I am trying to coordinate the detailing for our slab pour to ideally accommodate fitting a rimless and flush tray - thinking of using this https://www.my-bette.com/en/products/further-product-topics/betteair

 

The slab will be 150mm thick and will be our final surface so no screed on top. We cant have screed as we have UFH pipes at 50mm below the surface and the company doing this insist on this minimum 50mm cover from the main concrete pour. So my issue is I can just about see how we could use formwork to get a recess in the slab  during the concrete pour for the tray but how do we make the interface between the slab and tray waterproof and also how do we get a neat interface line?

 

thanks

Link to comment
Share on other sites

My pipes are at the bottom of a 100mm concrete slab, directly stapled in to the insulation. So an over pout could be done, but you don't need to.

 

Where you want your shower tray form a void so the concrete is missing.  Make a plug out of 50mm foam or PIR slightly bigger than the size you want your tray, position exactly (some wiggle room as you are making plug oversize).  Wire down to where your UFH pipes wil be.  Do pour and after a day or month or two break out the plug and you have a void for your shower.  Make sure you have space and have for drainage.

Link to comment
Share on other sites

Hi @JohnMo thanks for this. I had thought make the plug slightly smaller. If larger how do you deal with the gap once you put the tray in? That and the fact that it will likely be a bit of a ragged mess. I thought smaller and then grind the perimeter to exact size once hardened to match tray size. And I still dont understand how you make the interface between the slab and the tray watertight?

Link to comment
Share on other sites

Our floor was power floated, it's not what you would want as a finished floor.  You certainly would have any hard skin on your feet if walked about without socks on.

 

Make sure your contractor is aware he is doing a finish floor, power float and finished floor are not the same.

Link to comment
Share on other sites

We're having our slab as the final floor finish too - it will be powerfloated on the day it's poured, but will then be ground back/polished about 6 weeks later I believe. How long you do the grinding will dictate the finish on the floor. We want a relatively satin/matt finish so I guess this will be minimal.

Link to comment
Share on other sites

I think you will really struggle to make this work.  The concrete may not be flat enough, the edges could be chipped or ragged, incorrect size etc.  I have used a flat shower in a posh hotel and the water went all over the bathroom floor.  Really slippery and wet feet all the time.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...