Wadrian Posted 1 hour ago Posted 1 hour ago (edited) Hi everyone just broke ground yesterday for our self build. I Informed the building control that we should be ready in next 2 weeks for the foundation inspection. I had an email from building control to say they will not come to site until they have receive our M&E design (heating, ventilation, hot water) is this something I would get a company to do? We are having a Grant ASHP and the manufacturer has designed a suitable tank and cylinder etc. we are also having UFH. Please can anyone advise on How do I go about getting an M&E design? Is it one design or does it require multiple plans from various trades? thanks for any replies in advance Edited 1 hour ago by Wadrian
Tony L Posted 46 minutes ago Posted 46 minutes ago Well, yes, if you're not going to do it yourself, then you'll have to pay somebody to do it. You could get an M&E consultant, such as @Nickfromwales, who posts here a lot, to do the whole lot, or you might get one company to deal with CH & hot water, & a separate company to deal with MVHR, if that's what you're having. & if you're not having MVHR, I should think you just need to mention the trickle vents in the windows & give the spec' of the extractors in the bathrooms & kitchen. Somebody who knows a lot more than me will be along to help you out tomorrow.
Roger440 Posted 44 minutes ago Posted 44 minutes ago Is this actually a requirement now? I cant believe everyone designs all that before you even start work on the house.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now