flanagaj Posted 12 hours ago Posted 12 hours ago I had our plans estimated and it gave me a figure for labour up to plate height. So far, they have ranged from 10k over the estimators 20k figure, up to a staggering 45k over. I really don't know how to proceed now as we have had 4 quotes so far. It's a very simple brick and block rectangle, built using stretcher bond.
G and J Posted 11 hours ago Posted 11 hours ago Sorry for the potentially numpty response, but assuming you mean first floor wall plate, for comparison. 55 linear metres in Suffolk to first floor height, ie just ground floor from below damp, brick plinth average 4 courses, then blocks, labour only 12.5k. Excellent work. From your pictures, in previous posts, your brick work is going to be huge part of your overall design so may be "simple" but the quality required is going to be high...........was your estimate realistic, are your quotes labour only? On the former we had a take off done, and they assumed pretty basic everything (apart from a contractors profit!)
Mr Punter Posted 11 hours ago Posted 11 hours ago Keep going with the quotes. What did your estimator base their price on?
Great_scot_selfbuild Posted 10 hours ago Posted 10 hours ago 1 hour ago, flanagaj said: I had our plans estimated and it gave me a figure for labour up to plate height. So far, they have ranged from 10k over the estimators 20k figure, up to a staggering 45k over. I really don't know how to proceed now as we have had 4 quotes so far. It's a very simple brick and block rectangle, built using stretcher bond. @flanagaj I can highly recommend Adam Chandler - https://chandlerhp.co.uk/services/house-builds/ (based in Basingstoke) Best of luck, stay positive! 1
flanagaj Posted 10 hours ago Author Posted 10 hours ago Here are the estimates that I received from Estimators. Excavation & Foundations - 7 days (2GW + 1 Labourer) Foundation Masonry - 5 days (2B + 1 Labourer) Brickworks - 15 days (2B + 1 Labourer) My theory is that if estimators can't be that far off when it comes to estimating costs for a build.
crispy_wafer Posted 9 hours ago Posted 9 hours ago Do you think those labour rates are accurate for your region? Materials are quite easy to cost up, but humans cost lots these days!
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now