I hope this thread is in the correct section.

 

Hi

 

The company that is doing our house as built SAPs as asked me to sign and return Part L1A 2013 Specification to sign off the dwelling, see attached. My concern is we didn't use as much insulation as stated on the form for walls (stated 100mm but used 50mm PIR) and floor (stated 150mm but used 100mm PIR for UFH). Therefore, the house won't achieve the stated u-values.
Any suggestions as to what to do? We are ready to move in.

Should I be concerned?

Oh boy this feels bad but I must ask, should I sign it as stated should I amended it then sign it? What are the consequences?

 

Thanks

 

saps.png

Posted

Email them back and state what you did, they will update the U values etc.

 

Then if you get a fail, get ready to install solar PV to make up the difference.

Posted

If you amend it the house will fail and you will need to spend ££££ on PV to get a pass.  That said, solar PV is quite useful.  It could still fail on fabric efficiency.

Posted

I was hoping you would just say just sign the form without amendments. How would they know what insulation you have used? :)

arggggh I don't have the funds for the solar :( After 5 years, we just want to move in. 

Posted
2 minutes ago, iMCaan said:

I was hoping you would just say just sign the form without amendments. How would they know what insulation you have used? :)

arggggh I don't have the funds for the solar :( After 5 years, we just want to move in. 

Then don't ask questions you don't want a truthful answer too - which isn't what you want hear!🫣

Posted (edited)

It's just frustration.

I asked the questions to hear the truth.

 

Besides solar, how long would you have to fit the solar?

Can they enforce adding insulated plasterboard, which would mean a lot of work?

 

Edited by iMCaan
Posted

Yeh we used 50mm pir insulation in walls. The cavity walls were 300mm with in total (100mm blocks, 50mm PIR insulation, 50mm cavity and 100mm stone).

100mm PIR insulation on ground floor for UFH.

25mm PIR insulation for first floor UFH.

200mm earthwool between joists.

400mm earthwool above joists.

150mm PIR insulation for slopped roof.

 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...