Ball park 137m2 build cost

Featured Replies

  • Replies 345
  • Views 97.7k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Stairs going in now, upgraded to oak in the end as thought it was worth spending an extra 1k in this area. Limestone tumbled floor now complete in hall, kitchen and utility. These have reall

  • More progress! Really pleased with the brick choice and decision to go with a raked out mortar joint, hopefully mortar will dry light grey.   Rooms looking a good size now walls are up.

Posted Images

  • Author

One last thing we may do is add a triangular cut of oak sleeper as the levels drop down to soften the look of the RSJ 

What do others think?IMG_8550.thumb.jpeg.3460c3b380fa9301071792ddc6b40e37.jpeg

  • 1 month later...
  • Author

Been away for a week but guys are cracking on with the patio and doing a great job!

Decided on offset bond rather than brick bond, really pleased with it.

My choice to break bond behind the garage as won’t be seen and saves me some slabs/ losing more of the garden to keep bond (retaining wall would have to have been further back)

Gone for mid grey grout and will use a similar colour for the decorative stones between slabs and sleepers (stones as allows sleepers to move a little and didn’t want any cuts along the back edge! 

  • Author

Done with the laying now, grout next week

One final cut to make down the side by the looks of it

please with the steps also!

 

IMG_8972.thumb.jpeg.b5ed1f6aea8e91deb80e5df8c143f50d.jpeg

  • 3 weeks later...
  • Author

All finished a while ago

Pleased with it all, the flow point ultrascape does seem patchy in a few areas but had heavy rain a couple of hours after final section was complete so not sure if that was the cause IMG_9018.thumb.jpeg.502abf112461974153281aae7e8fbd43.jpegIMG_9017.thumb.jpeg.1bc3fcac72e7c653ac5406aaa02db66a.jpeg

that looks fantastic. 

 

did you try a triangle cut to soften the stepdown of the sleeper wall?

Mine is literally the same and i was thinking of doing the same thing. I'd bought 19 2.4m oak sleepers and they accidently sent me 24 so was tempted to experiment.  

  • Author

Not yet Gaz but we are going to do it

Few bits to finish it off really

-Need the decorative stone between slabs and sleepers

-New socket/ control box wired in to control lights

-Top soil and about 50 lavenders for planters plus some turf to blend lawn in (guessing I need to crack on with this now or leave it until spring)

 

 

Edited by Dan1983

Those beds full of lavender will look smart. Id probably chuck a load of daffodil / snow drop bulbs in too so you get a bit of colour in jan/March before your lavender wakes up in May. 

 

post a picture if you get round to the triangle bits.

That does look good, we could have done better with our oak sleeper retaining wall, but hindsight is wonderful! 

  • 4 months later...
  • Author

Finally got the remote control power supply installed yesterday 

3 spare outlets now for lamp post and garage up lighters 

Spot lights in the sleepers turned out well

 

IMG_9693.thumb.jpeg.3251c86ddb003a07d9c1349e1b44eedb.jpeg

15 hours ago, Dan1983 said:

Finally got the remote control power supply installed yesterday 

3 spare outlets now for lamp post and garage up lighters 

Spot lights in the sleepers turned out well

 

IMG_9693.thumb.jpeg.3251c86ddb003a07d9c1349e1b44eedb.jpeg

That looks really nice. Where did you get your slabs from? Limestone?

18 hours ago, Dan1983 said:

power supply

That's great work.

 

We have much the same in mind at a change in level  and we have  a stack of harvested sleepers from previous agricultural use.

 

I am inspired by the lighting and wondering if it can be low voltage. A length of armoured cable and stacks of connections is rather daunting.

 

I don't mind the steel being visible, using the 'display the structure' principle. 

I guess the other  option would be a vertical piece of sleeper tucked into the web.

 

The steels and sleepers align perfectly. Beautifully done.

 

 

 

 

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.