  1. My main thinking was to reduce the need for double layers of concrete. Is it best to pour and polish it while the building is at dpc level to make it easier to power float the whole area?
  2. @JamesP- so does your system struggle? Seems a shame to install something which isn’t up to its intend job. So you think they missed out on the volume area?
  3. Another learner venturing into mvhr systems. I’m also very early in our project, planning passed and working towards building control application stage/demolition of existing structure.. we are 200m2. Any other recommendations for supplier designs to quote for our system? I will be installing as I’ll be doing most of the build (builder) along with good plumbing/electrician friends. None with much mvhr experience on low energy housing, yet!
  4. @Nickfromwales- cheers, I thought they may be something for fire safety. Is there a discussion somewhere stating pros/cons of first floor insulation for a near passive house? I’m sure I read somewhere about people leaving it out? Seems daft as like you say, acoustic insulation will be beneficial. Apologies for straying off piste of the mvhr discussion.
  5. @Gone West- not an mvhr question but, What are the bowl looking things you have your lighting cables running into in your voids? Thanks
  6. @Dudda- thanks for your informative response. There is a lot of very helpful information in there. Am I right in thinking you didn’t use any reinforcement mesh in your floor? Is this also your main slab or is this a 2nd pour over a structural ground bearing slab? Next step is to try find someone comfortable in placing and grinding the slab to this standard. @Ajn- are any of your partitions structural walls or just timber partitions? I think I follow your timber support. Was that for the concrete to be screeded off to give the correct heigh of your ffl? Was your slab running over the top of your internal blockwork? In your shower room, how did you achieve a fall to your drains ? I assume the whole ground floor slab is flat and you had your slot drains set slightly lower? I’ve seen Americans sink a tub into their wet rooms to allow for a trap to be fitted below the ffl height. Was the bathroom shuttered off and poured separately to be worked by hand? Do you have any in-progress or completed pictures?
  7. Thanks, the supplier even advised against a screed in this situation as he said it doesn’t hold up particularly well as a finished floor. Seems lengthy to lay a slab, screed and then tiles ect. I gather it may work out more cost effective that way. Small cracks could look fine with an industrial looking polished slab. I’ve never seen any on the slabs I’ve poured in the past which have been no bigger than 50m2 but Sod’s law says it’ll crack if you want it to be seen as a finished floor!
  8. I’ve been ‘floating’ the idea of a polished concrete ground floor slab. The build up would be hardcore/insulation/ufh within the slab. Thickness yet to be decided. Has anyone had any success with this? When I speak with my local concrete/screed pump suppliers they said they have stopped offering it as a service due to the concrete cracking due to expansion/contraction. He said it is possible but carries with it the cracking risk, even outside of the usual control joints. Would love to know if anyone has successfully achieved a polished finish with UFH as it seems like a good option for the slab/finished floor.
  9. Yes building them in is by far the easiest method. I’ve done both ways much more than masonry hangers. @tonyshouse - is there any issue with the tray separating the masonry both below and above the joist blockwork courses? I guess it’s no different from a dpc in that it sense.
  10. I really like this! The covered walkway is a nice touch also. I’m planning something similar with a useable storage space above.
  11. I’m sure I read on hear that one m10 has a shear of 13kn. Your putting plenty in but you could always check with your SE.
  12. I use m16 threaded bar resin anchored into the blockwork every other joist spacing. A small chase out of the blockwork would work but as you need to Parge the wall you would need to have your pipes in place. I’m sure I read somewhere about people using airtightness paint in their chases before running cables ect.
  13. Finding a few double stud walls and just reading @jamieled’s blog using Ijoists for studs. Thanks
  14. Great. Will have a read of your blog to save asking daft questions.
  15. Hi @Redoctober- just opening this up again as I’m planning something similar for you garage. What is the footprint of this build? Did you use 8” posts too?
  16. @jamieled- nice! What exactly are as your build method? Raft/trench? Block to dpc? Would love to know more. How complex was your building form too? Cheers.
  17. Are these installed now? Wouldn’t have thought it to be a 3 day job. More like 1 day. I assume your past the point of needing advice on this…
  18. In regards to this post. Do you know of any members who have built using their own ijoist style stud walls rather than a supplied frame?
  19. +1 for oxalic acid. Not very nice, but neither are most cleaning products. Wear good protection. It does bleach the wood so you have to cover the whole area. I sand blast all my oak frame jobs as it gives a much nicer Finnish once the job has been exposed to building site conditions. Oxalic gives instant results but trying to make the whole job look uniform is is the tricky bit. Looking at the amount of steel staining and water marks I would look into a local blaster. Make sure you test a sample before they blast your trusses as I’ve seen some blasters turn oak into driftwood!
  20. Is this a permanent stair? For the price of a straight flight of stairs I would just buy something off the shelf. Your 32x269 would be plenty strong enough if your grooving in the treads/risers. The strings want fixing to the walls if your near a wall. Strings would be best out of joinery grade pse.
  21. All in the name of progress !
  22. I’m in the same boat. Pp to knockdown a semi detached house to rebuild a detached house. Just working on the details around tidying up the neighbours exposed gable and other boundary work as our house is built as part of a garden boundary wall. Look forward to hearing your progress.
  23. @TerryE- I would love to see @ProDave panels. I’ve made timber frame cassettes in the past for garden rooms. So quick to produce and progress. Sadly on that last job osb & 4x2 almost doubled in price. Safe to say the customer opted for some changes in the design to use insulated steel panels for the roof to cut costs.
  24. @Iceverge- I have done a super quick cost up of the build method above I got to £84m2 before I include the cellulose as I couldn’t find a cost for that . These were not my trade prices but pulled off Google searches so could come down a little bit. I did the same for block / 300mm dritherm 32 / block and got to £49 m2. If I times this by roughly 260m2 for my build then the cost difference is £9100 difference in the 2 methods. And one doesn’t include the insulation. I don’t want to rule it out completely but like all things on the build, cost will always inform my choice. If I was charging out my time then it would certainly be cost effective as you could gain back that cost on working time. Happy to put in the work to reduce my costs. If I had a larger budget I would probably buy a timber frame kit and have it water tight in weeks rather than months. Plus the carbon benefits.
  25. Restraint straps are much the same as wall plate straps. 5mm thick steel straps usually with 100mm bend and come in a variety of lengths. These are often part of your floor plan spec. They sit 1/3rd the span of the joist perpendicular to the span. They need solid noggins between the joists to fix the straps to. I cut these in to the joist top and set noggins low so the strap doesn’t foul the flooring. In the past I’ve stood the ledger off the wall at the fixing points with timber to create a void for services to run. I’ve seen it done with compactfoam as an alternative to timber too. Before installing the joists I lay them all out side by side vertically supported at their end points and shuffle them around to get the tops in size order. Even PAR timber can vary by 6mm. Crown the timbers up at this point too.
×
×