Foundations 2 - The pour
Yesterday we completed the excavation of the trenches. I had a half day at work and came back to the site after lunch to get started on the pour.
I was slightly worried about the heavy concrete wagon coming down our access and over the culvert, but the driver did a great job reversing and the road passed the test with flying colours. Our digger driver than used the bucket to spread the concrete as required.
Half way through.
All done.
We now move onto the blockwork next week.
It was a good day and I'm pleased to get this over and done with. Half a day for excavations and half a day for pouring.
Recommended Comments