CalvinHobbes Posted April 4 Share Posted April 4 Yikes,they will install them but maybe we should do something to assist? Like wash down for dust so tape sticks? Should we paint the area with something? Blimey a bit nerve wracking. Link to comment Share on other sites More sharing options...
Conor Posted April 4 Share Posted April 4 (edited) make sure access is all sorted and safe. keep a very close eye on them and dont let them leave until you are happy. Good to have your main builder on site. We had ot get our installers back multiple times. Last issue was resolved a couple weeks ago - three years later!!! Edited April 4 by Conor 1 Link to comment Share on other sites More sharing options...
CalvinHobbes Posted April 9 Author Share Posted April 9 (edited) Baskill started putting in the windows,the builder was using some foam taday, now worried after seeing other thread it's ok. A screengrab shows Soudall. Red can. The pdf below I think is it's details... foam.pdf Edited April 9 by CalvinHobbes Link to comment Share on other sites More sharing options...
CalvinHobbes Posted April 9 Author Share Posted April 9 (edited) So comparing them it seems the same???? Edited April 9 by CalvinHobbes Link to comment Share on other sites More sharing options...
CalvinHobbes Posted April 9 Author Share Posted April 9 Almost scared to post these but what do you think? Link to comment Share on other sites More sharing options...
CalvinHobbes Posted April 9 Author Share Posted April 9 Link to comment Share on other sites More sharing options...
Russell griffiths Posted April 10 Share Posted April 10 My personal opinion obviously your front door needs redesigning the location is too close to the side wall, you will have problems once that wall is plastered, the door will never open properly and will always be a PITA. A 100mm stub wall should have been built to allow the door to open 120 degrees, you will struggle to get that to open to 90. Link to comment Share on other sites More sharing options...
Declan52 Posted April 10 Share Posted April 10 I have had my baskil windows in for close to 10 years and they have been 100%. I had a seal go after 7 years and they come out and replaced it straight away. You do have to pay the call out fee which I think was £80 but the window was 8ft * 6ft so easily 4 times that if not more of I was paying for it. Most of their bad rep is from the cheap windows they install for builders. The builders want cheap windows and they supply them. Like everything else you get good and bad installers. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now