PNAmble
Members-
Posts
240 -
Joined
-
Last visited
Everything posted by PNAmble
-
We had nearly turn key solution, they provided the M&P labour but we pretty much managed it, and also managed the kitchen and bathroom and externals. It all went through the books of the builder to help us with cash flow re VAT. Mortgage with Harpenden, and Mayflower as a broker.
-
Probably, ask your mortgage provider. Mine used a very high level builder’s proposal had about 10 line items and I think 4 of those were provisional sums. I was told that all they wanted to know was that you’d thought about it, because the underwriters will make assumptions on your cost of build using industry standard £/sqm irrespective of what you provide them.
-
https://directnine.uk/products/poe-texas-gigabit-poe-splitter-inwall-usb-charging-port-fast-5v-usb-charging-and-rj45-power-over-ethernet-output-for-wifi-internet-router-camera-phone-network?gad_source=1&gbraid=0AAAAAp5BeSog5eB1kb7ZriLjL380rXEor&gclid=CjwKCAjw_4S3BhAAEiwA_64YhkP5X_uZ9rZxzk71r1BQh_tZbIibveTOQIf-5tX3dmE7VD40d2AYSxoCOmcQAvD_BwE Would this work ? not a standard size though..
-
Layout master bedroom/WIC/Ensuite
PNAmble replied to Stonehouse's topic in New House & Self Build Design
Pocket sliding doors work well if you are tight fit space especially in en-suites. Maybe consider for bed 2 and 3. -
I agree with @Bozza , it’s a complex financial transaction and depends on company structure and personal tax situation. You will need good professional advice .
-
a mortgage company will take your last two or three years of accounts and average it; I (limited company) had to wait until my 2nd year accounts had been completed. My partner (sole trader) had to get an accountant to certify her last three years of accounts. They won’t care what you pay yourself. It’s about your business account/ profit.
-
What do you mean a surplus ? Effectively the lender cares about 3 things. 1) affordability 2) the end valuation 3) your ability (risk) to finish with your and their money.
-
a bridging loan is based on valuation not affordability, pretty expensive option. id talk to a broker (recommend mayflower).
-
Yes, and I’m likely to do that. However Mayflower are doing all the running around and looking at the options. There is quite a difference in interest rates between a good mortgage and a self build one. some SB mortgages also have specific ‘drawdown stages’. Harpenden don’t care it’s just based on valuation, depending on your build and finance that could be important.
-
For a broker I can recommend mayflower. We are both self employed, we ended up going Harpenden as they provided a larger lending capability. It took about three months to get it all sorted. You do have to pay a broker cost but in our case it was money well spent and they will also help us convert to a standard mortgage once we get structural warranty signed off. some lenders won’t lend on properties with a flat roof. One thing is that most self build mortgage were over 2 years, ours was built in a year so also look at the ERC terms.
-
My passive standard house doesn’t have a UFH because it’s an upside down house, so a battery, EV , PV and ASHP with low flow rate radiators does work for me across my financial and environmental goals. given that energy prices and how tariffs work will change significantly over the next few years as more dynamic pricing is introduced as opposed to broad TOU tariffs currently in play, I think batteries will become an important element of home energy management along with V2H and V2G. just my opinion.
-
It doesn’t apparently, it’s quite a popular feature request.
-
Yes, absolutely. Almost 100% of my electricity is cheap rate or free (from solar).
-
New self-build project - design method question
PNAmble replied to Benpointer's topic in Surveyors & Architects
We bought with planning. In the end it was someone elses design and no matter how we tweaked it was never going to work - not to mention we really didn’t get on the original architect. start with a blank piece of paper, and assume you’ve just got some land. It is difficult as you’ve probably paid ££ to buy it with the permission. But in the end you’ll need to do all your own reports etc , and whether it’s 1,2,3 years you’ll live the house you designed not something you compromise on. -
We had similar, unless we went with the same architect we couldn’t use the plans, in the end we changed the whole design and went with a different architect. you may want to investigate some of the reports eg site survey, ecologist etc as they are likely to be in either the sellers or architects name and won’t be something you can rely on unless you can get the properly transferred by the original company.
-
What was your as designed SAP ?
-
Buying reconditioned reduced that to £200. But as normal if you are working on airtightness get the externals run the appropriate ducts. two people working from home where I live 4g is too slow and 5g doesn’t exist. id not buy or build a property if it didn’t have fibre or StarLink.
-
Are these numbers ball park please?
PNAmble replied to Post and beam's topic in New House & Structural Warranties
The structural warranty depends on location and rebuild cost. Ours warranty cost was about the same but inspection fee (based on 4 visits) was £2500. we also had to add an insurance backed guarantee for the flat roof - which took quite a while to sort out. -
Useful for interest , but unless transferred to your name by the company have limited use/legality
-
We had a very difficult time re this. The surveys the seller did e.g topographical and ecological and worse the SI, were all done in the name of the architect. The ones in the name of the seller stated that they were for the client only. None of the producers of the reports were willing to transfer the ownership as part of the sale. Eventually we got given the reports but we had to have all inspections including the topo done again.
