where) and there would be a minor heights issue as the other toilet's waste will need to have dropped due to pipe fall, but I think that's only within tolerance though so should be fine. I'm not sure how I would join the shower waste that's coming through the wall though. I could just send it through the hole in the floor and join lower down which is where the ensuite shower and bath wastes will be joining having passed through their own holes in the floor. I may have to have push the loo away from the wall and have a box that goes as high as the top of the ensuite toilet cisten to buy some space (?) Holes quite forward: https://www.victorianplumbing.co.uk/burlington-close-coupled-wc-ceramic-lever-flush-bur-p5c1 Holes towards the back, perhaps 300mm forward of wall: https://www.victorianplumbing.co.uk/melbourne-ceramic-wc-pan-cistern RED: 110mm soil pipe coming from toilet mounted on other side of wall so at it's exit height. BLUE: 40mm shower waste pipe coming through the wall at a height of "in the screed".
  17. This is Libra: https://www.abcdepot.co.uk/libra-resilient-bar-3000mm.html I bought 100 lengths so that may have helped.
  18. Have a look at abcdepot, but I got it from Travis Perkins
  19. Cool. How did you do joins in the membrane?
  20. @joe90 did you just use duct tape to secure your membrane to the perimeter insulation skirt?
  21. That's right, we certainly have an eye for detail on the things we are aware of. Just to double check, I am just using standard Cloth Duct Tape to tape my edges of the 125um membrane to the perimeter insulation skirt and any joints. I presume that's OK. I am planning to use a liquid screed (either anhydrite of cement based).
  22. Wunda have done an excellent spiral design, so clearly either use different software or a particularly diligent designer.
  23. If you want to fully nerd out on all of this you can check out IR761: https://www.jhbrandt.net/wp-content/uploads/2014/11/ir761.pdf A lot of the other sources of information for timber vs metal frame is subject to conflict of interest as the plasterboard manufacturers produce metal frames. I'm no saying they tell porkies, but there may be a configuration missing. Page 21 (not sheet, page) of IR761 has "Wood studs – 1 layer gypsum board" - STC 34 (90mm studs) Page 28 of IR761 has "Steel studs studs – 1 layer gypsum board" - STC 36 (these are 65mm studs though) Looking through the document can turn in to an amazing game of spot the difference (e.g. page 28 vs page 29) I don't readily see timber studs at 610mm c/c. Basically it looks like if you start from 65mm steel studs at 406 c/c with 13mm plasterboard each side giving around STC 35: Changing 406 c/c to 610 c/c adds about 5 Changing 65mm MF to 90mm MF adds about 5 Changing 13mm to 16mm plasterboard adds about 5 Doubling up plasterboard adds about 5 Adding resilient channel one side adds about 7 (not shown with 610 c/c studs though??) It definitely looks like you can have the insulation too dense (page 46 vs 40)! Some highlights: Page 89: 610 c/c, 90 steel studs, 16mm plasterboard lower density insulation STC 50. Page 93: 610 c/c, 65 steel studs, 13mm plasterboard (double on one side) lower density insulation STC 51. Page 120: 610 c/c, 90 steel studs, 16mm plasterboard (+13mm on one side) lower density insulation STC 55. Page 124: 610 c/c, 65 steel studs. two layers of 13mm plasterboard each side, lower density insulation STC 55. Page 245: 406 c/c, 90 steel studs, two layers of 13mm plasterboard each side, low/medium density insulation STC 60. Page 350: Double timber wall, 610c/c, double layers of 16mm plasterboard, lower density insulation STC 69. Good below 125Hz (e.g. 26.7 @ 50Hz) It's much harder to achieve good performance at lower frequencies (<125Hz). Of interest: Music: Spectrograms are a useful way of seeing the frequency distribution (and as an aside are good for AI like Alexa), Country music may be the worst in more ways than one as it turns out [link]. 'Subs' and 'Kick' are likely to be the most challenging [link] [another link] Snoring: "The fundamental snoring sound frequencies of the tonsil, tongue base, and larynx were approximately 330 Hz, 1000 Hz, and 652 Hz, respectively" [link] Farts: "The data show that most farts predominantly have power in sound frequencies between 200 and 400 Hz" [link ?] Films: Psycho (shrill music and women screaming) probably easier to cope with (if you're not watching it) than Jurassic Park, keep it down T-rex! The insulation side of it is really interesting. Rockwool would have you believe in the acoustic benefits of their denser insulation which doesn't fit the data. Insulation G1 is good and has a density of around 12kg/m3 and air resistivity of ~4000 mks rayls/m (whatever they are).
  24. Playing with LoopCAD and the "Spiral Counterflow" circuit layout setting. It only uses one circuit, whereas for the "Single Serpentine" it allows you to set how many and for the first room I am designing it defaults to 2. That's a nuisance as I'll have to manually divide each room that has more than one circuit and hope to get the areas balanced. Not too bad (see third image) though need to factor in the feed from the door (adds about 2*3m) as It doesn't work to have a narrow pan handle on the area. I haven't balanced the lengths very well below as, once I have added the feeds, they will be about 86m and 92m. That's not too bad, balanced to within 10%.
  25. Staples are cheap as chips. Not chips of wood coated in glue and squished together to form OSB3 though, they're really expensive.
×
×
  • Create New...