Jump to content

Recommended Posts

Posted

What’s going in there?
Mine will be about half that for ASHP cylinder and solar batteries, inverters, etc.

Posted

It was a rhetorical question 😁

 

But answer your Qs:

Yes it's been planned.

HWC

Buffer tank for UFH

UFH manifold for lower floor

The electrical CU's

A comms cabinet

The MVHR (already there on the right)

H & C manifolds ( to those pipes on the left)

 

  • Like 1
  • 5 months later...
Posted

Mine is a 0.8 × 1.4 m cupboard off the downstairs loo. 🤣  The electrical panel and OSO UVC (a later SunAmp replacement) are in the utility.  The MVHR is in the loft floor drying / storage room.

  • Like 2
Posted
2 hours ago, Nickfromwales said:

These bad boys ;)  

That is what I thought but zooming in you can see that it is not - looks like either nutserts, see below, or a bolt with the head on the wall side of the board, which is why I asked.

 

image.png.3fb002d3e9c0afada35ba0a2f84ec7fe.png

  • Like 1
Posted

Ah, yes, more zooming-in for me from

now on lol.

 

It wouldn’t surprise me if the threaded bar isn’t just wound into a slightly undersized pilot hole, maybe with a bit of mastic. 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...