Jump to content

Tiling a wet room


jayc89

Recommended Posts

I'm using one of these linear wet room trays - https://www.drawabath.co.uk/abacus-elements-1800-x-900mm-infinity-level-single-fall-wetroom-shower-tray-kit-1000mm-offset-linear-drain.html - in the instructions it recommends tiling the walls before the floor for better water run off. 

 

Do I need to do that for the entire room or just the wall behind the drain? 

Link to comment
Share on other sites

That's b***ocks. Floor first, right up to the wall. Then bring the wall tiles down onto them with a 1mm gap. Seal with CT1, wipe flush. When set put a silicone bead on which you can periodically replace. 

 

A Welsh wizard once told me that. 

  • Like 2
Link to comment
Share on other sites

1 hour ago, jayc89 said:

I'm using one of these linear wet room trays - https://www.drawabath.co.uk/abacus-elements-1800-x-900mm-infinity-level-single-fall-wetroom-shower-tray-kit-1000mm-offset-linear-drain.html - in the instructions it recommends tiling the walls before the floor for better water run off. 

 

Do I need to do that for the entire room or just the wall behind the drain? 

Yes

Never tile the floor before the wall on any tiling job 

Link to comment
Share on other sites

6 hours ago, Onoff said:

That's b***ocks. Floor first, right up to the wall. Then bring the wall tiles down onto them with a 1mm gap. Seal with CT1, wipe flush. When set put a silicone bead on which you can periodically replace. 

 

A Welsh wizard once told me that. 

 

4 hours ago, nod said:

Yes

Never tile the floor before the wall on any tiling job 

 

Well that was my thoughts too, but the instructions explicitly say walls first for some reason... Floor it is. 

Link to comment
Share on other sites

34 minutes ago, jayc89 said:

 

 

Well that was my thoughts too, but the instructions explicitly say walls first for some reason... Floor it is. 

That’s correct Walls first

  • Thanks 1
Link to comment
Share on other sites

I did floor first then protected the floor with Correx. I then used a homemade tile levelling system to place the second tile up.

 

20180923_204758

 

For the bottom tile I turned it over, placed it on 1mm packers and marked the cut line with the laser. When you turn it back it's bang on:

 

20181015_193132

 

20190309_215812

 

(I should add I can't tile to save my life! Up until then the wall boarding was all perfectly square 😂). 

Edited by Onoff
  • Like 1
Link to comment
Share on other sites

32 minutes ago, Chanmenie said:

Why’s that ?

it seems most tile the floor first 

Most definitely don’t 

There’s a number of reasons 

The first one being that the floor would be damaged marked or stained 

Also if anything is likely to move it’s the floor Chipping the bottoms of the wall tiles 

Also if the floor is running out which most are It’s neater to do the walls first 

  • Like 1
Link to comment
Share on other sites

I fitted one of these for my parents and I'd never fit one again!  They look amazing but weren't well made and Abacus couldn't care less. A year or so down the line, the plastic guttering/drain cracked and leaked. I had to break the ceiling from underneath to fix it which was an absolute headache

Link to comment
Share on other sites

If you do floor first then the wall tiles come down onto them. A much better detail in terms of waterproofing and no horrible grout line at the edge where the floor and wall meet. 

Link to comment
Share on other sites

10 minutes ago, Vijay said:

I fitted one of these for my parents and I'd never fit one again!  They look amazing but weren't well made and Abacus couldn't care less. A year or so down the line, the plastic guttering/drain cracked and leaked. I had to break the ceiling from underneath to fix it which was an absolute headache

 

I cast my floor to falls in the wet room corner and it's stayed perfect. Took some working out along with the Geberit wall drain. I'd do it again in a heartbeat but next time use a tile levelling system.

 

2019-10-16_06-08-41

 

  • Like 2
Link to comment
Share on other sites

1 hour ago, Vijay said:

I fitted one of these for my parents and I'd never fit one again!  They look amazing but weren't well made and Abacus couldn't care less. A year or so down the line, the plastic guttering/drain cracked and leaked. I had to break the ceiling from underneath to fix it which was an absolute headache

 

I had to send the first tray back because it was damaged around the drain. If it's not supported well from below I can see there being plenty of flex around it. 

Link to comment
Share on other sites

14 hours ago, Onoff said:

I did floor first then protected the floor with Correx. I then used a homemade tile levelling system to place the second tile up.

 

20180923_204758

 

For the bottom tile I turned it over, placed it on 1mm packers and marked the cut line with the laser. When you turn it back it's bang on:

 

20181015_193132

 

20190309_215812

 

(I should add I can't tile to save my life! Up until then the wall boarding was all perfectly square 😂). 

Looks good to me 

Link to comment
Share on other sites

On 18/08/2024 at 12:25, jayc89 said:

I'm using one of these linear wet room trays - https://www.drawabath.co.uk/abacus-elements-1800-x-900mm-infinity-level-single-fall-wetroom-shower-tray-kit-1000mm-offset-linear-drain.html - in the instructions it recommends tiling the walls before the floor for better water run off. 

 

Do I need to do that for the entire room or just the wall behind the drain? 

We've one of those. They're shite. Base is soft, ours was deformed and a pain to install. Barely any fall on it and if water goes past a certain point, it pools in the corner. Tiler did best he could.

Link to comment
Share on other sites

5 hours ago, Conor said:

We've one of those. They're shite. Base is soft, ours was deformed and a pain to install. Barely any fall on it and if water goes past a certain point, it pools in the corner. Tiler did best he could.

 

The first one we had delivered was similar, so I rejected it. A second one arrived and seems much better, albeit bowed when I fixed it down on a bed of adhesive. Some additional weight whilst it was setting seemed to sort that out though. 

 

These comments aren't sounding too promising though!

Link to comment
Share on other sites

20 hours ago, jayc89 said:

 

I had to send the first tray back because it was damaged around the drain. If it's not supported well from below I can see there being plenty of flex around it. 

 

Yep but I did timberwork to support it, but it still failed :(

Link to comment
Share on other sites

13 hours ago, jayc89 said:

 

The first one we had delivered was similar, so I rejected it. A second one arrived and seems much better, albeit bowed when I fixed it down on a bed of adhesive. Some additional weight whilst it was setting seemed to sort that out though. 

 

These comments aren't sounding too promising though!

exactly how I installed it, used blocks to weigh it all down when installing it. 

Link to comment
Share on other sites

On 19/08/2024 at 08:43, nod said:

Most definitely don’t 

There’s a number of reasons 

The first one being that the floor would be damaged marked or stained 

Also if anything is likely to move it’s the floor Chipping the bottoms of the wall tiles 

Also if the floor is running out which most are It’s neater to do the walls first 

Well fortunately for me my floor is concrete so won’t be moving, and it is very level, I was thinking of doing floor first and covering it with Protec sheets as I agree with the possibility of it getting damaged 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...