-
Posts
4747 -
Joined
-
Last visited
-
Days Won
3
Everything posted by zoothorn
-
No but if he has another 4x jobs on, as probably has, he'd just do the internal xyz stuff of build no.3 instead tho & swap days surely.
-
@Russell griffiths ok thanks a bit more undrstood. Tbh its started & hitting so damn hard right now I'd be very surprised if my builder doesn't call it off.. I mean if its not costing him for the resheduling of the pour, what's the point of slaving away under such abysmal condiitions for hours all 3 of them. I hope for a call. Thanks chaps.
-
Its wood & it dries, besides, the weatherproof layer will go on asap if its bad weather: its totally different. Water is part of the mix of the concrete, you put too much in the mixer from the bucket & it weakens the mix, no? How is 50-70mm of rain onto & during the pouring out from the big FO mixer into the trench, & pushed about with etc.. any different at all?
-
I simply can't do this tho. I spent whole morning testing a screw & how to use it: 4mm & my driver gets it in 1" & stops (I cant ratchet the remaining 4+" in by hand/ utterly nuts). 5mm hole = 2" in & stops. 6mm pilot = 2.5" in. 7mm pilot= 3" in.. & I can just about hand ratchet the remaining 2" in as I'm doing 12 & not 50. 8mm pilot is best, but the shaft's noticeably not flush in the hole/ gap. They're obviously meant to be used with a tool I dont have, power compact driver or whatever it is/ I dont know what.. but info doesn't mention.
-
Look at the forcast for west wales Oz.. pretty much the worst rain day in 3 years Ive seen forcast.
-
You've said.. but I can't understand how.
-
But Mr Punter its not this- the rain that's in the trench will be pumped out. Or, if anything left in it will be displaced. I understand this. What is different, is 50-70mm of rain lashing down whilst the concrete is being poured, & the timeframe after its poured > to when it cures. What if 150mm of rain lashes down onto a newly poured foundation? this might well be the case if 3 days of constant rain commences tmrw.
-
@Carrerahill thanks for that post ^ I appreciate the support re. my n'bors but the stress & cost of going legal on them, &/ or asking solicitors to get involved is too much for me tho. They know this. I just have to live with them being the way they are- if I show its affecting me, they'll just up the anti a bit more anyway. I'll call my builder tonight & just see tentatively if tarps available I borrow & do myself (but how do I tie them all down??).. but either way its me interfering & I dare not ask if -they- do tarps, let alone mention concrete ratios: its asking for trouble: I am after all a lower caste english & he has been very accomodating with my design & plan to-fro'ing over a long time. I can't see how the island bit the trench is dug around, without being covered too, won't just pour all the rain into the concrete.. which means I need one HUGE 36sqM tarp to cover the whole thing + pins/ pegs: £80-£100? & from where at this late stage?
-
Ah ok.. just the oval design seems just -not- what I need, if I want to prevent any movement/ the very core purpose of the brackets. Coach screws https://www.screwfix.com/p/turbocoach-coach-screws-zinc-plated-8-x-120mm-50-pack/2394g?_requestid=465146 A whole morning of testing one screw into offcut.. & I got it down to a 7mm pilot hole (6mm is too tight, for me) driver it 2/3rds in, then socket ratchet whatnot the rest. So the bolts' shaft top area w'out thread, is 6mm. Is my 7mm pilot hole ok?
-
Hi Onoff, photo in post couple above.. screwfix link/ mine like this.
-
@Carrerahill I can't possibly even ask re. resheduling let alone get onto the yard re. the ratios.. its just not my jurastiction. I am the client. Only once they've built will I jump in & do inside work, but this build is 100% not +me involved from their build/ work pov. If I were to get onto the yard.. how do you think my builder will react?! he would go absolutely fkn mad & I'd ruin the good relationship I have with him. Ok I wasn't concerned before but now I am again. I am now absolutely fkn furious with whoever called the police & stopped tuesdays cement.. maybe they even saw forcast & this prompted the call/ the sod husband was an architect + their cunning xyz together at me over 2 yrs now has been SO damn clever/ calculated, as much as its been atrocious. I havent the money, or the resources, the know-how, the dare, or time to go & buy & then put up covering tarps over what 20 sqM? its impossible.
-
Can anyone please help/ advise? thanks, zoot
-
Does anyone know how these brackets work https://www.screwfix.com/p/sabrefix-heavy-duty-angle-brackets-galvanised-63-x-90mm-10-pack/86180 They're the only ones afaict @ right height for what I need. Ok in the metal I have one 10mm hole that's spot on for height to use for an 8mm bar across > thru 3" beam > into another similar bracket other side (if that's the right idea?).. but a bloomin oval hole just where I need a normal hole to be above. What do I do here? its the same with the downward side into pad.. one hole is useable, but a bloody oval hole again scuppers me. Are these brackets even suitable?
-
Ok these L brackets.. I bought some but no idea if suitable/ they have a large oval holes in just where I need round holes, so I don't know how on earth to use them or if suitable at all (but all screwfix had, in the shape of an "L" with a high upper section). I need the extra height one end in to meet my beams, as they'll be sitting 2" off the pad on plastic risers.. for eg screwfix 71671 types I can't use as my beam will be above them. Screwfix 86180 is what I have. ?? As to getting the coach bolts in. I can't get in using any smaller pilot hole than 8mm. Is this no good then?
-
If I use a power (electric) drill & do 8mm pilots, I can -just- get my bit thru my 3" post top (or 3" beam), & in 1 cm pilot into my beam to be fixed. If I use this mark, take beam of/ drill 8mm pilots again & use a ratchet/ socket bar thing I might be able to. But this doesn't seem right, I shouldn't be doing this surely. I need to do this 12x too. At the moment I can't even join two beams together to make an "L"!
-
I'm sure but I don't have one & I cant spend out £100 on a driver.. I can't afford it. Actually a friend just called & done a ~similar deck/ joist thing (not with 6x6 beasts tho) & used these bolts: he mentioned a 't-bar' &/ or socket job to get them in.. as he's older school & not so into 'yoof motor things'. I'm not getting with what they're designed to be driven in with, or what pilot hole size (even 8mm pilots.. I still can't use a drill driver to get 1 thru the 3" softwood!). The replies/ reviews say nothing apart from 'excellent blah.. easy in with a drill driver'.
-
I'm really struggling with this. I've done 1 test of a turbo coach screw into a 6x3 offcut.. & I cannot possibly get it in with a drill driver. Ive done a 4mm pilot hole 1st- still cant drive one in, & then a 5mm pilot hole- still no way. Screwfix jobs recommended on early page somewhere. I can get it only in half way, but I'm struggling to remove it, let alone drive it thru to fix something behind it. What am I doing wrong here? the spiel says 'self driving in'.. no way/ this is impossible without massive force. Have I got too thick screws or something? do I use a power drill?
-
@Declan52 I'm trying to find what was suggested to fix the top side beams to the top pads.. did you recommend brackets of some sort? (sorry its a needle in a haystack trying to find what was suggested). [Mods: any chance of adding post/ reply numbers ie "in post #54 Onoff refered to X"..? trying to pinpoint something in discussion with only a page as reference is tricky]. Thanks, zoot.
-
Ok thanks will do.
-
@Onoff I've cut my 2 notched pillars.. do I need to treat the exposed ends with gubbins, or are these 6x6 tannalised all thru? Rain scuppering progress tho.. I need a dry 2 days, especially to do the resin fixings. Thanks, zoot
-
@PeterW yes I'm taking build pics, they had to unceremoniously rip out some of my beech hedge y'day (where digger is) which upset me tbh.. but I guess needed to/ access to block & render etc. There's the digger & the forest in background, & behind dumper.. the fkr n'bors.
-
It adds up -only- if you're so masterful at manipulating people, especially on the phone, you persuade the police to turn up. Ist thing PC said was "I was driving by & saw.." utter BLX likely said to disuade me from pointing blame at a n'bor I thought who made a complaint (never seen 1 police car in 3 yrs anywhere around here). My PCSO said same "oh just passing by.." (an odd 'check' visit once/ separate to this, but re. same n'bors tho/ a 2 yr campaign of putting dog muck on my property overnight he's done sweet fk all about) & I could tell immediately it wasn't true.
-
My skin's thick enough now I was MEH when the police were at my door, not an iota of concern as I'm so used to xyz authorities knocking "we've had a complaint" BS (they're forced to visit, once any complaint is made.. so.. n'bors know this, & as I'm not allowed to know who made complaint, they just call/ call/ call, any chance of some NEW opportunity -like dumper- & within minutes they're onto police hamming it up. You just have to live with it, week by week, & not let it stress you. Hard.
-
So they win/ I lose?? that's a feeble copout ProDave. never. this is -exactly- what this wretched bullying me is aimed at doing too no less (& anti-english 50% of it). Its my 1st house. You recall how attatched you were to your 1st house? Ive waited 25 yrs to get a 1st set of keys thanks to damn property prices in england -& Im nearly 50- I love it more than you'll ever know as a result. theyre 70 so, no instead I wait until they die 1st.
-
No flamin way.. Id just not consider it, he'll throw a fit after resheduling it once/ the hassle so far. I'll call him tmrw ev.. but all he'll do is 'smooth talk' me & say all normal etc. He told me the groundwork included a skip, &/ or he'd use the soil himself for some fill job.. both of which BS once I saw the dumper trundling off into the forest. He's canny/ experienced.. & I'm not.
