Wadrian Posted 1 hour ago Posted 1 hour ago (edited) Hi everyone just broke ground yesterday for our self build. I Informed the building control that we should be ready in next 2 weeks for the foundation inspection. I had an email from building control to say they will not come to site until they have receive our M&E design (heating, ventilation, hot water) is this something I would get a company to do? We are having a Grant ASHP and the manufacturer has designed a suitable tank and cylinder etc. we are also having UFH. Please can anyone advise on How do I go about getting an M&E design? Is it one design or does it require multiple plans from various trades? thanks for any replies in advance Edited 1 hour ago by Wadrian
Tony L Posted 1 hour ago Posted 1 hour ago Well, yes, if you're not going to do it yourself, then you'll have to pay somebody to do it. You could get an M&E consultant, such as @Nickfromwales, who posts here a lot, to do the whole lot, or you might get one company to deal with CH & hot water, & a separate company to deal with MVHR, if that's what you're having. & if you're not having MVHR, I should think you just need to mention the trickle vents in the windows & give the spec' of the extractors in the bathrooms & kitchen. Somebody who knows a lot more than me will be along to help you out tomorrow.
Roger440 Posted 1 hour ago Posted 1 hour ago Is this actually a requirement now? I cant believe everyone designs all that before you even start work on the house.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now