Conditions to be satisfied prior to start
Post and beam replied to Post and beam's topic in Planning Permission
Which is why i wrote this, above, 5 minutes ago. -
Conditions to be satisfied prior to start
Post and beam replied to Post and beam's topic in Planning Permission
There is, which is why i did #3 & #4 together. It would be good of course to do all the rest in a single submission. But as per the post its a case of knowing what do i need to do for each. With regard to #10, 100 tons of hardcore onto the parking area so that it does not turn into a muddy mess is how i understand it. The site slopes 2 metres down away from the road so i dont expect any water run off issues onto the 'highway'. -
Conditions to be satisfied prior to start
Post and beam replied to Post and beam's topic in Planning Permission
4 is satisfied so 5 & 6 then? I did wonder if i was required to just make a statement for example for # 11,#12 and #13. -
Our planning permission has 16 conditions attached. it is/was my understanding that they all had to be satisfied prior to putting a spade in the ground. 'Prior to start' sort of being the whole point of them. But, and this is my question of those that have been here before me.... Some of them are not able to be satisfied before hand and i wonder how others have navigated this. I have e mailed the planning dept for clarity. They are not very responsive. #3 & #4 are satisfied. Conditions: 1. The development to which this permission relates shall be begun within a period of three years commencing on the date of this notice. Reason To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (As Amended). 2. The development hereby approved shall be carried out in accordance with the approved plans listed at the end of this Decision Notice. Reason To ensure the development is carried out in accordance with the approved plans, drawings and specifications. 3. Prior to any above ground construction works being commenced, the external materials of construction for the development hereby permitted shall submitted to and approved in writing by the Local Planning Authority, and thereafter the development should be implemented in accordance with the approved details. Reason In the interests of amenity and good design in accordance with Policy DES4 of the East Herts District Plan 2018. 4. No development shall take place within the proposed development site until the applicant, or their agents, or their successors in title, has secured the implementation of a programme of archaeological work in accordance with a written scheme of investigation, which has been submitted to the planning authority and approved in writing. This condition will only be considered to be discharged when the planning authority has received and approved an archaeological report of all the required archaeological works, and if appropriate, a commitment to publication has been made. Reason: The programme is required to be undertaken prior to the commencement of the development to secure the protection of and proper provision for any archaeological remains in accordance with Policies HA1and HA3 of the East Herts District Plan 2018 and the National Planning Policy Framework. 5. Prior to the commencement of development hereby approved, detailed plans showing the existing and proposed ground levels of the site relative to adjoining land, together with the slab levels and ridge heights of the proposed buildings, shall be submitted to, and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the approved details. Reason The details are required to be approved prior to the commencement of development to ensure that the development is properly related to the levels of adjoining development in the interests of neighbour amenity and good design in accordance with Policy DES4 of the East Herts District Plan 2018. 6. Prior to the commencement of development hereby approved, details of the design and construction of the dwelling to demonstrate how the design, materials and operation of the development minimises overheating in summer and reduces the need for heating in the winter to reduce energy demand and reduces water demand, in addition to how carbon dioxide emissions will be minimised across the development, taking account of all levels of the energy hierachy, shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be implemented in accordance with the approved details. Reason To adapt to climate change, reduce carbon emissions and efficiently use water resources in accordance with Policies DES4, CC1, CC2, CC3 and WAT4 of the East Herts District Plan 2018. 7. All existing trees and hedges shall be retained, unless shown on the approved drawings as being removed. All trees and hedges on and immediately adjoining the site shall be protected from damage as a result of works on the site in accordance with BS5837: 2012 Trees in relation to design, demolition and construction, or any subsequent relevant British Standard, for the duration of the works on site and until at least five years following contractual practical completion of the approved development. In the event that trees or hedging become damaged or otherwise defective during such period, the Local Planning Authority shall be notified as soon as reasonably practicable and remedial action agreed and implemented. In the event that any tree or hedging dies or is removed without the prior consent of the Local Planning Authority, it shall be replaced as soon as is reasonably practicable and, in any case, by not later than the end of the first available planting season, with trees of such size, species and in such number and positions as may be agreed with the Authority. Reason To ensure the continuity of amenity afforded by existing trees and hedges, in accordance with Policy DES3 of the East Herts District Plan 2018. APPLICATION NUMBER – 3/22/2639/FUL APFULZ 8. Prior to first occupation of the development hereby approved, details of landscaping shall be submitted and approved in writing and shall include full details of both hard and soft landscape proposals, finished levels or contours, hard surfacing materials, retained landscape features, planting plans, schedules of plants, species, planting sizes, density of planting and implementation timetable and thereafter the development should be implemented in accordance with the approved details. Reason To ensure the provision of amenity afforded by appropriate landscape design in accordance with Policies DES3 and DES4 of the East Herts District Plan 2018. 9. All hard and soft landscaping works shall be carried out in accordance with the approved details. Any trees or plants that, within a period of five years after planting, are removed, die or become, in the opinion of the Local Planning Authority, serioudly damaged or defective, shall be replaced as soon as is reasonably practicable with others of species, size and number as originally approved, unless the Local Planning Authority gives its written consent to any variation. Reason To ensure the provision, establishment and maintenance of a reasonable standard of landscaping in accordance with the approved designs, in accordance with policy DES3 of the East Herts Local Plan 2018. 10. Before the crossover is installed, all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway. Reason: In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises in accordance with policy TRA2 of the East Herts District Plan 2018. 11. Concurrent with the construction of the access, the visibility splays as shown on drawing number 22-036-101 rev E shall be provided and permanently maintained in each direction, within which there shall be no obstruction to visibility between 600mm and 2 m above the carriageway level. Reason: To provide adequate visibility for drivers entering or leaving the site, in accordance with policy TRA2 of the East Herts District Plan 2018. 12. In connection with all site demolition, site preparation and construction works, no plant or machinery shall be operated on the premises before 0730hrs on Monday to Saturday, nor after 1830hrs on weekdays and 1300hrs on Saturdays, nor at any time on Sundays or bank holidays. Reason To safeguard the amenity of residents of nearby properties from noise pollution in accordance with Policy EQ2 of the East Herts District Plan 2018. 13. Prior to first occupation, full details of waste and recycling bin storage shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall be provided on site prior to first occupation and thereafter retained for the storage of waste and recycling. Reason To ensure adequate bin storage on site and in the interests of amenity and good design in accordance with Policy DES4 of the East Herts District Plan 2018. 14. The dwellings hereby approved shall be fitted out so that the potential consumption of wholesome water by persons occupying the dwelling will not exceed 110 litres per person per day as measured in accordance with a methodology approved by the Secretary of State. The dwelling shall not be occupied unless the notice of the potential consumption of wholesome water per person per day required by the Building Regulations 2010 has been given to the Local Planning Authority. Reason: In order to set a higher limit on the consumption of water by occupiers as allowed by regulation 36 of the Building Regulations 2010 and thereby increase the sustainability of the development and minimise the use of mains water in accordance with Policy WAT4 of the East Herts District Plan 2018, the Sustainability SPD and guidance in the NPPF. 15. Prior to first occupation or use of the development hereby approved the hard surfaced areas of the development, including roads, pavements, driveways and car parking areas shall be surfaced in accordance with details submitted to and approved in writing by the Local Planning Authority and thereafter the development should be implemented in accordance with the approved details. Reason To ensure safety and satisfactory appearance in accordance with Policies DES4 and TRA2 of the East Herts District Plan 2018. 16. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (As Amended), or any amending Order, Schedule 2, Part 1, Class A, B, C and E of the Order shall not be undertaken without the prior written permission of the Local Planning Authority. Reason In order to ensure the site will continue to protect openness of the Green Belt in the future, as to comply with policy GBR1 of the East Herts District Plan 2018.
-
When i was a submariner in a previous life it was the 'Lysers' that gave everyone the frighteners. And thats with a Nuclear reactor next door. They used very high current, very high temperatures and very high pressures. They were not the most reliable devices you could imagine. Think the French lost at least one boat to a failure of such a thing. Just sayin....
-
88 new houses near Cambridge to be demolished.
Post and beam replied to Temp's topic in General Self Build & DIY Discussion
I thought i read about this a few weeks ago. Some of the houses are indeed already occupied -
Not a universally agreed experience then.
-
A question to those that know, When i get quotes for boarding out my house( actively looking by the way) is it the same guys that plaster/skim them? I just need to know how many line items to cost for on my budget spreadsheet. Thanks in advance guys as always
-
Good afternoon guys As per the title really, i am thinking of using one of these companies. As a bit of a sanity check on my estimates. Is there a standout 'go to' company, are they all a much of a muchness or a total waste of time? All opinions gratefully receieved as always Personal recommendations of course are great
-
Hi Guys I need to drill into masonary in a tight space( replace a WC cistern thats built in as it happens) so i bought the adaptor you see below. DEWALT Right Angle Drill Adaptor, 2-in-1 Attachment (DWAMRAFT) A normal round drill bit is not suitable for this. So my question is... have a screwed up or is there a drill bit that is suitable for this quick grip attachment? Thanks in advance keith
-
Airtightness boundary within Build regs drawings
Post and beam replied to Post and beam's topic in Building Regulations
I intend to -
Quote for groundworks, include drainage?
Post and beam replied to Post and beam's topic in General Construction Issues
I have had conversations with my proposed groundworker that included re routing an existing foul drain that runs across my plot under my house footprint. So i regard the subject as 'discussed on site. Same conversation with the TF company contracts manager and the initial salesman. Also both while on site. As a novice to this house building lark i dont know what else i should have done to set expectations. -
Quote for groundworks, include drainage?
Post and beam posted a topic in General Construction Issues
For those that have been through this process, i have a quote for my groundworks that makes no mention of the drainage away to the sewer. Is it usual to include drainage or to have it as a separate quote please? -
which trades, when and in what order
Post and beam replied to Post and beam's topic in General Construction Issues
Understood and thanks -
which trades, when and in what order
Post and beam replied to Post and beam's topic in General Construction Issues
Apologies, i meant they know what order trades should be on site. I have no pre conceptions with regard to airtightness -
which trades, when and in what order
Post and beam replied to Post and beam's topic in General Construction Issues
Thanks dude Couple of questions. I dont understand 'pre plaster inspection'. # We are having MVHR, which i intend to run the trunking for. I also expect to do much of the Airtightness tape work as well but dont want to get in the way of the first fix guys. Whats the convention here? # UFH & screed after the studwork and before any of the first fix i guess ? Also on the outside trades. Upper storey is weatherboard on the gable ends and dormers, Bricks to the lower floor with a large external chimney stack. Roof tiles will be done first of course and the glazing in. So if the brickies are next when does the guttering and the Soffits/barge boards get done. I suppose the Scaffolding stays in place after the brickies ( perhaps with a drop change) so that the weatherboarding can get done. The trades all know the form of course but if i have to schedule them i want to understand the conventions and best way to do this. -
I thought i had a builder lined up to take my house from Weathertight( Sips construction from Potton Homes) to completion but i may have missed their window. They are very busy which hopefully means they are good. So, if i now have to arrange trades on a one by one basis is there a preferred order. More importantly i guess, is there an order that would be a very bad idea? Thanks in advance keith