Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Gate Pillars

Featured Replies

  • 2 weeks later...
  • Replies 715
  • Views 139.7k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • So if it’s like the UFH and bathroom, it will be turned out tomorrow, a photo posted of it and then nothing..... then you’ll see them installed in 2024 using a scratch built hoist that uses the rear a

  • Done. Mortar was a bit sloppy on the second cap so the bed is a bit thin (but we were rushing cos of the lightning! ? )       Drip bead feature seems to work!  

  • 6 courses to go!        

Posted Images

  • Author

Loads of M10 nut caps, in the black PETG. The standard, bought ones weren't deep enough for the longer, stainless coach bolts:

 

IMG_20220813_124832752

 

Before:

 

IMG_20220813_124921461

 

After:

 

IMG_20220813_124933673

 

  • Author

A 3-core SWA to the motor, a 3-core CY for the mag switch. The red & black is for a possible extra set of photocells. All travels underground, through reinforced concrete, in the 3" pipe, to the other pillar.

 

IMG_20220813_150936265

 

I cut a piece of wide dpc to isolate between the stainless mounting plate and cast aluminium motor base. Attached with contact adhesive and holes trimmed with a scalpel. 

 

Reprinting the PETG block the cables come up in for a few mm more clearance. It's just cooling down now.

 

IMG_20220813_151045658

 

  • Author
4 minutes ago, pocster said:

All looking good fella. Well done.

 

Plagiarist! 😂

17 hours ago, Onoff said:

The red & black is for a possible extra set of photocells.


Usually the PIRs have a 4 or 5 core depending on how they’ve been wired - they need to switch something. Have you got a pair to check ..?

  • Author
2 minutes ago, PeterW said:


Usually the PIRs have a 4 or 5 core depending on how they’ve been wired - they need to switch something. Have you got a pair to check ..?

 

Just two wires here to each photocell. I've had them connected to the board on the bench and checked their function:

 

1660463619893-1232411860.thumb.jpg.3765396ac6ac1f3a9f48f0444f747fa6.jpg

 

As it stands I've just got photocells 3 & 4 fitted. The aforementioned red/black is if I fit a pair of photocells as "8" on the diagram. I'll likely get some wireless contact strips instead:

 

1660463540233-671312680.thumb.jpg.7b9931b2d324956c96d4e7a01eeda513.jpg

  • Author
16 minutes ago, MikeSharp01 said:

Is that going to last well outside in the driving sun that is West Kent these days - or is it too shady to ever be a problem?

 

Time will tell! PETG stands up better to heat than PLA so far. Some stuff we've plastic primed and spray painted. 

  • Author

Nearly done but for no white heatshrink! 😤

 

IMG_20220816_185043144

 

 

IMG_20220816_185059892

 

& redoing that 4,5,6 label...

Is that a Faac opener?

I’ve had mine 15 years on a sliding gate and works great

  • 2 weeks later...
  • Author
On 16/08/2022 at 19:25, TonyT said:

Is that a Faac opener?

I’ve had mine 15 years on a sliding gate and works great

 

Chamberlain. Had it about 10 years...only just taken out of the box! 😂

 

Fired it up for the first time last night via a temporary lead. Double checked the wiring beforehand of course. Need to sleeve a grey core with some blue sometime but it's all got cable markers etc. Both CR2032 batteries in the remotes dead of course! Fitted a new one in one and it all works a treat so far, nice smooth running action. With a bit of lube it should be even better/quieter. Just got to set up the end of travel magnets tonight. Have "misplaced" one of the magnet mounting brackets like this. Tbh the space between lugs is too narrow to fit over the metal rack I have (like 20mm vs 22mm), designed I guess for the plastic rack:

 

2022-08-31_07-52-08

 

Gave to laddo and a few minutes later:

 

unknown-9

 

He'll print a couple in black PETG and I'll affix with M5 stainless, countersunk screws drilled and tapped into the rack.

 

Though I've buried ducted SWA from the garage to gate pillar it's justy coiled up inside the garage along with a couple of other comms cables for video entry, camera etc. That's the next mission, thread it round the garage but I need to move h.duty shelves and one car, possibly two! Then trench to the house...

 

So another 10 years! 🤣

 

 

  • Author

A video of the gates finally working albeit off a temporary fly lead as aforementioned:

 https://flic.kr/p/2nJMkws

 

 

All working but for a pita with a board output that doesn't seem to be working! :(


Anyone else got Chamberlain Liftmaster kit with a CB22 pcb? @Big Jimbo?

 

(expletive deleted) me ; prestel kicked in when @Onoff posted in this thread again .

  • Author
20 minutes ago, SteamyTea said:

Can I come and break them in Sunday?

 

Screenshot_20220905-200514.png

 

You'd be more than welcome to but I'm likely working Saturday and Sunday assuming I'm Covid free. TBA.

On 14/08/2022 at 10:21, MikeSharp01 said:

Yes as long as you block the UV I would have thought it would last well. 

Sun would have imploded by then - wouldn’t worry about UV 

  • Author
2 minutes ago, pocster said:

Sun would have imploded by then - wouldn’t worry about UV 

 

Doubter, all printed, sprayed, fitted and WORKING!

1 minute ago, Onoff said:

 

Doubter, all printed, sprayed, fitted and WORKING!

Admin please ; for the first time in earths history…..  amend  @Onoff ‘s title to “ completed “

  • Author
1 minute ago, pocster said:

Admin please ; for the first time in earths history…..  amend  @Onoff ‘s title to “ completed “

 

Onto the solar thermal roof brackets tomorrow now that Summer's over...

 

... maybe

Just now, Onoff said:

 

Onto the solar thermal roof brackets tomorrow now that Summer's over...

 

... maybe

I (expletive deleted)ing sort the bathroom ufh this year ( again ) 

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.